Quarterly Activities Report

31 Jul 2012 09:00

RNS Number : 8451I
Medusa Mining Limited
31 July 2012
 



Medusa Mining Limited

("Medusa" or the "Company")

 

QUARTERLY ACTIVITIES REPORT

 

PERIOD ENDED 30 JUNE 2012

 

31 July 2012

 

Snapshot of Medusa:

 

- Un-hedged, low cost, dividend paying gold producer focused on organic growth in the Philippines

- Growth path to annualised production of 400,000 ozs per year by end 2015

- Growth underpinned by strong cashflow from Co-O Mine (narrow vein underground)

- FY 2012/13: production guidance of 100-120,000 ozs at cash costs circa US$210/oz

- Current Mineral Resources comprise

- Co-O Mine: Indicated 616k ozs at 12.0 g/t gold; Inferred 1,344k ozs at 8.8 g/t gold

- Bananghilig: Inferred 650k ozs at 1.3 g/t gold

- Current Probable Reserves : Co-O Mine 502k ozs @ 10.1 g/t gold

- Co-O Mine Resources and Reserves to be maintained at current levels

- Conceptual exploration target size ** of Co-O Mine of 3 to 7 million ozs

- Excellent exploration upside: high grade vein and disseminated bulk gold targets, plus eight copper targets

- 820 km2 of tenements and exploration revised budget for FY 2013/14 of US$30M

 

** The potential target size and grade is conceptual in nature, and there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being defined as a mineral resource. Refer to Stock Exchange announcement dated 24 August 2011.

 

Board of Directors:

 

Geoffrey Davis (Non-executive Chairman)

Peter Hepburn-Brown (Managing Director)

Ciceron Angeles (Non-executive Director)

Robert Weinberg (Non-executive Director)

Andrew Teo (Non-executive Director)

 

Capital Structure:

 

Ordinary shares:

188,903,911

Unlisted options:

1,715,000

Performance rights:

250,000

 

Listings:

 

ASX and LSE (Code: MML)

 

Address and Contact Details:

 

PO Box 860

Canning Bridge WA 6153

Telephone: +618 9367 0601

Facsimile: +618 9367 0602

Email: admin@medusamining.com.au

Website: www.medusamining.com.au 

 

OVERVIEW:

 

EXECUTIVE ORDER ON MINING IN THE PHILIPPINES

 

- Positive Executive Order No.79 on mining in the Philippines was released on 9 July 2012.

 

Co-O MINE PRODUCTION & DEVELOPMENT

 

- New Mill: Construction on schedule. Tilted tanks back in operation. New leach tank will be completed by mid-August. Foundations for detoxification unit completed and for crusher and SAG mill advancing. SAG mill 50% delivered. ECC approval is progressing.

 

- Production: 15,557 ounces at a recovered grade of 8.1 g/t gold and cash costs of US$283 per ounce. Production for the FY to 30 June 2012 totalled 60,595 ounces at a recovered grade of 8.1 g/t gold and cash costs of US$261 per ounce. Mill availability was influenced by on-going leach tank repairs.

 

- Saga Shaft:currently at 306 metres. Completion of sink to Level 8 (350 metres) by end of August. Winder in transit to site. Skips and loading pockets manufactured. Completion estimated Q4 in CY12.

 

Co-O MINE RESOURCES & EXPLORATION

 

- The resource for Co-O is currently being compiled.

- Drilling is continuing with six surface and five underground rigs.

- Results include: 2.15 metres at 52.06 g/t gold, 1.20 metres at 21.40 g/t gold, 1.35 metres at 185.21 g/t gold, 2.90 metres at 78.94 g/t gold, 1.55 metres at 31.33 g/t gold, 1.20 metres at 45.03 g/t gold.

 

TAMBIS AREA - BANANGHILIG DEPOSIT

 

- Infill resource drilling in progress with seven rigs with the aim of upgrading majority of resources to Indicated category. Infill drilling should be completed about the end of August 2012

 

- An updated Inferred resource is planned during the September quarter followed by an Indicated resource and reserve when the infill drilling and assaying is completed.

