Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.05
Bid: 3.00
Ask: 3.10
Change: 0.00 (0.00%)
Spread: 0.10 (3.333%)
Open: 3.05
High: 3.05
Low: 3.05
Prev. Close: 3.05
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Snow Leopard 1 Well Results

20 Sep 2018 07:00

RNS Number : 3215B
Petro Matad Limited
20 September 2018
 

 

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY PETRO MATAD LIMITED TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

20 September 2018

Petro Matad Limited

("Petro Matad" or the "Company")

Snow Leopard 1 Well Results

Petro Matad, the AIM quoted Mongolian oil explorer, provides a summary of the results from its Snow Leopard 1 well:

 

The Snow Leopard-1 well, drilled in Petro Matad's 100% owned and operated Block V, and the first oil exploration well ever drilled in the 60,000km2 Valley of the Lakes basin complex of central Mongolia, has reached total depth of 2930m MD in granitic basement.

 

No sands were encountered at the shallower of the two primary targets of the well although drilling gases (C1 to C5) and an oil sheen in the drilling mud were observed across the interval. The gases are believed to be indicative of an active petroleum system in the basin and the oil observed in the mud is suspected to have entered the well from one of the prospect bounding faults which may be acting as a conduit for migrating oil.

 

The deeper objective of the well was encountered on the pre-drill depth prognosis with good development of sandstones in an overall gross interval of more than 400m. However, no oil or gas shows were observed while drilling through these sediments and subsequent logging confirmed them to be water bearing. The absence of hydrocarbon shows is being investigated. The primary pre-drill risk for this target was effectiveness of the fault bounded trap. Given the evidence of an active petroleum system in the basin, with confirmed source and reservoir outcrops on the basin flanks and well-developed source and reservoir intervals in the well, the lack of shows at this level appears to be prospect specific, with the bounding fault either not sealing or having been breached.

 

The Snow Leopard-1 well will now be plugged and abandoned and the post well evaluation will commence. Initial examination of cuttings samples and wireline logs indicates the presence of a significant thickness of source rocks in the well, including claystone layers with a 'hot shale' wireline log response. The hot shale response can be an indicator of very high organic content (and hence very good source potential) and this will be investigated as the presence of thick, rich source rocks will have a positive impact on de-risking the surrounding prospects in the Taats basin and the adjacent basins.

 

Once operations are complete at Snow Leopard, the rig will move to the Wild Horse 1 location, a mobilisation distance of some 450km. The Wild Horse prospect, targeting 480 MMbo of prospective resource, is a large four-way dip and fault bounded closure in the Baatsagaan Basin in Petro Matad's Block IV. The Company has completed all pre-drill formalities for Wild Horse 1, has all the required approvals in hand and has engaged proactively with local stakeholders. A further update will be provided when the well spuds.

 

Mike Buck, the CEO of Petro Matad said:

"Whilst Snow Leopard 1 did not find the oil accumulations we had hoped for there are encouraging signs in terms of confirmation of source and reservoir rock development. The presence of oil and wet gas shows has heightened our interest in the other prospects mapped in the Taats basin. We are working these up now based on the wealth of information gathered in the well.

 

Operational attention now shifts to the high impact Wild Horse well which offers huge prospective resource potential and significant follow up in prospects and leads mapped in the Baatsagaan basin."

 

For more information, please contact:

 

Petro Matad Limited

Mike Buck, CEO

+97 670 141 099 / +97 675 751 099

Stockdale Securities Limited (Nominated Adviser and Broker)

Richard Johnson

Andy Crossley

David Coaten

+44 (0) 20 7601 6100

 

Stifel Nicolaus Europe Limited (Broker)

Callum Stewart

Nicholas Rhodes

Ashton Clanfield

+44 (0) 20 7710 7600

 

FTI Consulting (Communications Advisory Firm)

Sara Powell

Ben Brewerton

+44 (0) 20 3727 1000

 

All Reserves and Resources definitions and estimates shown in this report are based on the 2007 SPE/AAPG/WPC/SPEE Petroleum Resource Management System ("PRMS").

