Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Progress Report

11 Jul 2007 07:00

Landore Resources Limited11 July 2007 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) 11 July 2007 PROGRESS REPORT JUNIOR LAKE-NICKEL PROJECT HIGHLIGHTS •Drilling on the VW Zone Nickel Project continues to intersect multiple zones of resource grade nickel mineralization, with assay results consistently returning grades in excess of 1% nickel. The zone remains open along strike in both directions and at depth. •Claim staking has significantly increased Landore's property holding at Junior Lake, extending the property almost 5 kilometres to the east and south-east covering the eastern strike extension of the structurally deformed geology hosting the VW zone. The Junior Lake area properties now extend over a strike length of 28 kilometres. Mineralized intersections not previously reported include: Drill-hole From Width Nickel No Metres Metres % 0407-108 55.0 2.4 1.01 61.0 5.0 0.89 includes 64.0 2.0 1.42 0407-110 173.0 1.0 1.41 184.0 17.0 0.43 includes 197.0 1.0 1.32 218.0 18.0 0.65 includes 220.0 1.0 1.30 includes 233.0 2.0 2.36 0407-112 77.0 7.0 0.48 includes 82.0 1.0 1.59 0407-113 243.0 38.0 0.32 296.0 7.0 0.74 includes 302.0 1.0 1.35 318.0 5.5 0.70 0407-117 282.0 11.6 0.73 includes 290.0 2.0 1.48 The Junior Lake properties are located in the province of Ontario, Canada,approximately 235 kilometres north-northeast of Thunder Bay and are situatedwithin the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. TheVW Zone Nickel Project is located at Ketchikan Lake toward the south eastern endof the Junior Lake property. Diamond drilling resumed on the VW Zone in mid-April with 2 drill rigs. Acampaign of 60 holes for approximately 15,000 metres is underway, with one rigdedicated to extending the existing inferred resource along strike in bothdirections and down dip, with the second rig carrying out infill drilling toadvance the resource to 'Indicated' status, a requirement for pre-feasibilitystudies. To date, 35 holes (0407-99 to 0407-134), for 9,876 metres, have been completed.Results are pending for 18 of those holes. At completion of the current campaign, (approximately mid September) thedrilling results will be collated and forwarded to Independent Engineers for aNational Instrument 43-101 Resource upgrade. All drill core was photographed prior to being cut for assaying. Samples wereanalyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder Bay, Ontario, bygeochemical analysis with atomic absorption finish (Ni). All samples reportingresults of 1% nickel or higher were re-analysed by the assay method with atomicabsorption finish. Check assays, standards and laboratory duplicates wereperformed on a systematic basis at Accurassay Laboratories. ALS ChemexLaboratory in Vancouver, BC also completed systematic checks. Core is stored atsite and in Landore's facilities in Thunder Bay, Ontario. Rejects are stored atAccurassay Laboratories and in Landore's facilities in Thunder Bay. Further releases will be made during the summer period as drilling continues. Junior Lake Claim Staking During June and July Landore staked and recorded 17 new claims to the east andsouth-east of the Junior Lake property. The new claims were staked as a direct result of the positive advancement of theVW zone nickel deposit and the good potential for the discovery of additionalbase and precious metal mineralization along strike within this geologicalsetting in the East-Central Caribou Lake greenstone belt. In addition, Landore has staked and recorded 5 new claims to the north and southof the VW Zone for inclusion within the proposed area being advanced to Leasestatus, required for possible mining. The Junior Lake claim area is summarized as follows: Junior Lake Claims Area Landore Unpatented Leased Hectares New claims for proposed Lease 5 528 100%New claims to east 9 1,920 100%New claims to south 8 1,984 100%Claims prior to new staking 36 2 5,413 100% Total 58 2 9,845 100% The new claims extend the Junior Lake property almost 5 kilometres to the eastand south covering eastern strike extension of the structurally deformed geologyhosting the VW zone. The Junior Lake area properties now extend over a strikelength of 28 kilometres. A variety of mineralized showings hosting nickel, gold, molybdenum,copper-zinc-lead, and asbestos, as reported in the assessment files, are coveredby the new claims. Nickel mineralization hosted by peridotite (ultramaficrock) in the Toronto Lake area is reported grading up to 0.96% Ni over 0.3 meterby Pye, 1968. Other occurrences of nickel-copper mineralization associatedwith a gabbro-anorthosite sill (Grassy Pond Sill) on a peninsula on the eastside of Toronto Lake and copper-zinc and lead sulphides intersected by drillholes in felsic metavolcanics near the west shore under Toronto Lake arereported by Berger, 1992, from information in the Assessment Files ResearchOffice (AFRO), Toronto. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. - ENDS - For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.