Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Drilling Report

6 Oct 2010 10:10

RNS Number : 9392T
Petro Matad Limited
06 October 2010
 



 

 

Petro Matad Limited ("Petro Matad" or the "Company")

 

Operational Update

 

Petro Matad (AIM: MATD) is pleased to provide an update on its drilling activities on the Davsan Tolgoi Prospect on Block XX in Eastern Mongolia.

 

Drilling operations on the DT-2 well were completed on 4 October 2010 at a depth of 1,336m below surface. The drill rig is now being moved to the next well, DT-3. Wireline logging has been completed, and the well cased and cemented in preparation for later testing.

 

Preliminary geological and petrophysical analyses indicated the presence of significant hydrocarbons in three stratigraphic intervals in the lower 275m of the well: the primary objective Tsagaantsav formation; the overlying Upper Zuunbayan formation; and the underlying Sharilyn formation.

 

Upper Zuunbayan sandstones exhibited mud gas shows, calculated gas saturation, and high porosity (15-20%) in a zone between 1,025m and 1,041m.

 

The Tsagaantsav primary objective showed sustained elevated mud gas beginning at the top of the Lower Zuunbayan seal at 1,056m depth, with fluorescence and streaming cut in samples from 1,087m to 1,123m in the Tsagaantsav Formation. Preliminary log analysis indicates that sandstone porosity exceeds 20% in the uppermost Tsagaantsav, with decreasing sandstone quality to 1,125m, and a shale-dominated section to the base of the formation at 1,231m. Log hydrocarbon saturations and elevated pentanes in mud gas persist to 1,177m depth which is the interpreted base of the hydrocarbon column.

 

A third hydrocarbon zone from 1,293m through 1,298m exhibited streaming cut and fluorescence in the volcaniclastic Sharilyn Formation near the bottom of the well.

 

The DT-1 and DT-2 wells lie on the crest and flank, respectively, of the same subsidiary closure along the crest of the Davsan Tolgoi anticline. The hydrocarbon distribution through both wells indicates that they share a common hydrocarbon column in the Tsagaantsav Formation with a base near 1,177m depth in DT-2, at an elevation that is 33m below the deepest Tsagaantsav section in DT-1. The Tsagaantsav reservoir is better developed in DT-1 than DT-2, and this reservoir variation is being integrated into the interpretation of the 3D seismic data.

 

Thermal alteration of organic material and Rock Eval analysis from DT-1 samples, along with the presence of hydrocarbons in three stratigraphic intervals, and the presence of gas in the Zuunbayan and upper Tsagaantsav formations, indicate that Davsan Tolgoi anticline possesses a robust migration history from the deepest oil and gas generating areas of the Tamsag Basin north of the Prospect.

 

The Company plans to site the third well of the 2010 programme (DT-3) on the apex of the Davsan Tolgoi anticline at a reservoir elevation that is 150m above the local DT-1 crest. Amongst other objectives, this will test the full height of the hydrocarbon column. The DT-3 site is 7.7km to the SSW of DT-2 and has a TD of 1,205m.

 

Commenting on the results of DT-2, CEO Douglas McGay said: "Despite some logistical and mechanical problems encountered before and during drilling, we are pleased to have finalised the drilling and wireline testing of DT-2.

 

"It is significant that DT-2 encountered hydrocarbons over the stated intervals, which provides further proof that the Davsan Tolgoi anticline has been charged with oil and gas which has migrated out of the deeper hydrocarbon-generating kitchens.

 

"While the interval of oil shows within the Tsagaantsav formation is not as appreciable as encountered in DT-1, the total hydrocarbon column and the extra zones outside of that formation are very encouraging and add to our understanding of the Prospect."

 

Competent person

Technical information in this news release has been reviewed by the Company's Exploration Manager, Dr James Coogan. Dr Coogan is a petroleum geologist with 29 years of experience in North American and international exploration and development.

 

He is a member of the American Association of Petroleum Geologists and the Geological Society of America.

 

Further information about the Company:

 

Petro Matad Limited

Douglas J. McGay- CEO

+976 11 331099

 

Westhouse Securities Limited

Richard Baty/Petre Norton

+44 (0)20 7601 6100

 

Note to Editors:

 

About Petro Matad Limited

 

Petro Matad is the parent company of a group focused on oil exploration, as well as future development and production in Mongolia. The group holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. The principal asset is the PSC for Block XX, a petroleum block of 14,250km² in the far eastern part of the country. The two other blocks, IV and V are located in central Mongolia and jointly cover 71,040km².

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMFBLTMBMMMLM
Date   Source Headline
29th Oct 20157:00 amRNSOperational Update
29th Sep 20157:00 amRNSInterim results for 6 months ended 30 June 2015
13th Aug 20158:22 amRNSContract award for 2D Seismic
7th Aug 20157:00 amRNSContract award
27th Jul 20157:00 amRNSDirectors Dealing & Issue of Equity
21st Jul 20157:00 amRNSDirectors' Dealing
17th Jul 20157:00 amRNSAppointment of Chairperson and CEO
29th Jun 20158:50 amRNSFinal Results - Replacement
29th Jun 20157:00 amRNSFinal results for year ended 31 December 2014
22nd Jun 20157:00 amRNSFarm-out and Operational Update
11th Jun 20157:00 amRNSCompany Update
17th Apr 20157:00 amRNSIssue of Equity and Directors' Dealing
13th Apr 20151:27 pmRNSDirector/PDMR Shareholding
7th Apr 201511:02 amRNSFarm-out agreement
16th Mar 201512:31 pmRNSStmnt re Share Price Movement
28th Nov 201412:56 pmRNSBoard Changes
24th Nov 20144:30 pmRNSDirectorate Change
21st Nov 201412:16 pmRNSResult of AGM
29th Oct 20147:00 amRNSNotice of AGM
3rd Oct 20147:00 amRNSIssue of Equity and Total Voting Rights
22nd Sep 20147:00 amRNSHalf Yearly Report
30th Jun 20147:00 amRNSFinal Results
7th May 20147:00 amRNSOperational Update
12th Mar 201410:38 amRNSPresentation at APPEX
5th Feb 20147:00 amRNSAttendance at NAPE and change to Adviser's role
9th Jan 20148:56 amRNSShare price movement
2nd Dec 20139:05 amRNSTotal Voting Rights
27th Nov 20137:00 amRNSIssue of Equity and Total Voting Rights
21st Nov 20137:00 amRNSOperational Update
6th Nov 20137:00 amRNSManagement Changes
6th Nov 20137:00 amRNSOperational Update
23rd Sep 20137:06 amRNSHalf Yearly Report
16th Sep 20137:00 amRNSAward of seismic contract
11th Sep 20132:35 pmRNSResult of AGM
19th Jul 201312:25 pmRNSHolding(s) in Company
28th Jun 20137:00 amRNSFinal Results
12th Jun 201311:15 amRNSFundraising
8th Feb 20137:00 amRNSDirector Declaration
7th Feb 20137:00 amRNSPresentation at Oil Barrel Conference
25th Jan 20139:43 amRNSIssue of Equity
20th Dec 20127:05 amRNSOperations Update
20th Dec 20127:00 amRNSBoard Changes
30th Nov 20127:00 amRNSBoard Change
21st Nov 20128:00 amRNSHolding(s) in Company
28th Sep 20127:00 amRNSHalf Yearly Report
14th Sep 201211:54 amRNSChair Change
12th Sep 201211:34 amRNSResult of AGM
30th Aug 20127:00 amRNSExtension of Exploration Period of Block XX
7th Aug 20127:00 amRNSAppointment of Exploration Manager
1st Aug 20127:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.