Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Operational Update

2 Aug 2011 15:04

RNS Number : 5987L
Petro Matad Limited
02 August 2011
 



 

Petro Matad Limited

("Petro Matad" or the "Company")

 

Operational Update

 

Petro Matad announces that the Company's Davsan Tolgoi-8 well ("DT-8") has reached a total depth of 1,850m, in metamorphic rocks.

 

Beginning at 1,670m depth, the well penetrated a 127m gross thickness of the Uppermost Tsagaantsav Formation (the Uvgan Gol paleovalley). The well encountered elevated gas in the overlying Lower Zuunbayan seal that was maintained through the Uppermost Tsagaantsav interval. The highest sandstone zones of the Uppermost Tsagaantsav exhibited live oil shows from 1,714 to 1,720m depth that consisted of spotty fluorescence and fast bluish-white to yellow-gold cut indicating the presence of hydrocarbons. Initial petrophysical analysis has identified 8.5m of net pay averaging 18.5% porosity for the Uppermost Tsagaantsav interval.

 

The Lower Tsagaantsav was not an objective for DT-8, where the interval was absent due to erosion and faulting. The well drilled metamorphic basement rocks from 1,797m to the total depth.

 

DT-8 was designed to test a stratigraphic pinch-out of the Uvgan Gol paleovalley reservoir between thin hydrocarbon-saturated sandstones at the Company's DT-5 well and producing sandstones at Daqing's 19-62 well of the adjacent Block XIX. Identification of the stratigraphic trap followed revision to the Company's original interpretation of DT-5. It was previously announced on 8 June 2011 that the 3m of calculated net pay in DT-5 was within the top of the Lower Tsagaantsav Formation at 1,707m. Subsequent integration of the wireline velocity logs into the 3D seismic interpretation indicates that the entire pay interval lies within the basal part of the Uppermost Tsagaantsav paleovalley sequence.

 

Drilling, casing, and cementing operations have been completed at DT-8 and the rig is being moved to the new Davsan Tolgoi-9 ("DT-9") location.

 

DT-9 continues the Company's drilling program to evaluate its prospect inventory in the Davsan Tolgoi area of Block XX. The well targets the Lower Tsagaantsav reservoir at a location 2.5 km south of and 220m high to the Company's DT-4 well, which recovered oil-saturated core from the Lower Tsagaantsav. The DT-9 location is one of a series of Lower Tsagaantsav locations in the Shoroo, Tumur and Gal prospects that lie to the west of the Uvgan Gol paleovalley play. These Lower Tsagaantsav prospects have been recently reinterpreted with the benefit of enhanced processing of the Davsan Tolgoi 3D seismic survey.

 

The Company also announces that it has completed mobilisation of the workover rig and equipment to Davsan Tolgoi. Well testing operations commenced on 1 August at DT-1. The well-testing program at DT-1 is designed to sequentially test six separate zones of Uppermost Tsagaantsav reservoir over the coming weeks.

 

Following the DT-1 test the rig and equipment will move onto other wells. The Company's DT-2, DT-5, DT-7 and DT-8 wells have all been identified as production test candidates in the Uvgan Gol paleovalley reservoir. DT-3 and DT-4 are slated for production testing of the Lower Tsagaantsav reservoir. The Upper Zuunbayan reservoir will be tested in DT-3.

 

Commenting on the news, Petro Matad CEO Douglas McGay said "We are further encouraged by the results of DT-8 which has confirmed the presence of oil in the Uvgan Gol paleovalley. The ongoing exploration, combined with the commencement of our testing program is very positive for Petro Matad's ongoing assessment of Block XX."

 

Technical information in this news release has been reviewed by the Company's Exploration Manager, Dr James Coogan. Dr Coogan is a petroleum geologist with 30 years of experience in North American and international exploration and development. He is a member of the American Association of Petroleum Geologists and the Geological Society of America.

 

About Petro Matad Limited

 

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. The Group holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. The principal asset is the PSC for Block XX, a petroleum block of 10,340km² in the far eastern part of the country. The two other Blocks, IV and V are located in central Mongolia and jointly cover 71,040km².

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

Further information:

 

Petro Matad Limited

Douglas J. McGay - CEO

+976 11 331099

 

Westhouse Securities Limited

Richard Baty/Petre Norton

+44 (0)20 7601 6100

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSDFLEFFSESA
Date   Source Headline
29th Oct 20157:00 amRNSOperational Update
29th Sep 20157:00 amRNSInterim results for 6 months ended 30 June 2015
13th Aug 20158:22 amRNSContract award for 2D Seismic
7th Aug 20157:00 amRNSContract award
27th Jul 20157:00 amRNSDirectors Dealing & Issue of Equity
21st Jul 20157:00 amRNSDirectors' Dealing
17th Jul 20157:00 amRNSAppointment of Chairperson and CEO
29th Jun 20158:50 amRNSFinal Results - Replacement
29th Jun 20157:00 amRNSFinal results for year ended 31 December 2014
22nd Jun 20157:00 amRNSFarm-out and Operational Update
11th Jun 20157:00 amRNSCompany Update
17th Apr 20157:00 amRNSIssue of Equity and Directors' Dealing
13th Apr 20151:27 pmRNSDirector/PDMR Shareholding
7th Apr 201511:02 amRNSFarm-out agreement
16th Mar 201512:31 pmRNSStmnt re Share Price Movement
28th Nov 201412:56 pmRNSBoard Changes
24th Nov 20144:30 pmRNSDirectorate Change
21st Nov 201412:16 pmRNSResult of AGM
29th Oct 20147:00 amRNSNotice of AGM
3rd Oct 20147:00 amRNSIssue of Equity and Total Voting Rights
22nd Sep 20147:00 amRNSHalf Yearly Report
30th Jun 20147:00 amRNSFinal Results
7th May 20147:00 amRNSOperational Update
12th Mar 201410:38 amRNSPresentation at APPEX
5th Feb 20147:00 amRNSAttendance at NAPE and change to Adviser's role
9th Jan 20148:56 amRNSShare price movement
2nd Dec 20139:05 amRNSTotal Voting Rights
27th Nov 20137:00 amRNSIssue of Equity and Total Voting Rights
21st Nov 20137:00 amRNSOperational Update
6th Nov 20137:00 amRNSManagement Changes
6th Nov 20137:00 amRNSOperational Update
23rd Sep 20137:06 amRNSHalf Yearly Report
16th Sep 20137:00 amRNSAward of seismic contract
11th Sep 20132:35 pmRNSResult of AGM
19th Jul 201312:25 pmRNSHolding(s) in Company
28th Jun 20137:00 amRNSFinal Results
12th Jun 201311:15 amRNSFundraising
8th Feb 20137:00 amRNSDirector Declaration
7th Feb 20137:00 amRNSPresentation at Oil Barrel Conference
25th Jan 20139:43 amRNSIssue of Equity
20th Dec 20127:05 amRNSOperations Update
20th Dec 20127:00 amRNSBoard Changes
30th Nov 20127:00 amRNSBoard Change
21st Nov 20128:00 amRNSHolding(s) in Company
28th Sep 20127:00 amRNSHalf Yearly Report
14th Sep 201211:54 amRNSChair Change
12th Sep 201211:34 amRNSResult of AGM
30th Aug 20127:00 amRNSExtension of Exploration Period of Block XX
7th Aug 20127:00 amRNSAppointment of Exploration Manager
1st Aug 20127:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.