 

LINGIG PROJECT

 

- Lingig Induced Polarisation and Resistivity survey in progress.

 

ANOLING

 

- Drilling with four rigs is continuing.

 

CORPORATE & FINANCIALS (unaudited)

 

- Total cash, cash equivalent in gold on metal account and bullion at site at end of quarter of approximately US$53.5 million.

 

PROJECT OVERVIEW

 

The locations of the Company's projects are shown on Figures 1 and 2 (Please see link at the end of this announcement).

 

EXECUTIVE ORDER ON MINING IN THE PHILIPPINES

 

The President of the Philippines on 9 July 2012 released Executive Order No.79 ("EO") designed to improve the alignment of the Philippines' national and regional interests with those of the mining industry through the updating of key policies, including but not limited to:

 

- Improving transparency of the mining industry;

- Improving the fiscal return to the government from all future projects, primarily through increased royalty payments. The fiscal settings of current operations will be honoured.

- Improving the return and timing of financial benefits to local governments;

- Tightening controls on illegal mining such as banning the use of mercury and restricting legitimate small scale mining activities to gold, silver and chromite;

- Ensuring that mining is not allowed on designated key tourist areas and prime agriculture lands; and

- Enforcement of strict environmental controls.

 

The EO requires the issuing of new implementing rules and regulations within 60 days of the EO publication after which the granting of exploration tenements will re-commence. The granting of construction permits for new projects will commence only after the new fiscal regime has been legislated. The fiscal settings of all existing contracts will be honoured.

 

Implications of the EO

 

Co-O

 

The EO will have no effect on the Co-O operations and the status quo will be maintained for this existing operation as it is linked to an existing mining agreement.

 

There will be no change in the existing tax structure until such time as Congress amends and approves new mining taxes and royalties within the existing Mining Act.

 

Bananghilig

 

The EO will have no immediate impact on the project as the Company can continue to explore, conduct feasibility studies and planning.

 

However, should the feasibility study be positive and the Company commits to constructing the project, timely issuance of the relevant permits to commence construction will be subject to legislation of the new law on mining taxes and royalties being passed by Congress.

Updates will be provided as information becomes available.

 

Anoling

 

The EO will not have any immediate effect on the Anoling project which requires the granting of its MPSA followed by completion of a feasibility study before an application can be submitted for construction permits.

 

The timing of the granting of the MPSA is still unclear and updates will be provided as information becomes available following the issue of new implementing rules within 60 days of the EO with respect to granting of new tenements.

 

In the meantime, drilling can continue to advance the project, however the Company is considering its drilling priorities.

Co-O MINE

 

Gold Production

 

The production statistics for the March 2012 quarter with comparatives for the previous three quarters as well as the year-to-date production statistics are summarised in Table I below.

 

Table I. Gold production statistics

 

Unit

Qtr ended 30 Jun 12

Qtr ended 31 Mar 12

Qtr ended 31 Dec 11

Qtr ended 30 Sep 11

YTD 30 Jun 12

Tonnes mined

WMT

74,969

85,748

71,872

41,596

274,185

Ore milled

DMT

 66,976

 76,002

 68,008

 42,152

253,138

Recovered grade

gpt

8.10

8.10

8.00

8.33

8.10

Recovery

%

92%

92%

93%

93%

92%

Gold produced

ozs

15,557

18,258

16,270

10,510

60,595

Cash costs (1)

US$/oz

$283

$239

$242

$291

$261

Gold sold

ozs

20,000

10,000

10,000

15,446

55,446

Average gold price received

 

US$

$1,624

$1,738

$1,761

$1,587

$1,658

 

Note:

 

(1) Net of development costs and includes royalties and local business taxes

 

Gold production for the quarter was 15,557 ounces, at an average recovered grade of 8.10 g/t gold and cash costs of US$283 per ounce, inclusive of royalties and local business taxes.

