Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKenmare Resources Regulatory News (KMR)

Share Price Information for Kenmare Resources (KMR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 326.00
Bid: 326.00
Ask: 328.00
Change: -1.50 (-0.46%)
Spread: 2.00 (0.613%)
Open: 332.00
High: 332.00
Low: 322.00
Prev. Close: 327.50
KMR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

WCP B Move Update: Plant Relocated Safely to Pilivili

28 Sep 2020 07:00

WCP B Move Update: Plant Relocated Safely to Pilivili

Kenmare Resources plc (“Kenmare” or “the Company”)

28 September 2020

WCP B Move Update: Plant Relocated Safely to Pilivili

Kenmare Resources plc (LSE:KMR, ISE:KMR), one of the leading global producers of titanium minerals and zircon, which operates the Moma Titanium Minerals Mine in northern Mozambique, is pleased to announce that Wet Concentrator Plant (“WCP”) B has been relocated safely to Pilivili.

Kenmare previously announced three development projects that together have the objective of increasing annual ilmenite production to 1.2 million tonnes (plus co-products) on a sustainable basis from 2021. The move of WCP B to the high grade Pilivili ore zone is the final of the three projects. This increased production is expected to significantly lower cash operating costs to between US$125 and US$135 per tonne (in 2020 real terms). Consequently, from 2021 the Group expects to be positioned in the first quartile of the industry revenue to cost (or margin) curve, supporting stronger free cash flow generation and providing for increased shareholder returns.

WCP B and its dredge were moved 23 kilometres from their previous mining area at Namalope to Pilivili. The move was undertaken in two stages, with the dredge moved first, followed by WCP B. They were transported along a 66 metre wide, purpose-built road using platform vehicles called self-propelled modular transporters (“SPMTs”) by specialist heavy lifting and transport contractor Mammoet. The other key contractors for the project include Hatch, Teichmann and Binvic. This is the only move of this type expected to be required during WCP B’s economic life.

Photographs of the move are available on Kenmare’s website and on the Company’s Facebook, LinkedIn or Twitter feeds, and this animation provides further information on how the move was undertaken.

WCP B and its dredge are now positioned safely on plinths in Pilivili and the next stage is to float them across the Mualadi river and into the starter pond. The establishment of associated infrastructure is continuing and heavy mineral concentrate production from WCP B is expected to begin in mid-Q4 2020. Kenmare will provide a further update on WCP B in its Q3 production update, which is anticipated to be announced in mid-October.

WCP B weighs approximately 7,100 tonnes, including ballast, and measuring 24 metres high, 80 metres long, and 60 metres wide. It is the heaviest piece of mining equipment to be moved in Africa to date. With 290 axles required to lift and transport WCP B, the move also represents the most SPMT axles used in Africa to date and one of the largest moves of a single piece of equipment in the world. The move was particularly unusual due to the combination of the weight of the load and the length of the distance travelled.

Statement from Michael Carvill, Managing Director:

“Moving the plant in one piece, an object weighing the equivalent of 550 double decker buses, taller than a seven-story building and wider than a football pitch, is a huge achievement for our company. This type of relocation is rare in the mining industry, but it was the correct choice for Kenmare given the economic benefits and lower risk profile it provided, compared to the alternatives we considered. I would like to extend my congratulations and thanks to the Kenmare team on site and our specialist contractors for completing this record-breaking task safely and overcoming many challenges as a result of COVID-19.

Following the successful relocation, mining is on track to commence at the high grade Pilivili ore zone in mid-Q4 and we have taken a critical step towards achieving a run-rate of 1.2 million tonnes per annum of ilmenite production. As a result of this expanded production, we expect to be positioned in the first quartile of the revenue to cost curve, supporting stronger free cash flow generation and increased shareholder returns.”

