Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Operational Update

22 Aug 2024 07:00

RNS Number : 3165B
Petro Matad Limited
22 August 2024
 

22 August 2024

Petro Matad Limited

("Petro Matad" or the "Company")

Operational Update

Petro Matad Limited ("Petro Matad" or "the Company"), the AIM quoted Mongolian oil company, provides the following operational update.

Highlights

· The Heron-1 oil discovery well has been re-entered, stimulated and completed for production in a trouble free operation.

· Neighbouring operator PetroChina has provided oil storage tanks that will complete the surface configuration for the production well site facilities.

· DQE Drilling has been approved as the winning tenderer for the 2024 drilling programme and the rig to drill Heron-2 is expected to start mobilisation by the end of August with spud anticipated in mid-September. The smaller rig for Gobi Bear-1 well is expected to mobilise by mid-September and spud before month's end.

Heron-1 reservoir stimulation and down-hole completion

Work on the Heron-1 discovery well has been completed with the down-hole pump installed ready for production following a successful reservoir stimulation programme. The well was found to be in good condition and the perforated zone from 2834m to 2846m in the Lower Tsagaanstav Formation from which the well flowed at 821 bopd on test was successfully isolated and hydraulically stimulated. Pressure responses observed during the stimulation were consistent with a successful operation and oil was observed during the subsequent recovery of the stimulation fluid. All completion equipment has been demobilised and the well site prepared for the installation of production facilities.

Surface equipment installation and preparations for production

Already purchased production facilities are ready to be installed and neighbouring operator PetroChina has provided spare oil storage tanks at nominal cost which are now being integrity tested and which will complete the production site configuration. It is planned to install and commission the surface facilities during the current operational window and the approval process for the construction permit required for installation of the facilities is at an advanced stage.

Discussions with PetroChina and industry regulator, the Mineral Resources and Petroleum Authority of Mongolia (MRPAM), on processing, transport and sales of Block XX production are continuing. The sharing of facilities is covered under an MoU signed with PetroChina in 2021 and is fully supported by MRPAM.

Preparations for the 2024 drilling programme

The contract for the drilling of two wells in the Block XX Exploitation License area has been agreed with PetroChina's drilling subsidiary DQE Drilling and approved by MRPAM. Mobilisation of the rig to drill the Heron-2 well is planned to begin before the end of August with well spud expected by mid-September. Heron-2 will be drilled to a total depth of c.2,900m and the anticipated timing will allow for a full evaluation of the well results, flow testing and completion within the current operational window.

A smaller rig for the high impact, low cost Gobi Bear-1 exploration well is expected to mobilise to site in the first half of September and to spud before month's end. The planned total depth of 1,800m should be reached in good time to allow for logging and, if merited, testing before the normal winter operational shutdown in late November.

Mike Buck, CEO of Petro Matad, said:

"With the Heron-1 down-hole completion now ready for production startup, the well site has been prepared for the installation of the surface production facilities. We are pleased to have concluded our negotiations with DQE and look forward to continuing to work with them on the 2024 drilling programme.

The team is now working at pace to spud Heron-2 in mid-September and to secure the required construction permits for Heron-1."

Further updates will be provided as the 2024 work programme progresses.

 

- Ends -

Further information please contact:

Petro Matad Limited

Mike Buck, CEO

+976 7014 1099 / +976 7575 1099

 

Shore Capital (Nominated Adviser and Broker)

Toby Gibbs

Rachel Goldstein

 

 

+44 (0) 20 7408 4090

Zeus (Joint Broker)

Simon Johnson

Louisa Waddell

 

 

+44 (0) 20 3829 5000

FTI Consulting (Communications Advisory Firm)

Ben Brewerton

Christopher Laing

Catrin Trudgill

 

+44 (0) 20 3727 1000

 

Technical information in this news release has been reviewed by the Company's Technical Manager, Mr. Jerry Smart. He has over 40 years of industry experience in oil and gas exploration and production with LASMO, Eni, Salamander Energy and Ophir Energy. He holds a B.Sc. in Geology from King's College, London.

 

About Petro Matad

Petro Matad is the parent company of a group focused on oil exploration, as well as future development and production in Mongolia. Currently, Petro Matad holds 100% working interest and the operatorship of the Matad Block XX Production Sharing Contract with the government of Mongolia. Block XX has an area of 214 square kilometres in the far eastern part of the country.

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSELFIFELSEEA
Date   Source Headline
28th May 202612:00 pmRNSResult of AGM
28th May 20267:00 amRNSOperational Update
15th May 20267:00 amRNSNotice of AGM Logistics
30th Apr 20267:00 amRNSNotice of AGM
18th Feb 20267:00 amRNSPetro Matad Operational Update
13th Jan 20267:00 amRNSBoard Changes
12th Dec 20257:00 amRNSOperational Update
10th Dec 20257:00 amRNS-RInvestor Presentation
5th Nov 20257:00 amRNSOperational Update
9th Oct 20257:00 amRNSOperational Update
29th Sep 20257:05 amRNSInterim results for six months ended 30 June 2025
29th Sep 20257:00 amRNSH1 Production Operations and Well Testing Update
24th Sep 20257:00 amRNSOperational Update
26th Aug 20257:00 amRNSOperational Update
30th Jul 20257:00 amRNSOperational Update
23rd Jul 202512:00 pmRNS-RInvestor Presentation
16th Jul 20257:00 amRNSResult of Retail Offer
11th Jul 20257:05 amRNSRetail Offer
11th Jul 20257:00 amRNSResults of Placing and Subscription
10th Jul 20254:35 pmRNSProposed Capital Raising
26th Jun 20254:58 pmRNSFinal results year ended 31 Dec 2024 - Replacement
26th Jun 20257:00 amRNSFinal results for year ended 31 December 2024
18th Jun 20257:00 amRNSProduction Revenue Received
30th May 20257:00 amRNSOperational Update
28th Apr 20257:00 amRNSSignature of Oil Sales Agreement
13th Mar 202510:40 amRNSResult of AGM
13th Mar 20257:00 amRNSOperational Update
28th Feb 20257:00 amRNSNotice of AGM Logistics
14th Feb 20257:00 amRNSNotice of AGM
5th Feb 20257:00 amRNSCertification of Block XX Exploitation Area
16th Jan 20257:00 amRNSOperational Update
14th Nov 20247:00 amRNSOperational Update
25th Oct 20247:00 amRNSProduction startup at Heron-1
22nd Oct 20247:00 amRNSPlanned production startup at Heron-1
7th Oct 20247:00 amRNSOperational Update
1st Oct 20247:07 amRNSHeron-2 drilling results
23rd Sep 20247:00 amRNSSpud of Gobi Bear-1 exploration well
19th Sep 20247:02 amRNSInterim results for six months ended 30 June 2024
19th Sep 20247:00 amRNSHeron-1 operational update
9th Sep 20247:00 amRNSOperational Update – Spud of Heron-2
22nd Aug 20247:00 amRNSOperational Update
23rd Jul 20247:00 amRNSCommencement of Heron-1 Completion Operations
10th Jul 20247:00 amRNSInvestor Presentation & Forward Work Programme
1st Jul 20247:00 amRNSResult of Retail Offer
28th Jun 20247:00 amRNSIssue of equity
26th Jun 20247:00 amRNSRetail Offer
26th Jun 20247:00 amRNSResults of Capital Raise
25th Jun 20244:40 pmRNSProposed fundraise to raise up to USD$8.5 million
19th Jun 20247:00 amRNSFinal results for year ended 31 December 2023
29th May 202411:32 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.