We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.45
Bid: 0.44
Ask: 0.46
Change: -0.015 (-3.23%)
Spread: 0.02 (4.545%)
Open: 0.465
High: 0.465
Low: 0.45
Prev. Close: 0.465
KOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bougouni Lithium Project Mineral Resource Update

14 Nov 2023 07:09

RNS Number : 3714T
Kodal Minerals PLC
14 November 2023
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the UK Market Abuse Regulation

 

Kodal Minerals Plc / Index: AIM / Epic: KOD / Sector: Mining

14 November 2023

Kodal Minerals plc

("Kodal Minerals", "Kodal" or the "Company")

 

Bougouni Lithium Project Mineral Resource Update:

Total Resource increased to 31.9 Mt at 1.06% Li2O

 

Kodal Minerals, the mineral exploration and development company focused on lithium and gold assets in West Africa, announces a new JORC Mineral Resource estimate (MRE) for the Bougouni Lithium Project located in southern Mali ("Bougouni") of 31.9 million tonnes (Mt) at 1.06% Lithium Oxide (Li2O), an increase of over 40% from the previous Mineral Resource completed in 2019. The significant increase is specific to the Ngoualana and Boumou deposits following the drilling programmes completed in early 2023.

 

The updated Mineral Resource estimate has been prepared as part of the development plans for Bougouni. As previously announced, the Company plans for a two stage development strategy: Stage 1 through processing ore from the Ngoualana deposit through a dense media separation ("DMS") process plant; and Stage 2 through processing ore from the Boumou and Sogola-Baoulé deposits through a flotation plant.

 

Highlights

· The 40% increase in Bougouni's spodumene resource adds 10.6Mt to bring the overall MRE to 31.9Mt at 1.06% Li2O following 3,230 metres of RC/diamond drilling during 2023.

· New JORC Mineral Resource estimates have been prepared for the Boumou and Ngoualana prospects:

Boumou: 13.1Mt at 1.04% Li2O, an increase of 236% from the 2019 estimate

(Boumou Resource reported using a 0.75% Li2O lower cut-off, no top cut-off)

Ngoualana: 6.7Mt at 1.00% Li2O, an increase of 9% from the 2019 estimate

(Ngoualana MRE reported using 0.5% Li2O lower cut-off, no top cut applied)

The MRE update also improves Kodal management's confidence in the previously defined resource at the Ngoualana prospect ahead of the proposed DMS mining development.

· Sogola-Baoulé prospect has a resource of 12.2Mt at 1.1% Li2O, which is unchanged from the 2019 resource estimate, and the next phase of drilling will include additional metres with potential to expand Sogola-Baoulé.

· Boumou prospect remains open along strike and drilling is planned to commence in late November 2023 to target an additional 750m strike length.

· Ngoualana resource is undergoing open pit optimisation and the mine design is being updated to capture the increased resources, and to support the final planning of the Ngoualana prospect's DMS development.

· The next drilling campaign will commence imminently, focussing on further resource definition, infill and exploration drilling at Boumou and Sogola-Baoule prospects, as well as those not included in the MRE to date including Kola and Bougouni South, all within the current Bougouni mining licence.

 

Commenting on the 40% increase in Bougouni's MRE, Bernard Aylward, CEO of Kodal Minerals, stated: "The significant increase in Bougouni's lithium endowment is a further step towards becoming a West African spodumene producer of substance and scale. With the results from the latest drilling campaign delivering over 10Mt of resource, we are looking forward to bringing Bougouni into production at the end of 2024, as well as ramping up the drilling programme to include infill and extension definition drilling, and uncovering additional discoveries within our extensive mining licence.

 

"The drilling campaign completed by Kodal between January and May this year was the first programme conducted at the Bougouni Lithium Project since 2019. The results of the drilling programme confirm our positive view of the prospectivity within our project area, while the updated MRE highlights the potential for further resource growth at the project through continued drilling of our priority targets. The Boumou prospect has been significantly expanded by this recent drilling programme, and we will be returning in November 2023 to seek to extend the resource area further as well as undertaking infill and definition drilling to support future mine planning.

 

"The Ngoualana prospect resource has confirmed and expanded the 2019 resource estimate, and the new model has been prepared with a focus on the bulk commodity mining opportunity. This new model seeks to maximise the recovery of the pegmatite mineralisation during the mining process rather than attempting to selectively mine higher grade ore that may result in leaving mineralisation behind.

 

"We are currently planning the next phases of extension and definition drilling at the Bougouni Lithium Project with the Boumou prospect being a clear priority. However, the Sogola-Baoulé prospect is also a key expansion target as we look to build a major resource base to support the development of the phase 2 flotation plant. The aim of the programme is to demonstrate the potential to bring forward the development of the flotation plant as soon as possible after the DMS plant has been fully commissioned and maximise the opportunity we have at the Bougouni Lithium project."

 

Further Information

 

Mineral Resource Estimate

This updated MRE has been completed by independent consultants ERM (formerly CSA Global). Kodal supplied a geological database and verified the geological interpretation that was used to define the lithium mineralised pegmatite bodies.

