Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.60
Bid: 0.59
Ask: 0.61
Change: -0.002 (-0.33%)
Spread: 0.02 (3.39%)
Open: 0.615
High: 0.605
Low: 0.59
Prev. Close: 0.602
KOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grimeli Project Update

13 Oct 2014 08:38

RNS Number : 0976U
Kodal Minerals PLC
13 October 2014
 



 

Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Grimeli Project Update

Sampling and Geophysics Results

 

Kodal Minerals, the mineral development and exploration company owning extraction and exploration licences for phosphate, iron and copper projects in Norway, is pleased to announce the results of preliminary underground sampling and surface geophysics completed at the Grimeli Project. The Grimeli Project is a copper ("Cu") project located in western Norway approximately 150km north of Bergen.

 

Highlights

 

· Two underground channel samples taken from the lower mine returned grades of 4.93% Cu over 0.96m and 4.7% Cu over 0.86m

· Surface magnetic survey work has returned multiple magnetic responses over the historic Grimeli mine area

· The total strike of the geophysical responses over the Grimeli Project is now 3,200m

· The most consistent geophysical response is a 1.1km long anomaly to the east of the previously mined area

· The Company is planning a drill program to test these geophysical targets as well as depth extensions of the previously mined area.

 

Luke Bryan, CEO of Kodal Minerals, commented: "The channel sample grades, while limited in number due to the challenging sampling conditions, do show the grade potential of this project. The previously mined areas adjacent to the sampled pillars were typically two metres wide. Having 3,200 metres of magnetic anomaly around a mine which produced close to five per cent. copper is a very positive start to our exploration program at the Grimeli Project. "

 

Contact details:

 

Kodal Minerals plc

Luke Bryan, Chief Executive Officer

 

 

Tel: 020 3463 2260

Allenby Capital Limited, Nominated Adviser

Jeremy Porter/Nick Harriss

Tel: 020 3328 5656

SP Angel Corporate Finance LLP, Financial Adviser & Broker John Mackay/Laura Harrison

 

Tel: 020 3463 2260

Yellow Jersey PR Ltd, Financial PR

 

Dominic Barretto/Kelsey Traynor

Tel: 07768 537 739

 

Further information

 

Size and Location

 

Over recent months the Company has completed three phases of work at Grimeli. The first was project logistics and establishment, the second was accessing and sampling the old workings in the lower mine and the third was accessing and sampling the old workings in the upper mine and completing the first phase of ground magnetics.

 

The exploration and sampling of the lower mine proved to be challenging and only two channel samples could be obtained from previously worked areas due to the lack of remaining accessible pillars. The lower areas of the mine are flooded as they approach sea level and the bottom two levels as depicted on historic plans are inaccessible.

 

Multi element acid digest assays were completed by SGS Mineral Services on the two channel samples and returned 4.93% Cu over 0.96m and 4.7% Cu over 0.86m. The minerals present in the channel samples are mainly chalcopyrite with some bornite and relatively low arsenic of 3 - 7ppm. These samples were taken from pillars in the old workings and appear to represent narrow areas of the workings. Immediately surrounding the sample areas the stoped width exceeds two metres. Using historic records the vertical extent of that region of the mine appears to be 135 metres including the flooded area. The lateral extent is approximately 85 metres.

 

A total of 18.6 line kilometres of ground magnetics have been completed. The survey focussed on the Grimeli mine and the area to the west and east of the old workings. A typical line length was 500 metres, initially with 200 metre line spacing and some infill at 50 metres.

 

The latest survey results appear to correlate closely with the geophysics completed by the Norwegian Geological Survey (NGU) in 1978 and 1981 when they conducted ground based electromagnetic (EM) and charged polarity (CP) surveys. The latest survey was completed to test the applicability of magnetic measurements to the Grimeli mineralisation, it also extended the survey area by 450 metres to the west and 1,200 metres to the east. The full strike length of the area which displays a magnetic response is now approximately 3,200 metres which represents a 1,100 metre extension to the results reported previously.

 

Exploration Plan

 

The Company is waiting for assays of samples taken in the Grimeli upper mine and for further processing of the geophysical data however the channel samples and observational data tend to support the view that the historic workings were targeting high grade copper mineralisation.

