Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Progress Report

30 Sep 2008 07:00

RNS Number : 6039E
Landore Resources Limited
30 September 2008
 



LANDORE RESOURCES LIMITED

JUNIOR LAKE-NICKEL PROJECT

PROGRESS REPORT

HIGHLIGHTS

Drilling on the VW Zone Nickel Project returns the highest intersection recorded to date with drill-hole 0408-185 returning 11 metres at 1.53% nickel including 2 metres at 3.19% nickel. The zone remains open along strike in both directions and at depth.

Drilling on the Carrot Top Zone, located 11 kilometres to the west and along strike from the VW Zone, confirms the presence of highly anomalous nickel, copper and Platinum Group metals including an intersection of 0.39 metres at 1.44% nickel, 0.56% copper, 1.68 grams/tonne palladium and 0.14% cobalt.

Landore has increased its interest to 80% in the Lamaune Lake property, located to the west and adjacent to the Junior Lake property.

Junior Lake:

The Junior Lake property is located in the province of OntarioCanada, approximately 235 kilometres north-northeast of Thunder Bay and is situated within the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. The VW Nickel Deposit is located at Ketchikan Lake toward the south eastern end of the Junior Lake property.

VW Nickel Deposit. Drilling resumed on the VW Zone in mid July. A campaign of 20 holes for approximately 5,200 metres is in progress with the aim of extending the existing indicated resource along strike to the east and down plunge in the west.

To date, 18 drill-holes, Diamond NQ core, (0408-179A to 0408-195A and extensions to 0407-114 and 0407-136), for 4,960 metres, have been completed. Results are pending for 12 of those holes.

Mineralized intersections include:

Drill-hole

From

Width

Nickel

Copper

Cobalt

No

Metres

Metres

%

%

%

0408-180

299.00

1.00

1.01

0.03

0.04

and

313.26

2.74

2.19

0.40

0.08

including

315.00

1.00

3.04

0.09

0.09

0408-185

216.00

11.00

1.53

0.07

0.04

including

224.00

2.00

3.19

0.08

0.07

and

239.00

1.50

0.88

0.03

0.03

and

243.61

1.39

1.39

0.13

0.04

Both of the above intersections are at the western end of the VW Nickel Deposit and show the down plunge of the mineralization to be improving with depth, further enhancing the underground mining potential.

At completion of the current campaign, the drilling results will be collated and forwarded to Independent Engineers for a National Instrument 43-101 Resource upgrade to be used for the proposed Scoping Study.

Exploration Drilling: A 10 drill-hole program totalling 1,500 metre  is scheduled to commence in early October 2008 on the 3 kilometre area between the VW Nickel Deposit and the B4-7 Nickel-Copper-PGE's Deposit.

Lamaune Lake:

The Lamaune Lake property, consisting of 8 claims for a total area of 1,616 hectares, is located at the western end of and is contiguous to the Junior lake property and contains the highly prospective Carrot Top Zone, The Grassy Pond Zone and several other areas of interest.

In 2003, Landore Resources entered into an Option Agreement with the Stares Contracting Corporation and James Dawson, to acquire up to an 80% interest in the Lamaune Lake property by incurring exploration expenditures of C$1,000,000 within a 6 year period together with 4 annual payments totaling C$80,000. Those commitments have recently been achieved as a result of which Landore's now has an 80% interest in the above property.

Carrot Top Zone: Landore has completed two drilling campaigns on the Carrot Top Zone and adjacent Zap Zone, in 2003 and 2005, successfully intersecting highly anomalous nickel, copper and platinum group elements (PGE's) in several holes.

Commencing in May 2008, an exploration drilling campaign, consisting of 12 drill-holes, Diamond NQ core, for a total of 2,028 metres was completed on the Carrot Top and Zap Zones designed to further investigate the previous drilling.

Mineralized intersections include:

Drill-hole

From

Width

Nickel

Copper

Platinum

Palladium

Cobalt

No

Metres

Metres

%

%

g/t

g/t

%

1108-21

77.30

6.70

0.29

0.26

0.076

0.352

0.03

1108-24

185.20

18.30

0.34

0.32

0.038

0.206

0.03

1108-25

81.00

5.48

0.33

0.15

0.078

0.278

0.02

Including

84.60

0.32

1.29

0.16

0.133

1.064

0.12

1108-26

126.89

0.39

1.44

0.56

0.010

1.678

0.14

The results from the 3 drilling campaigns completed to date show the Carrot Top Zone to have the potential to develop into a resource. Accordingly a substantial drilling campaign will be programmed for the Carrot top Zone commencing in the spring of 2009.

Grassy Pond Zone: Aexploration drilling campaign, consisting of 8 drill-holes, Diamond NQ core, for a total of 1,034 metres, has been completed on the Grassy Pond Zone located approximately 3 kilometres to the north east of the B4-7 Nickel Copper PGE's deposit.

Highly anomalous results, including 0.7 metres at 0.39% nickel, 0.43% copper and 0.77grams/tonne gold in drill-hole 1108-30, are sufficiently encouraging to warrant follow up drilling.

James Garber, (BSc. Hons. Geology, member of APGO) a Director of Landore Resources Ltd and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement, which is stated in accordance with the Canadian Institute of Mining Metallurgy and Petroleum.

- ENDS -

For more information please contact:

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: +44(0)7734 681262 

Tel: +44(0)7775 651421 

www.landore.com

Simon Raggett

Strand Partners Limited

Tel: +44 (0)20 7409 3494

David Bick

Tel: +44 (0)7831 381201

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEKLFLVKBXBBV
Date   Source Headline
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.