 

Resource updates were completed for the Ngoualana and Boumou prospects following additional reverse circulation ("RC") and diamond drilling. The updated JORC compliant Mineral Resource estimate for the Bougouni Lithium project, including the Sogola-Baoulé, Ngoualana and Boumou prospects is tabulated below:

 

Prospect

Indicated

Inferred

Total

Tonnes

(Mt)

Li2O%

Grade

Contained Li2O

 (kt)

Tonnes

(Mt)

Li2O%

Grade

Contained Li2O

 (kt)

Tonnes

(Mt)

Li2O%

Grade

Contained Li2O

 (kt)

Sogola-Baoulé

8.4

1.09

91.9

3.8

1.13

42.8

12.2

1.10

134.8

Ngoualana

3.2

1.19

38.0

3.5

0.82

28.5

6.7

1.00

66.7

Boumou

13.1

1.04

135.8

13.1

1.04

135.8

TOTAL

11.6

1.12

129.9

20.3

1.02

207.1

31.9

1.06

337.2

Notes: Sogola-Baoulé resource estimate unchanged from 2019. A 0.5% Li2O lower cut-off applied, and resource wireframe defined by a 0.3% Li2O selected boundary. Estimate completed utilising Surpac software.

Ngoualana resource estimate reported utilising a 0.5% Li2O lower cut-off. All pegmatite mineralisation modelled including zones of internal waste material for a fully diluted model. The geological model of the mineralisation is completed using Leapfrog modelling software. The Mineral Resource estimation is completed using Surpac software with grades estimated by Ordinary Kriging.

Boumou resource reported using a 0.75% Li2O lower cut-off. All pegmatite mineralisation modelled including zones of internal waste material for a fully diluted model. The geological model of the mineralisation is completed using Leapfrog modelling software. The Mineral Resource estimation is completed using Surpac software with grades estimated by Ordinary Kriging.

Figures in table may not sum due to rounding. The contained metal is determined by the estimate tonnage and grade.

 

 

The JORC code Table 1 with details of the resource estimate parameters is available to view on the Company's website at www.kodalminerals.com

 

 

Exploration and Development Programme

At the Ngoualana prospect, the Company is continuing with the rapid development of the Bougouni Lithium Project with a focus on the development of the proposed DMS plant to process the coarse grained mineralisation identified within this prospect. The updated mineral resource estimate for the Ngoualana prospect is currently undergoing an update to the open pit optimisation to finalise the open pit design and results are expected later this year.

 

Kodal is currently finalising an extension and definition drilling programme for the Boumou prospect where this new resource has highlighted a major increase in the previous estimate and in particular has confirmed the potential for further significant additional mineralisation along strike and at depth. The drilling programme will consist of:

RC drilling to continue to target strike extensions over an additional 750m to the west, as well as new targets identified to the east of the prospect

Diamond drilling to provide geological and structural control features of the pegmatite veins which in turn will enhance success of ongoing targeting

Diamond drilling to provide metallurgical samples for testing to confirm the recoveries and possible material to supplement the proposed DMS plant and/or future flotation plant, which in both cases will support increased life of mine potential

Diamond drilling to provide geotechnical information for future open-pit mining.

 

The Company anticipates that the Boumou and Sogola-Baoulé region will continue to demonstrate the potential for the development of the proposed 2Mtpa flotation plant (Phase 2) outlined in the Company's Feasibility Study (refer to Kodal's announcement of 27 January 2020).

 

In addition to the detailed programme at the Boumou prospect, the Company intends to undertake further drilling at the Kola, Bougouni South and Sogola-Baoulé prospects. Both Kola and Bougouni South do not currently figure in the Mineral Resource estimate and provide further potential for resource increase.

 

 

Qualified Person's Statement

The Mineral Resource estimate for the Sogola-Baoulé prospect has been prepared by Dr Matthew Cobb who is a Member of the Australian Institute of Geoscientists. Dr Cobb completed the resource estimation in 2019 and the resource remains unchanged from that time. Dr Cobb has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Qualified Person as defined in the AIM Note for Mining and Oil & Gas Companies dated June 2009. Dr Cobb has consented to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

 

The information in this announcement that relates to the Mineral Resource estimates for Ngoualana and Boumou prospects is based on information compiled by Mr Phil Jankowski, who is a Fellow of the Australasian Institute of Mining and Metallurgy and a full-time employee of ERM (formerly CSA Global). Mr Jankowski has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Qualified Person as defined in the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Jankowski consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

 

The exploration results and activity reported in this announcement have been reviewed by Mr Bernard Aylward who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Aylward has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Qualified Person as defined in the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Aylward consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

 

**ENDS**

 

For further information, please visit www.kodalminerals.com or contact the following:

 

Kodal Minerals plc

Bernard Aylward, CEO

 

Tel: +61 418 943 345

 

Allenby Capital Limited, Nominated Adviser

Jeremy Porter/Vivek Bhardwaj/Nick Harriss

 

 

