The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMMK.L Regulatory News (MMK)

  • There is currently no data for MMK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MMK launced 2nd stage of new cold rolling complex

16 Jul 2012 17:32

RNS Number : 7867H
OJSC Magnitogorsk Iron &Steel Works
16 July 2012
 



 

Open Joint Stock CompanyMagnitogorsk Iron and Steel Works(MMK)

July 16, 2012, Magnitogorsk

 

Magnitogorsk Iron & Steel Works (MMK) launched the second stage of its new cold rolling complex today in the presence of Russian President Putin

 

The complex, capable of producing 2 mtpa of finished products, will primarily produce high-quality cold-rolled and galvanized steel to be used in the production of exterior and interior car parts, as well as for use by home appliance manufacturers and the construction industry. MMK's total investment in the project is RUB 44.5 billion, including the cost of the equipment - €490 million.

The decision to build the cold rolling plant for producing world-class automotive body parts was made by MMK Board of Directors Chairman Victor Rashnikov in February 2007. The need to launch new capacity emerged with the increase in demand for high-quality cold roll products, primarily from car makers.

The contract to deliver the equipment for the first stage of the cold rolling complex - the Mill 2000 - was signed by MMK in July 2007 with the German machinery maker SMS-DEMAG.

Construction began in March 2008. In July 2011 the first stage of the complex (a continuous turbulent pickling line linked to the five-stand cold-rolling Mill 2000) came on line, with Vladimir Putin participating in the launch ceremony. He noted the significance of this project to Russia's entire industrial sector.

The new cold rolling facility (Rolling Workshop No. 11) is equipped with a continuous turbulent pickling line linked to a five-stand cold-rolling mill with a capacity of 2.1 mtpa, a continuous hot galvanizing unit (450 ktpa), a combined annealing/hot-galvanizing unit (650 ktpa), a working roll grinding and texturing unit, a coil inspection and slitting line, as well as cold-worked and galvanized coil packaging lines. The gauge of finished products can range from 0.28-3.0 mm thick and 850-1880 mm wide cold-rolled sheets in coils weighing up to 43.5 metric tons. The production capacity of the new complex is as follows: 700 kt of galvanized steel, 400 kt of cold-rolled products, 900 kt of cold-worked coils. The maximum mill speed is 1500 m per minute.

According to plans, by the end of the current year the complex will attain full capacity. Through the realization of this project, MMK will increase the share cold-roll and hot-galvanized products in its sales portfolio, expand its assortment of high-grade products and provide automakers with high-quality cold-roll and galvanized sheet metal, including such high strength grades as HSLA, IF-HSS, BH, two-phase, multi-phase and TRIP steel, corresponding to all the modern requirements for such products.

The new cold rolling complex is situated on a 155,000-sqm territory - covering the equivalent of more than 20 soccer fields. The complex stretches approximately 2 km in length and the main equipment installed alone weighs 40 kt. The construction of the plant required 150,000 cubic meters of reinforced concrete and 54 kt of metal structures. At times the construction of this gigantic facility required the efforts of up to 2500 construction workers.

According to MMK Chairman of the Board Victor Rashnikov, "with the launch of MMK's cold rolling mill, both Russian and foreign automakers working in this country will have the opportunity to use Russian milled steel products which meet the highest world standards."

Contacts for the press:

Kirill Golubkovtel.: +7 (916) 675 3081kgolubkov@mmk.ru

Elena Evstigneevatel.: +7 (985) 763 4443evstigneevaed@mmk.ru

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLGDRBXBBGDL
Date   Source Headline
13th Mar 20087:00 amRNSAcquisition
11th Mar 20089:13 amRNSNotice of Results
27th Feb 200810:12 amRNSDividend payout 1H2007
15th Feb 20088:29 amRNSresults of board meeting
5th Feb 20088:49 amRNSAcquisition
23rd Jan 200810:35 amRNSResult of EGM
17th Jan 200811:32 amRNSQ4 & Y2007 operational result
9th Jan 200812:32 pmRNSDividend payment
27th Dec 20077:00 amRNSAmendment to Assn
18th Dec 20079:59 amRNSResults of the Board Meeting
5th Dec 200710:32 amRNSCancels Treasury Shares
4th Dec 20077:51 amRNS3rd Quarter Results
28th Nov 200712:13 pmRNSNotice of Results
17th Oct 200710:32 amRNS3rd Qtr Production Results
4th Oct 200710:11 amRNSAcquisition
3rd Sep 20079:53 amRNSInterim Results
31st Aug 20078:34 amRNSResult of EGM
28th Aug 20077:00 amRNSNotice of Results
15th Aug 200711:14 amRNSAcquisition - Replacement
15th Aug 200710:41 amRNSAcquisition
10th Aug 200710:43 amRNSAcquisition
3rd Aug 20078:11 amRNSAcquisition
31st Jul 20078:09 amRNSNotice of EGM
16th Jul 20071:29 pmRNSStatement re conference call
13th Jul 20079:36 amRNSNotice of EGM
12th Jul 20071:14 pmRNSTrading update for H1 2007
20th Jun 20077:00 amRNS1st Quarter Results
11th Jun 20077:00 amRNSHolding(s) in Company
31st May 20075:09 pmRNSStabilisation Notice
29th May 20079:49 amRNSReorganization of CJSC RFZ
29th May 20077:00 amRNSDividend payment
25th May 200711:39 amRNSOver-allotment option
23rd May 200712:22 pmRNSRe Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.