Positive Scoping Study Update, Malelane Iron Ore

7 Jan 2013 07:00

RNS Number : 9093U
Ferrex PLC
07 January 2013
 



Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining

7 January 2013

Ferrex plc ('Ferrex' or 'the Company')

Scoping Study Update Substantially Improves Economics at Malelane Iron Ore Project

 

Ferrex plc, the AIM quoted iron ore and manganese development company focused in Africa, is pleased to provide a positive Scoping Study update from its 74% owned 4,192 Ha Malelane Iron Ore Project ('Malelane' or 'the Project') located in the prospective Mpumalanga Province of South Africa with direct access to the port of Maputo in Mozambique. The enhanced economics are primarily a result of improved fines recovery that the Company has been investigating for the last six months.

 

Overview

·; NPV increased by 65% to USD523m (pre-tax, 10% discount rate)
·; IRR increased by 44% to 72% (pre-tax)
·; Capital Intensity reduced to USD72/t*
·; Operating Costs reduced commencing at USD44/t Freight on Board ('FOB')
·; Production increased to 1.8mtpa at 57% iron ('Fe') (62% CaFe)

*capital intensity is the capital cost of the project divided by the tonnage of product produced per annum

 

Ferrex Managing Director Dave Reeves said, "These updated Scoping Study numbers have substantially enhanced the already excellent economics of Malelane and with the Capital Intensity continuing to fall, the Project is well within the first quartile of iron ore projects world-wide. As a result of metallurgical testwork conducted over the past six months, an increase in mass recovery of the fines from 20% to 37% has been achieved by using an alternative density separation method. This, combined with a reduction in quoted rail costs to the port of Maputo, has delivered the significant improvements in operating costs, product produced and accordingly, the Project's IRR and NPV.

 

"Importantly, the iron ore price is continuing to strengthen and is now at a higher level than it was before the price dip which occurred in September 2012. The current project economics are based on pricing levels of USD134 per tonne versus current prices of USD144 per tonne (62% Fe Benchmark Price CIF China). Notably, the reduction in operating costs reported today means that the project would still be cash positive at the recent price lows thus highlighting Malelane's economic robustness.

 

"We have a strong portfolio of African iron ore and manganese deposits which have defined development plans for 2013. At Malelane, our focus is now on completing the pre-feasibility study, incorporating the latest metallurgical process, in tandem with submitting a Mining Permit application in the coming year, while at our Nayega Manganese Deposit in Togo, our Definitive Feasibility Study remains on track for completion in H1 2013."

 

Detailed Information

 

Metallurgical Testwork

 

The fines metallurgical testwork was conducted under the guidance of DRA, Nagrom and Vulcan Technologies, which are all experienced iron ore processing consultants. The testwork was undertaken in Australia by Ludowici which are suppliers of the reflux classifiers that the testwork is based upon. The classifiers are a fluidised bed separator that operate on a density principle. They will replace the spirals that were previously costed. These classifiers are in use in the iron ore, chrome and coal industries worldwide and are rapidly replacing spirals as the preferred device for separation of fines material using density.

 

Results show that an iron yield of 58% and a mass yield of 43% is achievable for the Project through the treatment of the minus 1mm material through the reflux classifiers.

 

Cost Estimates

 

After further discussions with truck, port and rail operators, the Company has used a price of USD0.05/tkm for rail haulage costs compared to the previous USD0.10/tkm.

 

This, combined with the improved yield, has reduced initial FOB at Maputo costs to USD44/t and average FOB costs to USD53.50/t.

 

Capital costs have remained at USD139m as the new processing equipment will replace the previously costed fines recovery circuit at no extra cost. As a result, capital intensity has dropped to $72/t due to the increase in production caused by the higher fines yield.

 

Key Outputs

 

The key outputs are summarised below:

 

Year

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Concentrate (Mt)

1.9

1.8

1.8

1.8

1.8

1.8

1.9

1.9

1.7

1.7

1.7

1.8

1.9

1.7

1.8

Op Cost FOB USD/t

44

45

46

47

50

50

49

49

51

51

51

57

63

67

66

 

Operating costs rise toward the end of mine life due to increased strip ratios. Fluctuation in concentrate produced is due to varying feed grades.

 

Malelane - Further Information

 

Malelane is located over part of the Archaean Barberton Greenstone Belt, close to infrastructure and just 6km from an electrified railway line which services the deep water port of Maputo in Mozambique 170km away.

 

Three distinct banded iron formation horizons have been identified on the property with a combined strike length of 14km and mapped horizontal widths of up to 300m. A maiden JORC Code compliant Inferred Resource of 139Mt @ 37% Fe has been calculated over 1.1km of the 14km strike length. Mining consultants Coffey Mining calculated a total exploration target at Malelane of between 775 and 930Mt at 34-36% Fe.

 

Competent Person Statement

 

Information in this release that relates to exploration results is based on information compiled by Ferrex Exploration Manager Mr Mark Styles. Mr Styles is a qualified geologist, a member of the Australian Institute of Geoscientists and is a Competent Person as defined in the Australasian Code for Reporting of Exploration Results. Mr Styles consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.