 

As previously advised to the market, the mine continues to operate pre-dominantly in development mode to prepare for the future production increase and as a direct consequence of limited shaft haulage capacity, all development ore mined to date has been treated through the mill. The increased amount of development ore treated is the primary reason for the lower production levels for the year, compared to quarters from the previous years. The completion of the Saga Shaft (in the December 2012 quarter) with haulage capacity of 1,500 tpd is expected to solve the current shaft haulage issues.

 

Production for the June quarter was also disrupted due to reduced availability of the milling circuit, as repairs were carried out on four tilting leach tanks as reported on 20 March 2012.

 

Cash costs per ounce for the quarter increased to US$283 per ounce (YTD: US$261 per ounce).

Medusa, an un-hedged gold producer, sold 20,000 ounces of gold at an average price of US$1,624 per ounce during the quarter (YTD: 55,446 ounces at average price of US$1,658 per ounce).

 

Preliminary Development Timetable

 

Graph 1 is the Preliminary Development Timetable and Production Guidance for the new Co-O Phase 3 Mill Expansion and Bananghilig Project.

 

The total estimated Capex (inclusive of mine development and shaft sinking) for the Phase 3 expansion of Co-O is US$70 million which will be funded entirely from the Company's cash flow.

 

New Co-O Mill

 

In November 2010, the Board approved the construction of a new mill with capacity to produce 200,000 ounces of gold per year based on processing up to 750,000 tonnes per year at the current reserve grade of the Co-O Mine.

 

The approval of the application to upgrade the Environmental Clearance Certificate for the current Co-O Mill to 2,500 tonnes per day is progressing.

 

Operations

 

Mine Development

 

Major renovations are continuing at the Co-O Mine to modernise the mine for its expanded production.

 

Acceleration of the lateral development is on-going to ensure the underground infrastructure and on-vein development will be in place for the Saga Shaft. This accelerated development was maintained at similar levels to the previous quarter and consequently maintained the high proportion of development ore supplied to the mill.

 

Sinking of the Saga Shaft progressed smoothly, and is currently at 306 metres depth and is expected at Level 8 (350 metres) by end of August. The winder is in transit to site, and the skips and loading pockets have been manufactured. Manufacture of the permanent headframe is commencing.

 

It is anticipated that the Saga Shaft with a haulage capacity of 1,500 tonnes per day will be completed during the December quarter 2012 and hauling from Level 8 will begin once on-vein development and rises on-vein are commenced from Level 8 through to Level 6.

 

Whilst the milling requirements have been reduced due to the tilting leach tank repairs, the opportunity has been used to upgrade the Baguio Shaft by doubling the skip size and improving the winder capability.

 

The average development metres has increased by 10% and at the end of June 2012 there were 57 development headings of which 50 headings were following veins. Haulage through the current shafts increased by10% during the quarter.

 

Mine Production

 

Ore trucked to the mill during the quarter was primarily development ore and some stope ore.

 

Mill Expansion

 

The current status of activities is:

 

- Priority was given to the returning the tilting leach tanks back into service which has been achieved;

- Construction of the new large leach tank should be completed by mid-August;

- Foundations for the new crushing and grinding sections are advancing on schedule;

- The de-toxification unit foundations are completed and form work is on schedule;

- Approximately 50% of the SAG mill components have been delivered;

- The electrical supply systems to the mine and mill are advanced and the last stage will be completed when the mine is re-wired through the Saga Shaft.

 

Exploration

 

Drilling with six surface rigs and five underground drilling rigs is continuing.

Preparations are underway for an extensive regional Induced Polarisation/Resistivity ("IP/Res") and ground magnetics programme around the Co-O Mine.

 

Drilling results

 

Detailed information is contained in the announcement dated 9 July 2012 which lists intersections down to 0.2 metres downhole width since 16 April 2012.

 

Figure 3 shows the locations of the recently completed or in progress surface drill holes EXP146 to EXP175. Completed holes (excluding EXP169, 170, and 172-175) comprise 25 holes for a total of approximately 16,316 metres. Table II lists the EXP surface diamond drill hole results ≥3 g/t gold over ≥0.5 metres downhole. Assay results are awaited for holes EXP154, EXP161, EXP163 and EXP165 to EXP175.

