Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLeed Resources Regulatory News (LDP)

  • There is currently no data for LDP

Operations update

16 Sep 2009 08:41

RNS Number : 1393Z
Leed Petroleum PLC
16 September 2009
 



For immediate release

16 September 2009

Leed Petroleum plc

("Leed" or the "Company")

Operations update

Leed reports successful flow test at Sorrento Salt Dome, onshore Louisiana

Leed Petroleum plc (AIM:LDP), the oil and gas exploration and production company focused on the Gulf of Mexico, today announces the successful flow testing of the onshore Louisiana Sorrento Dome United Lands "14-1" Well, which the Company plans to return to production.

The Sorrento Dome field is located in Ascension Parish, Louisiana, approximately 50 miles northwest of New Orleans. The field was discovered by Gulf Refining Company in 1929 and was primarily developed by Texaco during the 1950s. To date, the field has produced 750 BCF and 5,000 MBO. Leed acquired a 100 per cent. operated working interest in a portion of the Sorrento Dome field in April 2007 including the shut-in United Lands 13-1 and 14-1 wells and associated facilities .

The 14-1 well (Leed: net working interest 100%), was shut-in during 2006 following various attempts to isolate water production.  Leed's previous plans involved drilling a sidetrack of the well, however, a water saturation log was run in the well during July 2009, which showed significantly higher hydrocarbon saturation in the vicinity of the perforations than previous logs run during 2004 and 2006. A flow test was subsequently conducted through the existing facility over four days and stable but restricted flow rate of 1.3 mmcfd (217 boepd)1785 bwpd644 ftp on a 30/64th  to 32/64th choke was established for an extended 3 day period.  Bottom hole pressure gauges confirmed stable flowing bottom hole pressures during the flow period.

Leed plans to convert the existing temporarily abandoned United Lands 11-1 well to a salt water disposal well and install a new gas sales meter on location prior to restoring production from the United Lands 14-1 well.

The work is planned over the coming months with production scheduled to commence early Q1 2010.

Howard Wilson, President and Chief Executive of Leed, commented:

"The successful flow test of the 14-1 well at the Sorrento Dome Field is the first step after the Eugene Island drilling program towards an increased and diversified production base. 

The project will require minimal capital outlay and low operating expenses will be incurred once production is established. We expect to commence gas sales in time to take advantage of the historically higher winter natural gas prices. We are very pleased to be able to restore production from the 14-1 wellwhich has enabled the Company to accelerate production whilst removing capital costs from the project."

For further information please contact:

Leed Petroleum PLC

 

Howard Wilson, President and Chief Executive

+1 337 314 0700

James Slatten, Chief Operating Officer

+1 337 314 0700

 

 

Matrix Corporate Capital LLP

 

Alastair Stratton

+44 20 3206 7204 

Tim Graham

+44 20 3206 7206 

 

 

Buchanan Communications Ltd 

 

Ben Willey

+44 20 7466 5118

Bobby Morse

+44 20 7466 5151

Chris McMahon

+44 20 7466 5156

NOTES TO EDITORS

Review by a qualified person

The information contained in this announcement has been reviewed and approved by Chris Thompson, Manager of Business Development at the Company, BSC GradDip, who is a reservoir engineer (SPE) with over 17 years experience within the sector.

Operations

Leed Petroleum PLC is an AIM quoted independent oil and gas exploration and production company. The Company's operations are concentrated in the Gulf of Mexico region where Leed has established a significant portfolio of producing and development assets. The Company has interests in 18 offshore fields and one onshore field in the region.

Leed's strategy is to grow the Company's portfolio through organic development of its existing assets and to utilise its regional expertise to identify and purchase value adding assets.

Glossary

boepd - barrels of oil equivalent produced per day

mmcfd - million cubic feet of gas produced per day

bwpd - barrels of water per day

ftp - flowing tubing pressure

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDQLBFKKBXBBK
Date   Source Headline
1st Jul 200812:51 pmRNSBusiness Update
1st Jul 20087:00 amRNSAward of Lease
27th Jun 20087:00 amRNSChange in Accounting Referenc
20th Jun 20087:00 amRNSDrilling Update
19th Jun 20089:11 amRNSNotification of Interests
17th Jun 20083:42 pmRNSAward of Lease
5th Jun 20087:00 amRNSDrilling Update
23rd May 20087:00 amRNSDrilling Update
18th Apr 20084:57 pmRNSMajor Interests in Shares
18th Apr 20087:00 amRNSOperational Update
10th Apr 20089:49 amRNSSuccessful Well Completion
20th Mar 20087:01 amRNSMMS Lease Sale
17th Mar 20087:03 amRNSDrilling Update and Schedule
17th Mar 20087:02 amRNSReserve Update
13th Mar 20087:01 amRNSCompletion of Acquisition
10th Mar 20083:30 pmRNSDrilling Update
28th Feb 20087:01 amRNSDrilling Update
8th Feb 20087:00 amRNSAward of Lease
7th Feb 20082:28 pmRNSDrilling Update
30th Jan 20083:40 pmRNSSale & Purchase Agreement
28th Jan 20087:01 amRNSAward of Lease
8th Jan 20087:00 amRNSDrilling Update
31st Dec 20077:00 amRNSTotal Voting Rights
10th Dec 20073:26 pmRNSPosting of Interim Results
4th Dec 20073:27 pmRNSResult of AGM
4th Dec 20072:00 pmRNSInterim Results
8th Nov 20077:03 amRNSTotal Voting Rights
8th Nov 20077:02 amRNSNotice of AGM
5th Oct 20077:00 amRNSSuccessful MMS lease sale
17th Sep 20077:00 amRNSOperational Update
4th Sep 20075:32 pmRNSNotification of Interests
28th Aug 20077:02 amRNSRig Contract
22nd Aug 20077:01 amRNSHolding(s) in Company
21st Aug 20077:01 amRNSHolding(s) in Company
17th Aug 20074:40 pmRNSHolding(s) in Company
17th Aug 20074:20 pmRNSAIM Rule 26
17th Aug 20079:27 amRNSHolding(s) in Company
15th Aug 20077:01 amRNSFirst Day of Dealings on AIM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.