Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.70
High: 2.70
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Deposit-Resource Statement

14 May 2008 07:00

RNS Number : 3397U
Landore Resources Limited
14 May 2008
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

JUNIOR LAKE-NICKEL PROJECT

B4-7 DEPOSIT-RESOURCE STATEMENT

B4-7 Deposit Inferred Resource:

Snowden Mining Industry Consultants (Snowden), Perth, Australia, was retained by Landore Resources Canada Inc. (Landore) to independently prepare an Australasian Joint Ore Reserves Committee (JORC) Code compliant (2004) Mineral Resource estimate for the B4-7 Nickel Copper Cobalt PGE Deposit located at Landore's Junior Lake project.

Extract from the report produced by Snowden.

The B4-7 resource estimate, at various nickel equivalent cut-off grades, is detailed below in Table 1.

Table 1 - Landore B4-7 Inferred Resource reported above various nickel equivalent (NiEQ) cut-off grades

Cut-off (NiEQ%)

Tonnes (kt)

Ni%

Cu%

Co%

Pt ppm

Pd ppm

Au ppm

NiEQ%

0.2

5,870

0.32

0.2

0.03

0.08

0.31

0.02

0.49

0.3

4,650

0.37

0.3

0.03

0.09

0.32

0.02

0.55

0.4

3,490

0.41

0.3

0.04

0.09

0.35

0.03

0.62

0.6

1,680

0.51

0.3

0.05

0.10

0.43

0.03

0.76

0.8

530

0.62

0.4

0.06

0.10

0.51

0.04

0.92

NiEQ = Ni% + (0.26 × Cu%) + (2.38 × Co%) + (0.19 × Pt ppm) + (0.06 × Pd ppm) + (0.12 × Au ppm)

Tonnes and grades have been rounded and this may have resulted in minor discrepancies.

The most likely cut-off grade for this deposit has not been determined at this time and must be confirmed by the appropriate economic and mining studies. Notwithstanding this Snowden believes the ore detailed above has reasonable prospects of eventual economic extraction using assumptions which were valid at the time of reporting.

Extract ends.

B4-7 Mineral Resource-contained metal above 0.2%nickel equivalent (NiEQ.) cut-off.

Ni Tonnes

Cu Tonnes

Co Tonnes

Pt Ounces

Pd Ounces

Au Ounces

NiEq Tonnes

Total contained metal

19,000

11,700

1,800

15,700

59,200

4,000

28,900

Commenting on the report, Chairman of Landore Resources, Bill Humphries, said:

The addition of the B4-7 Deposit to our compliant resource base significantly enhances Landore's prospects of becoming a nickel producer in the medium term and continues to support our faith in the huge potential of the Junior Lake property.

Junior Lake:

The Junior Lake property is located in the province of OntarioCanada, approximately 235 kilometres north-northeast of Thunder Bay and is situated within the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. The B4-7 Deposit is located toward the south eastern end of the Junior Lake property and sits approximately 3 kilometres to the north-west of the VW Deposit.

B4-7 Nickel-Copper-Cobalt-PGE Deposit:

During the second half of 2007 an infill drill program, consisting of 16 NQ size holes for a total of 3,575 metres, was completed on the historic B4-7 nickel-copper-cobalt-platinum group elements (Ni-Cu-Co-PGE) deposit.

The program successfully filled the remaining gaps in the deposit and confirmed the continuity of the mineralization. The deposit remains open down plunge to the west.

Extract from the report produced by Snowden.

B4-7 deposit Mineral Resource estimate

Snowden has carried out a Mineral Resource estimate which has been classified according to JORC guidelines for the B4-7 deposit at Junior Lake, OntarioCanada. This estimate was based upon data supplied by Landore Resources Limited ('Landore'). Landore provided Snowden with a full database along with some quality control data.

Snowden has classified the B4-7 resource as Inferred using guidelines in the JORC Code (2004). This classification reflects the uncertainties in the quality of the assay data and the outlines of the 'massive sulphide' domain. Metallurgical testing of the B4-7 massive sulphide has indicated nickel recoveries between 25% and 35%. However, notwithstanding this Landore has identified a potential profitable treatment route for this material. Landore's officers also believe that the disseminated material at B4-7, which has a much higher nickel to sulphur ratio than the 'massive sulphide' material, may return higher nickel metallurgical recoveries commensurate with those determined for Landore's VW deposit in the same belt; however, this has yet to be verified by testwork on B4-7 samples.