 

Figure 4 (attached) shows the locations of the recently completed underground drill holes totalling 7,932 metres in 46 holes. Table III lists underground drill hole results ≥3 g/t gold over ≥0.2 metres received since 31 March 2012 as well as some previously completed holes whose locations were shown on Figure 2 in the announcement dated 16 April 2012. Assays are awaited for holes L2-2E-001, L5-35W-109, L5-43E-012, L5-20W-008 and L6-23E-034.

 

Table II.Surface drill hole results ≥3 g/t gold and ≥0.5 metres downhole for previously completed holes EXP138 to EXP145 and new holes EXP146 to EXP164.

 

Hole number

East

North

Dip (°)

Azimuth (°)

From (metres)

Width (metres)

Grade (uncut) (g/t gold)

EXP 140

614659

913216

-54

180

309.20

1.00

3.07*

484.35

1.20

15.73*

488.05

1.00

6.08*

499.90

1.45

6.91*

604.60

0.50

27.93*

609.45

1.45

7.76*

640.15

1.35

5.94*

EXP 141

614550

912992

-69

180

344.20

1.00

4.30*

568.85

0.55

4.77*

746.00

1.00

3.75*

EXP 142

614604

913032

-55

180

593.75

1.00

4.22*

637.65

3.00

3.79*

EXP 144

614519

913082

-51

180

219.00

1.00

3.87*

459.00

1.00

8.93*

496.85

1.00

21.70*

532.70

0.90

7.19*

634.45

1.00

8.47*

EXP 145

614442

912987

-69

180

397.30

2.15

52.06*

620.00

2.25

3.25*

EXP 146

614550

913122

-66

180

370.80

1.60

3.27*

432.90

1.20

21.40*

527.50

0.75

60.46*

620.50

1.00

3.53*

735.05

1.35

16.66*

EXP 147

614394

913026

-67

180

520.60

1.00

9.70*

EXP 149

61439

913101

-64

180

141.20

1.40

3.41*

362.55

1.45

6.12*

528.25

0.50

8.43*

682.05

2.00

3.15*

742.25

2.10

3.32*

EXP 150

614129

913260

-51

180

154.45

0.55

3.28*

517.10*

1.00

4.73*

EXP 151

614442

912987

-57

180

349.60

2.70

5.67*

384.40

1.20

3.82*

535.30

1.85

5.20*

602.90

2.75

6.60*

644.15

0.90

52.33*

EXP 156

614199

913138

-55

180

187.05

0.75

15.33*

193.10

0.55

7.07*

303.00

1.00

3.86*

377.60

1.45

3.33*

423.85

1.00

3.32*

483.45

0.90

31.84*

536.05

1.35

185.21*

EXP 157

614510

913158

-49

180

310.30

1.00

4.19*

441.45

2.90

78.94*

543.90

3.00

10.20*

EXP 160

614354

912823

-52

180

226.60

1.50

8.17*

 

Notes:

 

(i) Intersection widths are downhole drill widths not true widths;

(ii) Assays denoted by (*) are by Philsaga Mining Corporation's laboratory, all other assays are by Intertek McPhar Mineral Services Inc. in Manila;

(iii) Intersection widths are downhole drill widths not true widths;

(iv) Grid coordinates based on the Philippine Reference System 92.

 

 

Table III.Underground drill hole results ≥3 g/t gold and ≥0.5 metres downhole for new holes and previously completed holes designated †.