Technical information in this news release has been reviewed by the Company's Exploration Manager, Mr. Jerry Smart. He has 36 years of industry experience in oil and gas exploration and production with LASMO, Eni, Salamander Energy and Ophir Energy. He holds a B.Sc. in Geology from King's College, London.

Glossary

MMbo

million barrels of oil

Prospective Resources

estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled

MD

Drilling gases (C1 to C5)

measured depth

hydrocarbon gases entering the drilling mud whilst drilling are continuously monitored and analysed. In the Snow Leopard 1 well, hydrocarbon gases from Methane (C1) up to Pentane (C5) were detected.

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,340 square kilometres in the far eastern part of the country, and Blocks IV and V have an area of 28,900 square kilometres and 21,100 square kilometres, respectively, in the southwest part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKCDBABKDOCD
Date   Source Headline
31st Jul 20121:43 pmRNSTotal Voting Rights
26th Jul 20123:15 pmRNSDirector/PDMR Shareholding
9th Jul 20129:08 amRNSIssue of Equity
29th Jun 20127:00 amRNSFinal Results
25th May 20127:00 amRNSUpdate on oil shale operations
26th Apr 20123:53 pmRNSIssue of Equity and Award of Options
24th Apr 20127:23 amRNSPresentation to AAPG and Operations Update
20th Apr 20121:54 pmRNSChanges to Senior Management
2nd Apr 20121:39 pmRNSTotal Voting Rights
27th Mar 20127:00 amRNSDirectorate Change
13th Mar 20127:00 amRNSDirectorate Change
5th Mar 20129:50 amRNSIssue of Equity
13th Feb 20128:57 amRNSIssue of Equity
1st Feb 20127:00 amRNSRe-organisation of Nomad and Joint Broker
27th Jan 20127:00 amRNSDirectorate Change
18th Jan 20129:29 amRNSManagement change
2nd Dec 20119:24 amRNSTotal Voting Rights and Share Capital
21st Nov 201110:42 amRNSIssue of Equity and Director's Holding
17th Nov 20111:30 pmRNSOperational Update
10th Nov 20118:06 amRNSChange of Adviser
4th Nov 201110:49 amRNSOperational Update
2nd Nov 201110:40 amRNSResult of AGM
17th Oct 20111:07 pmRNSOperational Update
7th Oct 201111:48 amRNSNotice of AGM
30th Sep 20117:00 amRNSHalf Yearly Report
30th Sep 20117:00 amRNSOperational Update
27th Sep 20112:18 pmRNSOperational Update
14th Sep 201112:44 pmRNSExtension and Relinquishment of Licence Areas
9th Sep 201110:17 amRNSOperational Update
31st Aug 20119:39 amRNSTotal Voting Rights
30th Aug 20117:00 amRNSOperational Update - DT9
30th Aug 20117:00 amRNSOperational Update - DT1
22nd Aug 20117:00 amRNSOperational Update
5th Aug 20113:52 pmRNSIssue of Equity
4th Aug 201110:43 amRNSSpudding of DT-9
2nd Aug 20113:04 pmRNSOperational Update
14th Jul 201110:19 amRNSOperational Update
30th Jun 201111:33 amRNSTotal Voting Rights
27th Jun 20113:07 pmRNSSpudding of DT-7
23rd Jun 20111:50 pmRNSOperational Update
21st Jun 20117:00 amRNSFinal Results
10th Jun 20111:52 pmRNSIssue of Equity
9th Jun 201111:05 amRNSBlock XX Drilling Programme
8th Jun 20119:35 amRNSOperational Update
23rd May 201112:33 pmRNSDirectorate Change
19th May 20119:30 amRNSBlock XX Drilling Programme
16th May 201112:38 pmRNSOperational Update
4th May 20111:22 pmRNSDT-4 Operational Update
3rd May 20111:03 pmRNSTotal Voting Rights
28th Apr 201111:48 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.