For further information, please contact: Kenmare Resources plcJeremy Dibb / Katharine SuttonInvestor RelationsTel: +353 1 671 0411Mob: + 353 87 943 0367 / + 353 87 663 0875

Murray (PR advisor)Joe Heron Tel: +353 1 498 0300Mob: +353 87 690 9735

About Kenmare Resources

Kenmare Resources plc is one of the world’s largest producers of mineral sands products. Listed on the London Stock Exchange and the Euronext Dublin, Kenmare operates the Moma Titanium Minerals Mine in Mozambique. Moma’s production accounts for approximately 7% of global titanium feedstocks and the Company supplies to customers operating in more than 15 countries. Kenmare produces raw materials that are ultimately consumed in everyday “quality-of life” items such as paints, plastics and ceramic tiles.

Date   Source Headline
9th Feb 20164:35 pmRNSPrice Monitoring Extension
3rd Feb 20164:35 pmRNSPrice Monitoring Extension
25th Jan 20164:40 pmRNSSecond Price Monitoring Extn
25th Jan 20164:35 pmRNSPrice Monitoring Extension
29th Dec 20154:40 pmRNSSecond Price Monitoring Extn
29th Dec 20154:35 pmRNSPrice Monitoring Extension
18th Dec 20154:40 pmRNSSecond Price Monitoring Extn
18th Dec 20154:35 pmRNSPrice Monitoring Extension
11th Dec 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
7th Dec 201511:29 amRNSKenmare Resources plc Form 38.5(a)
7th Dec 20159:59 amRNSForm 38.5(a) Kenmare Resources plc
7th Dec 20157:00 amRNSUpdate on Offer for Kenmare Resources
4th Dec 20153:09 pmRNSForm 8.3 - Kenmare Resources Plc
4th Dec 201510:22 amRNSForm 38.5a Kenmare Resources Plc
4th Dec 201510:05 amRNSKenmare Resources Plc Form 38.5a
4th Dec 20157:49 amRNS38.5 Disclosure
4th Dec 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
3rd Dec 201512:13 pmRNSForm 8.3 - Kenmare Resources plc
3rd Dec 201510:12 amRNSKenmare Resources plc Form 38.5(a)
3rd Dec 20159:56 amRNSForm 38.5a Kenmare Resources Plc
3rd Dec 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
2nd Dec 201511:04 amRNSForm 8.3 - Kenmare Resources plc
2nd Dec 20159:38 amRNSForm 38.5a Kenmare Resources Plc
2nd Dec 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
1st Dec 201510:03 amRNSForm 38.5a Kenmare Resources Plc
30th Nov 201510:02 amRNSForm 38.5a Kenmare Resources Plc
27th Nov 201510:23 amRNSForm 38.5a Kenmare Resources Plc
27th Nov 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
26th Nov 20154:40 pmRNSSecond Price Monitoring Extn
26th Nov 20154:35 pmRNSPrice Monitoring Extension
26th Nov 201510:29 amRNSForm 38.5a Kenmare Resources Plc
26th Nov 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
25th Nov 201510:04 amRNSForm 38.5a Kenmare Resources Plc
25th Nov 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
24th Nov 201510:53 amRNSForm 38.5a
24th Nov 201510:03 amRNSForm 38.5a Kenmare Resources Plc
24th Nov 20157:00 amRNSForm 8.3 - Iluka Resources Ltd.
23rd Nov 201510:12 amRNSForm 38.5a Kenmare Resources Plc
20th Nov 201510:09 amRNSForm 8.3 - Kenmare Resources plc
20th Nov 201510:06 amRNSForm 38.5a Kenmare Resources Plc
19th Nov 201512:46 pmRNSForm 38.5a
19th Nov 201511:43 amRNSKenmare Resources plc Form 38.5(a)
19th Nov 20159:53 amRNSForm 38.5a Kenmare Resources Plc
18th Nov 20154:35 pmRNSPrice Monitoring Extension
18th Nov 201510:11 amRNSForm 38.5a Kenmare Resources Plc
18th Nov 20159:58 amRNSForm 8.3 - Kenmare Resources plc
17th Nov 20152:59 pmRNSForm 8.3 - Kenmare Resources Plc
17th Nov 201510:48 amRNSForm 38.5a Kenmare Resources Plc
16th Nov 20154:35 pmRNSPrice Monitoring Extension
16th Nov 201510:20 amRNSKenmare Resources plc Form 38.5(a)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.