 

Hole number

East

North

Dip (°)

Azimuth (°)

From (metres)

Width (metres)

Grade (uncut) (g/t gold)

 

LEVEL 2

L2-057†

 

 

613275

 

 

912928

 

 

0

 

 

61

 

 

20.90

 

 

1.00

 

 

4.41*

 

LEVEL 3

L3-028†

 

613733

 

912898

 

3

 

143

 

83.45

 

0.55

3.13*

 

LEVEL 5

 

L5-087†

25.50

0.70

4.80*

 

82.75

0.90

16.50*

 

85.80

0.50

17.41*

 

127.55

0.70

3.32*

 

L5-091†

613615

912851

0

63

47.95

1.05

17.57*

 

288.80

0.90

3.47*

 

 

L5-092†

613951

912921

-60

226

14.20

2.05

18.76*

 

97.65

1.05

3.42*

 

102.90

1.00

8.73*

 

121.30

1.35

4.34*

 

240.45

1.70

4.50*

 

243.60

0.70

3.59*

 

L5-096†

613613

912853

0

27

0.00

0.80

3.84*

 

67.15

0.95

9.37*

 

L5-105†

614196

912960

0

202

2.15

0.65

15.17*

 

67.15

0.95

9.37*

 

L5-20W-003

613760

912853

0

177

5.30

0.55

26.40*

 

L5-20W-004

613759

912853

0

204

6.45

1.15

24.75*

 

L5-20W-007

613764

912855

-18

133

5.00

2.30

10.01*

 

L5-35W-108

613606

912814

0

171

1.10

0.90

5.34*

 

L5-35W-109

613605

912814

0

189

6.50

0.50

3.62*

 

L5-35W-110

613604

912814

0

215

61.00

0.60

29.33*

 

L5-35W-111

613602

912814

0

230

34.50

0.80

10.18*

 

60.80

0.60

8.50*

 

L5-42E-013

614377

912690

-22

305

27.35

0.95

45.18*

 

70.05

0.75

13.25*

 

74.00

2.10

12.59*

 

246.80

1.60

26.85*

 

397.20

2.00

6.02*

 

L5-42E-014

614378

912690

-22

314

137.60

1.60

10.92*

 

159.50

2.30

17.44*

 

184.70

1.00

4.61*

 

L5-42E-015

614379

912691

0

321

22.50

0.50

7.50*

 

130.85

0.75

3.57*

 

156.30

1.60

10.71*

 

Hole number

East

North

Dip (°)

Azimuth (°)

From (metres)

Width (metres)

Grade (uncut) (g/t gold)

LEVEL 6

L6-027

614213

912727

3

71

77.80

0.50

13.40*

L6-028

614213

912727

3

68

79.40

1.10

25.60*

L6-029

614213

912726

3

139

29.90

1.35

3.81*

L6-23E-030

614212

912724

0

167

5.30

1.20

23.37*

L6-23E-031

614208

912725

0

206

5.65

1.55

31.33*

L6-23E-033

614207

614207

0

225

8.40

1.20

45.03*

10.70

2.50

23.47*

 

Notes:

 

(i) Intersection widths are downhole drill widths not true widths;

(ii) Assays denoted by (*) are by Philsaga Mining Corporation's laboratory, all other assays are by Intertek McPhar Mineral Services Inc. in Manila;

(iii) Intersection widths are downhole drill widths not true widths;

(iv) Grid co-ordinates based on the Philippine Reference System 92.

 

Figure3 (please see link at the end of this announcement) shows a map of the Co-O Mine Level 6 plan showing the locations of new drill holes EXP146 to EXP175.

 

Figure 4 (please see link at the end of this announcement) shows a map of the Co-O Mine Level 6 plan showing the locations of the new underground drill holes.

 

Co-O Drill Hole Sampling and Assaying Procedures

 

Samples are taken from mainly HQ sized (hole outside diameter 96 mm, hole inside diameter 63.5mm) and some NQ sized (hole outside diameter 75.8 mm, hole inside diameter 47.6 mm) drill core. The selected sample intervals are halved by diamond saw and half the core is bagged, numbered and sent to the Company laboratory. In a small number of cases to confirm the geological logging, the selected interval was re-split and ¼ core re-submitted for assay.

