Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLeed Resources Regulatory News (LDP)

  • There is currently no data for LDP

Operations update

16 Sep 2009 08:41

RNS Number : 1393Z
Leed Petroleum PLC
16 September 2009
 



For immediate release

16 September 2009

Leed Petroleum plc

("Leed" or the "Company")

Operations update

Leed reports successful flow test at Sorrento Salt Dome, onshore Louisiana

Leed Petroleum plc (AIM:LDP), the oil and gas exploration and production company focused on the Gulf of Mexico, today announces the successful flow testing of the onshore Louisiana Sorrento Dome United Lands "14-1" Well, which the Company plans to return to production.

The Sorrento Dome field is located in Ascension Parish, Louisiana, approximately 50 miles northwest of New Orleans. The field was discovered by Gulf Refining Company in 1929 and was primarily developed by Texaco during the 1950s. To date, the field has produced 750 BCF and 5,000 MBO. Leed acquired a 100 per cent. operated working interest in a portion of the Sorrento Dome field in April 2007 including the shut-in United Lands 13-1 and 14-1 wells and associated facilities .

The 14-1 well (Leed: net working interest 100%), was shut-in during 2006 following various attempts to isolate water production.  Leed's previous plans involved drilling a sidetrack of the well, however, a water saturation log was run in the well during July 2009, which showed significantly higher hydrocarbon saturation in the vicinity of the perforations than previous logs run during 2004 and 2006. A flow test was subsequently conducted through the existing facility over four days and stable but restricted flow rate of 1.3 mmcfd (217 boepd)1785 bwpd644 ftp on a 30/64th  to 32/64th choke was established for an extended 3 day period.  Bottom hole pressure gauges confirmed stable flowing bottom hole pressures during the flow period.

Leed plans to convert the existing temporarily abandoned United Lands 11-1 well to a salt water disposal well and install a new gas sales meter on location prior to restoring production from the United Lands 14-1 well.

The work is planned over the coming months with production scheduled to commence early Q1 2010.

Howard Wilson, President and Chief Executive of Leed, commented:

"The successful flow test of the 14-1 well at the Sorrento Dome Field is the first step after the Eugene Island drilling program towards an increased and diversified production base. 

The project will require minimal capital outlay and low operating expenses will be incurred once production is established. We expect to commence gas sales in time to take advantage of the historically higher winter natural gas prices. We are very pleased to be able to restore production from the 14-1 wellwhich has enabled the Company to accelerate production whilst removing capital costs from the project."

For further information please contact:

Leed Petroleum PLC

 

Howard Wilson, President and Chief Executive

+1 337 314 0700

James Slatten, Chief Operating Officer

+1 337 314 0700

 

 

Matrix Corporate Capital LLP

 

Alastair Stratton

+44 20 3206 7204 

Tim Graham

+44 20 3206 7206 

 

 

Buchanan Communications Ltd 

 

Ben Willey

+44 20 7466 5118

Bobby Morse

+44 20 7466 5151

Chris McMahon

+44 20 7466 5156

NOTES TO EDITORS

Review by a qualified person

The information contained in this announcement has been reviewed and approved by Chris Thompson, Manager of Business Development at the Company, BSC GradDip, who is a reservoir engineer (SPE) with over 17 years experience within the sector.

Operations

Leed Petroleum PLC is an AIM quoted independent oil and gas exploration and production company. The Company's operations are concentrated in the Gulf of Mexico region where Leed has established a significant portfolio of producing and development assets. The Company has interests in 18 offshore fields and one onshore field in the region.

Leed's strategy is to grow the Company's portfolio through organic development of its existing assets and to utilise its regional expertise to identify and purchase value adding assets.

Glossary

boepd - barrels of oil equivalent produced per day

mmcfd - million cubic feet of gas produced per day

bwpd - barrels of water per day

ftp - flowing tubing pressure

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDQLBFKKBXBBK
Date   Source Headline
31st Mar 20097:00 amRNSPosting Of Interim Report
23rd Mar 20094:40 pmRNSSecond Price Monitoring Extn
23rd Mar 20094:35 pmRNSPrice Monitoring Extension
23rd Mar 20098:44 amRNSNOTIFICATION OF MAJOR INTERESTS IN SHARES
19th Mar 20099:25 amRNSMMS Lease Sale 208
16th Mar 20097:00 amRNSInterim Results
25th Feb 20097:00 amRNSEugene Island A-6 Well Recompletion
9th Feb 20094:40 pmRNSSecond Price Monitoring Extn
9th Feb 20094:35 pmRNSPrice Monitoring Extension
6th Feb 20094:40 pmRNSSecond Price Monitoring Extn
6th Feb 20094:36 pmRNSPrice Monitoring Extension
5th Feb 20094:40 pmRNSSecond Price Monitoring Extn
5th Feb 20094:35 pmRNSPrice Monitoring Extension
4th Feb 20094:40 pmRNSSecond Price Monitoring Extn
4th Feb 20094:35 pmRNSPrice Monitoring Extension
28th Jan 20094:40 pmRNSSecond Price Monitoring Extn
28th Jan 20094:35 pmRNSPrice Monitoring Extension
22nd Jan 20097:00 amRNSDirector/PDMR Shareholding
19th Jan 20094:15 pmRNSHolding(s) in Company
16th Jan 20094:40 pmRNSSecond Price Monitoring Extn
16th Jan 20094:36 pmRNSPrice Monitoring Extension
15th Jan 20097:00 amRNSMajor Interest in Shares
13th Jan 20094:40 pmRNSSecond Price Monitoring Extn
13th Jan 20094:35 pmRNSPrice Monitoring Extension
12th Jan 20097:00 amRNSReserve and Production Update
6th Jan 20097:00 amRNSDrilling Update
5th Jan 20094:40 pmRNSSecond Price Monitoring Extn
5th Jan 20094:35 pmRNSPrice Monitoring Extension
19th Dec 20084:42 pmRNSPrice Monitoring Extension
19th Dec 20084:35 pmRNSPrice Monitoring Extension
1st Dec 20087:00 amRNSDrilling Update
16th Oct 20084:46 pmRNSSecond Price Monitoring Extn
16th Oct 20084:39 pmRNSPrice Monitoring Extension
9th Oct 20087:00 amRNSOperations Update
8th Oct 20088:49 amRNSDirector's Dealing
8th Oct 20087:04 amRNSNotification of Interest
6th Oct 20087:00 amRNSEugene Island Update
30th Sep 20087:03 amRNSNotice of AGM
30th Sep 20087:00 amRNSFinancial Results
26th Aug 20087:00 amRNSEugene Island Update
15th Aug 20089:37 amRNSNotification of Interests
7th Aug 20084:15 pmRNSNotification of Interests
7th Aug 20084:08 pmRNSNotification of Interests
5th Aug 20087:00 amRNSNotification of Interests
5th Aug 20087:00 amRNSNotification of Interests
1st Aug 20087:00 amRNSTotal Voting Rights
29th Jul 20087:00 amRNSPlacing and Subscription
21st Jul 20087:00 amRNSEugene Island Assets Update
3rd Jul 20089:52 amRNSUpdate on Investment
3rd Jul 20087:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.