Extract ends.

Ongoing works. Snowden is currently preparing a technical report on the resource estimate for the B4-7 deposit.

Following receipt of the technical report, drilling will re-commence on the B4-7 deposit, with 5,000 metres being programmed for further extension and infill drilling.

In addition, extensive metallurgical testing will be carried out on the disseminated material of the B4-7 deposit.

James Garber, (BSc. Hons. Geology, member of APGO) a Director of Landore Resources Ltd and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement, which is stated in accordance with the Canadian Institute of Mining Metallurgy and Petroleum.

Ian Glacken FAusIMM(CP), CEng., Group General Manager Resources, Snowden, prepared the resource estimate for Landore Resources Canada Inc. and is qualified to act as a Competent Person with respect to the JORC Code (2004).

- ENDS -

For more information please contact:

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: +44(0)7734 681262 

Tel: +44(0)7775 651421 

www.landore.com

Simon Raggett

Strand Partners Limited

Tel: +44 (0)20 7409 3494

David Bick

Tel: +44 (0)7831 381201

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBSGDUGBBGGIX
Date   Source Headline
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update
22nd Jul 20147:00 amRNSGrant of Options
17th Jul 201412:00 pmRNSHolding(s) in Company
7th Jul 20147:00 amRNSOversubscribed Placing and Subscription
2nd Jul 20143:33 pmRNSResult of AGM
28th May 20143:53 pmRNSChange of Broker
20th May 201412:18 pmRNSPosting of Annual Report
15th May 20147:00 amRNSFinal Results
15th May 20147:00 amRNSAmendment to Loan Agreement with Lamaune Iron Inc.
23rd Apr 20147:00 amRNSJunior Lake Nickel-Copper Project Update
24th Mar 20147:00 amRNSProgress Update
18th Feb 20147:00 amRNS3D Geophysics Survey Complete
4th Feb 20147:00 amRNSCommencement of 3D Survey
13th Jan 20147:00 amRNSJunior Lake Geophysics Survey
25th Nov 20134:30 pmRNSGrant of Options
25th Oct 201311:19 amRNSHolding(s) in Company
15th Oct 20137:00 amRNSSubscription
30th Sep 20137:00 amRNSUpdate - Junior Lake Nickel-Copper Property
19th Sep 20137:00 amRNSHalf Yearly Report
1st Jul 201311:22 amRNSGrant of Options
20th Jun 201311:30 amRNSResult of AGM
14th May 20137:00 amRNSFinal Results
8th May 20137:00 amRNSChange of Adviser
8th Apr 20137:00 amRNSDrilling Update - Junior Lake Nickel Project
11th Mar 20137:00 amRNSSubscription
17th Jan 20137:00 amRNSResource Update - Junior Lake
12th Dec 20127:00 amRNSDrilling and Geophysical Survey Update
16th Oct 20127:00 amRNSDrilling, Geophysics Survey - Junior Lake
26th Sep 20122:45 pmRNSGrant of Options
20th Sep 201211:04 amRNSTotal Voting Rights
19th Sep 201210:14 amRNSAppointment of Broker
12th Sep 20127:00 amRNSSubscription
3rd Sep 20127:00 amRNSDrilling Update - Junior Lake Project
21st Aug 20127:00 amRNSHalf Yearly Report
25th Jul 20127:00 amRNSDrilling Report
12th Jul 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
20th Jun 20123:11 pmRNSResult of AGM
20th Jun 20127:00 amRNSHolding(s) in Company
29th May 201211:26 amRNSFinal Results
22nd May 20127:00 amRNSDrilling Report
18th Apr 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
21st Mar 20124:37 pmRNSGrant of options
13th Mar 201211:15 amRNSHolding(s) in Company
28th Feb 20127:00 amRNSAdditional Listing
21st Feb 201210:42 amRNSSubscription
23rd Jan 20127:01 amRNSDrilling Update - Junior Lake
3rd Nov 201111:36 amRNSDirector Declaration
2nd Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.