 

Initial sample preparation and assaying is undertaken at the Company's on-site laboratory. Samples are dried at 105ºC for 6 to 16 hours, crushed to less than 1.25 cm by jaw crusher, re-crushed to less than 50 mm using a secondary crusher followed by ring grinding of 1kilogram of sample to nominal particle size of less than 200 mesh. Barren rock wash is used after every five samples in the preparation equipment. The samples are assayed by fire assay with Atomic Absorption Spectrometer (AAS) finish on a 30 gram sample. All assays over 5 g/t gold are re-assayed using gravimetric fire assay techniques on a 30 gram sample. Duplicate samples are inserted every 10 samples and standard samples are included in every sample batch.

 

Check assaying of samples used in the yearly resource estimates is undertaken by Intertek McPhar Mineral Services ("Intertek"), a NATA and ISO 9001/2000 accredited laboratory in Manila. The pulps are airfreighted to Intertek who fire assay 30 grams of samples using AAS finish and a selected number of samples are checked using gravimetric fire assay techniques. Duplicate samples and standards are included in each batch of check samples. When reporting results, where available, the assays of Intertek as an independent laboratory have been given priority over the Company laboratory's results.

 

Health and Safety

 

Lost time accident frequency rate (LTAFR) for the year is 1.04 including exploration. By comparison, the latest West Australian gold mining industry figure available to 30 September 2011 was 3.10, excluding exploration statistics of 6.70.

 

There were no breaches of any of the project's operating regulations during the quarter.

 

TAMBIS REGION

 

The Tambis project comprising the Bananghilig Gold Deposit (Fig. 2) is operated under a Mining Agreement with Philex Gold Philippines Inc. over Mineral Production Sharing Agreement ("MPSA") 344-2010-XIII which covers 6,262 hectares.

 

The Executive Order on Mining dated 6 July 2012, issued by the President of Philippines will have no immediate impact on the Bananghilig Project as the Company can continue to explore, conduct feasibility studies and planning.

 

However, should the feasibility study be positive and the Company commits to constructing the project, timely issuance of the relevant permits to commence construction will be subject to legislation of the new law on mining taxes and royalties being passed by Congress.

 

Updates will be provided as information becomes available.

 

BANANGHILIG PROJECT

 

In July 2010, new regional and detailed mapping and drilling programmes were commenced with the aim of validating the current resource of 650,000 ounces of gold and extending it to provide a reserve of approximately 1,000,000 ounces. This reserve would form the basis for a feasibility study which would target production of 200,000 ounces of gold per year from a new milling facility.

 

The announcement of 12 September 2011 summarises the Tambis regional geological setting, local geological setting, deposit description and mineralisation, shows a typical cross-section through the deposit and the drill hole intersections obtained for the period 24 July 2010 to 31 August 2011. Additional information is contained in the September 2011 quarterly report dated 24 October 2011 and in a drilling update on 17 January 2012.

 

Current drilling is focused on infill to upgrade the resources to the Indicated category. The infill programme totals approximately 18,200 metres and is on track to be completed around the end of August 2012.

 

A further update of drilling results and a new Inferred resource estimate are planned for the September quarter 2012.

 

USA PORPHYRY COPPER-GOLD PROSPECT

 

A Memorandum of Agreement with Corplex Resources Inc. covers the Usa prospect which is located within MPSA application XIII-00077. Processing of the tenement application is progressing.

 

LINGIG

 

The Lingig prospect is located in Mineral Production Sharing Agreement 343-2010-XIII with an area of 3,824 hectares over which the Company has an operating agreement.

 

The IP/Res and ground magnetics survey is underway.

 

ANOLING

 

The Mines Operating Agreement with Alcorn Gold Resources Inc. covers MPSA application 039-XIII situated approximately 8 kilometres by road to the north of the millsite as shown on Figure 2.

 

The Executive Order on Mining dated 6 July 2012, issued by the President of Philippines will not have any immediate effect on the Anoling Project which requires the granting of its MPSA followed by completion of a feasibility study before an application can be submitted for construction permits.

 

The timing of the granting of the MPSA is still unclear and updates will be provided as information becomes available following the issue of new implementing rules within 60 days of the EO with respect to granting of new tenements.