Tel: 020 3328 5656

SP Angel Corporate Finance LLP, Financial Adviser & Joint Broker

John Mackay/Adam Cowl

 

 

Tel: 020 3470 0470

Canaccord Genuity Limited, Joint Broker

James Asensio/Gordon Hamilton

 

 

Tel: 0207 523 4680

Buchanan, Financial PR

Bobby Morse/Oonagh Reidy

 

 

Tel: +44 (0)20 7466 5000

kodal@buchanancomms.co.uk

Glossary of Technical Terms

"cut off"

the lowest grade value that is included in a resource statement. It must comply with JORC requirement 19: "reasonable prospects for eventual economic extraction" the lowest grade, or quality, of mineralised material that qualifies as economically mineable and available in a given deposit. It may be defined on the basis of economic evaluation, or on physical or chemical attributes that define an acceptable product specification

"Inferred" or "Inferred Resource"

that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability

"Indicated" or "Indicated Resource"

that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed

"JORC"

The Australasian Joint Ore Reserves Committee Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 (the "JORC Code" or "the Code"). The Code sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves

"Measured Resource"

that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and grade continuity

"Mineral Resource"

a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories when reporting under JORC

"MRE"

"Mt"

Mineral Resource estimate

million tonnes

"Kt"

thousand tonnes

"Reserve"

the economically mineable part of a Measured and/or Indicated Mineral Resource

"t"

tonne (= 1 million grams)

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGZMMMNDMGFZG
Date   Source Headline
28th Mar 20249:20 amRNSBougouni Lithium Project
26th Mar 20247:00 amRNSBougouni Lithium Project Development Update
19th Mar 202410:25 amRNSAppointment of Non-Executive Director
22nd Dec 20237:00 amRNSKodal Minerals Interim Results to 30 Sept 2023
30th Nov 20235:00 pmRNSTotal Voting Rights
21st Nov 20235:53 pmRNSDirector dealings and shareholdings
16th Nov 20233:36 pmRNSExercise of Options, Warrants & Performance Rights
16th Nov 20237:00 amRNSNotification of Major Holdings
15th Nov 20238:00 amRNSKodal Minerals completion of Funding Transaction
14th Nov 20233:56 pmRNSIssue of Equity and Change to Total Voting Rights
14th Nov 20237:09 amRNSBougouni Lithium Project Mineral Resource Update
27th Oct 20239:57 amRNSKodal and Hainan Funding Package Completion
28th Sep 20234:00 pmRNSPost-AGM Webcast and Q&A Session
28th Sep 20232:48 pmRNSBougouni Funding Package: Long Stop Date Extension
22nd Sep 20237:00 amRNSUpdate on Project Development Preparations
18th Sep 20237:00 amRNSKodal Board Update
6th Sep 20237:00 amRNSFinal Results & Notice of AGM
31st Aug 20237:00 amRNSBougouni Funding – Extension of Long Stop Date
3rd Aug 20237:51 amRNSKodal receives Prepayment of US$3,500,000
30th Jun 20237:00 amRNSExtension of Long Stop Date for Bougouni Funding
31st May 20237:00 amRNSBougouni Assay Results & Funding Package Update
15th May 20235:31 pmRNSReplacement: Exercise of Options and TVR
12th May 20233:39 pmRNSExercise of Options and Total Voting Rights
2nd May 20235:04 pmRNSDirector/PDMR Shareholding
27th Apr 20238:02 amRNSExtension of Long Stop Date to 31 May 2023
19th Apr 20238:42 amRNSBougouni Drilling Results & Sale of Bougouni West
13th Apr 20238:00 amRNSBougouni Lithium Project Update on Funding Package
3rd Apr 20237:00 amRNSBougouni Lithium Project Update
3rd Apr 20237:00 amRNSReplacement: Total Voting Rights
31st Mar 20236:00 pmRNSTotal Voting Rights
23rd Mar 20237:00 amRNSDirector dealings and shareholdings
20th Mar 20237:00 amRNSExercise of options and change to TVR
1st Feb 202311:00 amRNSPrice Monitoring Extension
1st Feb 202310:45 amRNSFunding update – US$7million Deposit Received
19th Jan 20232:05 pmRNSSecond Price Monitoring Extn
19th Jan 20232:00 pmRNSPrice Monitoring Extension
19th Jan 20239:05 amRNSSecond Price Monitoring Extn
19th Jan 20239:00 amRNSPrice Monitoring Extension
19th Jan 20238:10 amRNSMajor Funding Package for Bougouni Lithium Project
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
3rd Jan 20232:00 pmRNSPrice Monitoring Extension
3rd Jan 202311:05 amRNSSecond Price Monitoring Extn
3rd Jan 202311:00 amRNSPrice Monitoring Extension
23rd Dec 20227:00 amRNSInterim Results
19th Dec 20222:34 pmEQSKodal Minerals 'not looking to raise funds'
16th Dec 20227:00 amRNSBougouni Project Update & Appointment of Broker
8th Dec 20222:01 pmEQSKodal Minerals will be 'moving full steam ahead' once funding secured
2nd Nov 20224:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.