 

Caution Regarding Forward Looking Statements: Information included in this release constitutes forward-looking statements. There can be no assurance that ongoing exploration will identify mineralisation that will prove to be economic, that anticipated metallurgical recoveries will be achieved, that future evaluation work will confirm the viability of deposits that may be identified or that required regulatory approvals will be obtained.

 

**ENDS**

 

For further information and the full Admission document visit www.ferrexplc.com or contact the following:

 

Dave Reeves

Ferrex plc

+ 61 (0) 420 372 740

finnCap

+44 (0)20 7220 0500

Elizabeth Johnson / Joanna Weaving

Broking

Matthew Robinson / Henrik Persson

Corporate Finance

Felicity Edwards/ Elisabeth Cowell

St Brides Media and Finance Ltd

+44 (0) 20 7236 1177

 

 

Notes

 

Ferrex plc is an AIM quoted exploration and development company focused on advancing low capex iron ore and manganese projects in Africa through the development cycle and into production. Our current property portfolio comprises the Nayega manganese project in Togo where the company is steadily progressing with development plans, iron ore at Malelane in South Africa and manganese at Leinster in South Africa.

 

The Company's growth strategy is centred on advancing its current assets, utilising its Board and management team's considerable experience in developing resource projects across Africa and expanding its portfolio through acquisitions to build Ferrex into a mid-tier, low-cost producer of iron ore and manganese.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUQAGUPWGPA
Date   Source Headline
12th Mar 20187:00 amRNSDirectorate Change
8th Mar 20188:23 amRNSCalidus announces significant regional potential
1st Mar 20187:00 amRNSFinal Results
20th Feb 20187:00 amRNSCalidus appoints Mark Connelly as Chairman
31st Jan 20187:00 amRNSCalidus announces high grade intercepts
15th Jan 201810:15 amRNSDirector Share Purchase
18th Dec 20177:00 amRNSCalidus Announces 74% Increase in Resource
30th Nov 20177:00 amRNSCalidus announces high grade intercepts
23rd Nov 20173:55 pmRNSNew Company Presentation
23rd Nov 20177:00 amRNSCalidus announces multiple new gold targets
16th Nov 20179:47 amRNSPilbara Gold Presentation-London 23 November 2017
14th Nov 20177:00 amRNSCalidus - Driling results at Satellite Deposits
6th Nov 20177:00 amRNSCalidus commences Novo JV and exercise of Option
24th Oct 201710:42 amRNSTotal Voting Rights
19th Oct 201711:40 amRNSDirector Share Purchases
18th Oct 20173:51 pmRNSPlacing to raise £250,000
17th Oct 20177:00 amRNSCalidus reports Klondyke Drill Programme Extended
29th Sep 20177:00 amRNSResignation of Director
27th Sep 20177:00 amRNSCalidus completes A$10m placement
20th Sep 20177:00 amRNSCalidus enters Joint Venture with Novo Resources
6th Sep 20177:00 amRNSCalidus reports 2.6km of continuous mineralisation
29th Aug 20177:45 amRNSCommencement of Diamond Drill Programme at Calidus
16th Aug 20177:00 amRNSCalidus Reports High-Grade Intercepts
1st Aug 20177:00 amRNSBrandon Hill Research
31st Jul 20177:00 amRNSFurther Consolidation of Warrawoona Gold Project
25th Jul 20177:00 amRNSHigh Grade Gold Drill Results from Warrawoona
12th Jul 20177:00 amRNSCalidus Maiden Drill Results, Warrawoona Project
22nd Jun 20177:00 amRNSCalidus Resources Commences Trading
20th Jun 20178:00 amRNSCalidus Resources to Commence Trading
15th Jun 20177:00 amRNSCalidus Resources Commences Drilling at Warrawoona
13th Jun 20177:00 amRNSAllotment of Shares in Calidus Resources
5th Jun 20177:00 amRNSASX Capital Raising Complete
1st Jun 20172:00 pmRNSConditional Approval for Calidus Resources Listing
30th May 201712:40 pmRNSApproval for Pharmanet Group to acquire Keras Gold
26th May 20173:00 pmRNSConversion of Additional Debt
24th May 201711:26 amRNSResult of General Meeting
22nd May 20177:00 amRNSInterim Results
15th May 20177:00 amRNSCobalt and Nickel Licences Awarded
8th May 20177:00 amRNSLodged Prospectus for ASX Listing
28th Apr 20174:45 pmRNSNotice of General Meeting & Corporate Update
28th Apr 20177:00 amRNSExpansion of Prospective Australian Gold Footprint
24th Apr 20173:15 pmRNS£530,000 Placing & appointment of Joint Brokers
18th Apr 20177:00 amRNSOversubscribed Placing to Support ASX Listing
30th Mar 20177:00 amRNSApplications for Cobalt and Nickel Licences
22nd Mar 201712:47 pmRNSNotice of Event Attendance and Call Recording
21st Mar 201712:30 pmRNSShareholder and Analyst Conference Call
21st Mar 20177:00 amRNSListing of Australian Gold Assets on the ASX
21st Feb 20178:15 amRNSIssue of Equity and Total Voting Rights
14th Feb 20177:00 amRNSInitial High Grade Resource at Copenhagen Deposit
10th Feb 20172:18 pmRNSNew Corporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.