 

Four drill rigs are currently operating with on-going mapping, trenching and sampling, however the Company is assessing its drilling priorities.

 

SAUGON PROJECT

 

First Hit Vein

 

Background

 

Figure 2 shows the Saugon Project located approximately 28 kilometres by road from the Co-O Mill. Work in 2004 involved drilling at the First Hit Vein (holes SDDH-001 to SDDH-035) in conjunction with underground development via a 30 metre deep inclined winze down the vein-breccia to assist in understanding the mineralisation.

 

Further details are contained in the announcements dated 20 April 2010 which summarised the historical results and 1 December 2010 which contained drilling results for holes SDDH-36 to SDDH-64A and the March 2012 quarterly report contained results for holes SDDH 65-104.

 

Exploration

 

Regional mapping, trenching and sampling are continuing.

 

FINANCIALS (unaudited)

 

As at 30 June 2012, the Company which is debt free, had total cash, cash equivalent in gold on metal account and bullion at site of approximately US$53.5 million (31 Mar 2012: US$71.3 million).

 

During the June 2012 quarter,

 

- the Company sold 20,000 ounces of gold at an average price of US$1,624 per ounce (Mar 2012 qtr: sold 10,000 ounces at an average price of US$1,738 per ounce). Year to date gold sales totalled US$91.98 million from the sale of 55,446 ounces at an average price of US$1,659 per ounce;

- incurred exploration expenditure of US$11.6 million (Mar 2012 qtr: US$8.2 million, YTD: US$35.1 million);

- spent US$10.4 million on capital works, associated sustaining capital at the mine and mill and also costs for the new mill construction and infrastructure (Mar 2012 qtr: US$7.6 million, YTD: US$27.0 million); and

- spent US$7.4 million on general and accelerated mine development, inclusive of shaft sinking costs (Mar 2012 qtr: US$9.0, YTD: US$31.0 million).

 

Peter Hepburn-Brown, Managing Director of Medusa, commented:

 

"We have made pleasing progress with the mill construction during the quarter particularly with returning the tilting leach tanks back into service, approaching completion for the new leach tank, and establishing the foundation work for the crusher, SAG mill and detoxification unit. It is also comforting that the SAG mill components have started to arrive at site on schedule.

 

At the mine, the pace of ancilliary activities is picking up in preparation for the Saga Shaft reaching target depth at the end of August. This includes the imminent arrival of the winder, completed manufacturing of the new skips and loading pockets, commencement of manufacturing of the permanent headframe, and finishing the installation of the surface electricals to accommodate the new winder and then complete the re-wiring of the Co-O Mine

The commencement of haulage from the Saga Shaft in the December quarter will mark a major achievement in the Co-O expansion programme. This means that this FY's production guidance of 100-120,000 ounces will be weighted into the second half of the year."

 

For further information please contact:

 

Australia

Medusa Mining Limited

+61 8 9367 0601

Geoffrey Davis, Chairman

Peter Hepburn-Brown, Managing Director

United Kingdom

Fairfax I.S. PLC

+44 (0)20 7598 5368

Financial Adviser and Broker

Ewan Leggat/Laura Littley

 

Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr Geoff Davis, who is a member of The Australian Institute of Geoscientists. Mr Davis is the Chairman of Medusa Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a "Competent Person" as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Mr Davis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Information in this report relating to Mineral Resources has been estimated and compiled by Mark Zammit of Cube Consulting Pty Ltd of Perth, Western Australia. Mr Zammit is a member of The Australasian Institute of Mining & Metallurgy and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Mr Zammit consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Information in this report relating to Ore Reserves is based on information compiled by Dr Spero Carras of Carras Mining Pty Ltd. Dr Carras is a Fellow of the Australasian Institute of Mining & Metallurgy and has 30 years of experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Dr Carras consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

DISCLAIMER

 

This announcement may contain certain forward-looking statements. The words 'anticipate', 'believe', 'expect', 'project', 'forecast', 'estimate', 'likely', 'intend', 'should', 'could', 'may', 'target', 'plan' and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements.