Given the apparent grade and the strike extent of the geophysical response the Company intends to drill test both the area below the old mine and selected geophysical targets to both the east and west of the previously mined area.

The next steps are to plan the drill program while starting the process of gaining vehicle access to the drill positions. The old mine road is partially intact and it is planned to reinstate this approach once permission is received.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMJBRTMBJBMFI
Date   Source Headline
8th May 20177:00 amRNSCompletion of Equity Subscription Agreement
3rd May 20177:00 amRNSFurther High-Grade Lithium Mineralisation,Bougouni
28th Apr 20171:57 pmRNSUpdate re proposed placing and off-take agreement
26th Apr 20177:00 amRNSHigh-Grade Lithium Mineralisation at Bougouni
11th Apr 20177:00 amRNSUpdate on Bougouni Lithium Project & Due Diligence
31st Mar 20175:00 pmRNSTotal Voting Rights
31st Mar 20177:00 amRNSHolding(s) in Company
15th Mar 20179:55 amRNSHolding(s) in Company
14th Mar 20177:00 amRNSTrenching Results,Bougouni Lithium Project, Mali
10th Mar 20174:40 pmRNSSecond Price Monitoring Extn
10th Mar 20174:35 pmRNSPrice Monitoring Extension
10th Mar 20179:00 amRNSPrice Monitoring Extension
10th Mar 20177:00 amRNSPlacement and Off-Take Agreement
3rd Mar 20177:00 amRNSLithium Project Update and Drilling to Commence
23rd Feb 20171:47 pmRNSHolding(s) in Company
21st Feb 20172:16 pmRNSHoldings in Company
9th Feb 20172:05 pmRNSSecond Price Monitoring Extn
9th Feb 20172:00 pmRNSPrice Monitoring Extension
8th Feb 20177:00 amRNSFinal Drilling Assays at Bougouni Lithium Project
3rd Feb 201712:49 pmRNSHolding in Company
2nd Feb 20177:00 amRNSFirst Drilling Assays at Bougouni Lithium Project
31st Jan 20177:00 amRNSUpdate on Bougouni Lithium Project
31st Jan 20177:00 amRNSTotal Voting Rights and Holding in Company
25th Jan 20174:40 pmRNSSecond Price Monitoring Extn
25th Jan 20174:35 pmRNSPrice Monitoring Extension
25th Jan 20172:05 pmRNSSecond Price Monitoring Extn
25th Jan 20172:00 pmRNSPrice Monitoring Extension
18th Jan 20174:40 pmRNSSecond Price Monitoring Extn
18th Jan 20174:35 pmRNSPrice Monitoring Extension
13th Jan 20174:25 pmRNSStatement re share price movement
9th Jan 20177:00 amRNSPlacing to Advance Bougouni Lithium Project
30th Dec 20167:00 amRNSDrilling update at Bougouni Lithium Project
7th Dec 20167:00 amRNSHigh-Grade Rock Chip Samples Returned, Mali
30th Nov 20167:00 amRNSDrilling commences at Bougouni Lithium Project
28th Nov 20167:00 amRNSAcquisition of Lithium Concessions, Southern Mali
8th Nov 20164:16 pmRNSHolding(s) in Company
7th Nov 20167:00 amRNSGold Project JV Exploration Update, Cote d'Ivoire
3rd Nov 20164:35 pmRNSPrice Monitoring Extension
3rd Nov 20162:06 pmRNSSecond Price Monitoring Extn
3rd Nov 20162:00 pmRNSPrice Monitoring Extension
3rd Nov 201611:05 amRNSSecond Price Monitoring Extn
3rd Nov 201611:00 amRNSPrice Monitoring Extension
3rd Nov 20167:00 amRNSInterim Results
31st Oct 20165:00 pmRNSTotal Voting Rights
19th Oct 20167:00 amRNSUpdate on Kodal Project
5th Oct 20167:00 amRNSDefines Four New Gold Anomalous Zones at Korhogo
3rd Oct 20167:00 amRNSPlacing to Advance High-Grade Lithium Project
26th Sep 20167:00 amRNSField Reconnaissance of Bougouni Lithium Project
16th Sep 20167:00 amRNSGold Anomalous Zones in Nangalasso Trench Samples
6th Sep 20167:00 amRNSHigh Grade Lithium Project Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.