 

Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Medusa, and its officers, employees, agents and associates, that may cause actual results to differ materially from those expressed or implied in such statements.

 

Actual results, performance or outcomes may differ materially from any projections and forward-looking statements and the assumptions on which those assumptions are based.

 

You should not place undue reliance on forward-looking statements and neither Medusa nor any of its directors, employees, servants or agents assume any obligation to update such information.

 

To view Figures and Preliminary Development Timetable, please click on or paste the following link in your browser:

 

http://www.rns-pdf.londonstockexchange.com/rns/8451I_-2012-7-30.pdf

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFSEDFIIVIF
Date   Source Headline
9th May 20148:00 amRNSInvestor Presentation
29th Apr 20148:00 amRNSQuarterly Activities Report 31 March 2014
7th Apr 201410:24 amRNSFurther re Intended Delisting from the LSE
4th Apr 20147:00 amRNSIntended Delisting and Cancellation from LSE
5th Mar 20148:30 amRNSInvestor Presentation
27th Feb 20148:05 amRNSHalf Yearly Report
27th Feb 20148:00 amRNSHighlights of the Half Yearly Report
13th Feb 20148:32 amRNSFatality Underground
30th Jan 20148:00 amRNSQuarterly Activity Report
28th Jan 20148:00 amRNSOperations Update
21st Jan 20148:00 amRNSOperations Update
3rd Jan 201412:11 pmRNSHolding in Company
9th Dec 20138:30 amRNSNew SAG Mill Update - Power Cells
29th Nov 20137:00 amRNSCancellation of Unquoted Securities
25th Nov 20137:00 amRNSIssue of Equity
22nd Nov 20138:32 amRNSResult of AGM
22nd Nov 20138:31 amRNSRetiring Chairman's Address
22nd Nov 20138:30 amRNSOperations Update - Powercells for SAG Mill
22nd Nov 20137:01 amRNSRetirement and Appointment of Chairman
22nd Nov 20137:00 amRNSAGM Statement
11th Nov 20138:28 amRNSTYPHOON HAIYAN
8th Nov 20138:00 amRNSInvestor Presentation
1st Nov 201310:04 amRNSHolding in Company
31st Oct 20138:30 amRNSCompletion of A$34 million placement
30th Oct 20137:00 amRNSPROPOSED PLACEMENT TO RAISE UP TO AUD25 MILLION
29th Oct 20138:45 amRNSQuarterly Activity Report
23rd Oct 20139:00 amRNSSAG MILL UPDATE
18th Oct 20138:00 amRNSNotice of AGM
4th Sep 20138:00 amRNSOperations Update - New Mill and Level 8
27th Aug 20138:48 amRNSFinal Results and Annual Financial Report
8th Aug 20138:00 amRNSMineral Reserve & Resource Update
5th Aug 20138:00 amRNSCancellation of Unquoted Securities
12th Jul 20138:49 amRNSHolding in Company
8th Jul 20137:00 amRNSCo-O Operations Update
4th Jul 20138:43 amRNSHolding in Company
28th Jun 201310:18 amRNSHolding in Company
28th Jun 201310:17 amRNSHolding in Company
28th Jun 201310:16 amRNSHolding in Company
21st Jun 20132:32 pmRNSHolding in Company
21st Jun 20138:18 amRNSCo-O Mill Expansion Project Managers Appoint Admin
20th Jun 201311:48 amRNSHoldings in Company
7th Jun 20139:26 amRNSHoldings in Company
31st May 20138:00 amRNSRetirement and Appointment of CFO
7th May 20137:00 amRNSDirectors' Shareholdings
3rd May 20139:00 amRNSDirector's Shareholding
30th Apr 20139:00 amRNSQuarterly Activity Report
16th Apr 20139:00 amRNSPresentation at Proactive Investors Forum
12th Apr 20138:00 amRNSUpdated Investor Presentation
11th Apr 20139:30 amRNSUpdate on Bananghilig Scoping Study
9th Apr 20139:00 amRNSBananghilig Gold Deposit Scoping Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.