Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

MED Pyebridge Update

27 Feb 2023 09:20

RNS Number : 1302R
Kibo Energy PLC
27 February 2023
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

Dated: 27 February 2023

 

Kibo Energy PLC

('Kibo' or the 'Company')

 

MED's Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Kibo Energy PLC (AIM: KIBO; AltX: KBO), the renewable energy-focused development company, is pleased to note the positive announcement by its subsidiary, Mast Energy Developments ('MED'), with regards to its current flagship and producing asset, the 9 MW Pyebridge synchronous gas-powered flexible generation facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically. The full announcement can be viewed at https://polaris.brighterir.com/public/mast_energy_developments/news/rns/story/r77nkjr and as set out below.

 

Louis Coetzee, CEO of Kibo Energy said: "The Pyebridge site's performance during 2022 has exceeded our expectations, outperforming the average market price by 88% and highlighting MED's ability to provide significantly better returns compared to the market. Furthermore, MED is on track to bringing its next project, Bordesley, into production later this year along with advancing the development of the rest of the projects within its portfolio".

 

Full MED announcement:

 

Mast Energy Developments PLC

 

Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Mast Energy Developments PLC ('MED' or the 'Company'), the UK-based multi-asset owner and operator in the rapidly growing Flexible Energy market is pleased to announce an update with regards to its current flagship producing asset, the 9 MW Pyebridge Synchronous Gas-powered Flexible Generation Facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results, as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically.

 

Capacity Market

 

Upon acquisition of the Site by MED, it had a pre-existing T-4 CM contract at a tariff of £8/kW/pa with a contract value of c. £60k per annum. Due to the UK energy market having moved significantly since the Site previously obtained the aforementioned contract, MED took a strategic decision to forego the contract in favour of applying for new replacement CM contracts in the 2022/2023 CM bid window. Consequently, MED applied for and was successful in pre-qualification to bid for two new CM contracts, being a T-1 and a T-4 CM contract. Following the preparation of a robust CM Auction bid strategy, MED is pleased to announce that pursuant to the recent Capacity Market Auctions and subsequent results, its T-1 bid cleared at £60/kW/pa and, its T-4 bid cleared at an unprecedented historic record price of £63/kW/pa.

 

The Directors are pleased at the success of MED's strategy to replace the Site's previous low-value CM contract with new replacement contracts at significantly higher tariffs. The Site's new replacement T-4 contract at £63/kW/pa compared to its previous T-4 CM contract at £8/kW/pa results in a c. 7.5x (or 750%) uplift in income. The new additional T-1 CM contract, which the Site did not have before and is a new additional contract, will further enhance the Site's revenue significantly.

 

The Site's new T-1 CM contract has a revenue value of c. £308k per annum and its new T-4 CM contract has a revenue value of c. £324k per annum (the latter up from the previous T-4 contract's c. £60k per annum). Both contract values will increase the Site's revenue profile accordingly.

 

Pyebridge Trading Update

 

Following the period of the Site's post-acquisition optimisation (see RNS dated 5 July 2022), and since starting full-scale production during March 2022, the Site generated the following actual performance figures for the c. 10-month period March to December 2022 (the 'Period'):

 

* Electricity Generation Sales Revenue for the Period: c. £1.054m,

* Total Electricity Generation Output for the Period: c. 2,738 MWh, and

* Average Electricity Generation Sales Price achieved per MWh sold for the Period: c. £385.

 

Both the achieved generation production and sales price outperformed the market, with the market's average wholesale price in 2022 coming to only c. £204 per MWh, resulting in an 88% performance above the market and validating MED's strategy and ability to outperform the market. MED's success in this regard is mostly related to the astute utilisation of Artificial Intelligence ('AI') and Machine Learning ('ML') techniques related to its trading algorithm, in conjunction with its PPA Route-to-Market partner, Statkraft.

 

The Site's previous financial performance led the Company to increase its expectations of Pyebridge, which were set out in the Pyebridge Trading Update RNS announcement dated 19 October 2022. The Company confirms that due to unexpected variables during the period under review, including the generation of unprecedented record levels of electricity generation from renewables, most notably wind (which is a hedge to reserve power) from September to December 2022 in the UK, and which went beyond those considered possible by the Company when issuing its expectations, the previously stated expectations are no longer valid. This is a consequence of the increase in electricity generation from renewables reducing the reserve power required across the UK during this period and consequently impacting the electricity generation sales at Pyebridge.

 

Pyebridge Asset Value

 

Following the Pyebridge SPA deferred consideration settlement (see RNS dated 16 December 2022), the total effective acquisition purchase price for the Site was reduced to c. £2.1m.

 

During the Site's recent annual insurance cover policy review, the Site's asset value was independently confirmed at c. £6.3m (on a conservative replacement cost basis). The Site's fair asset value compared to its purchase price therefore highlights the significant upside that MED's investment in Pyebridge has established.

 

Pieter Krügel, MED CEO, commented: "We are pleased to report that Pyebridge obtained new Capacity Market contracts at considerably higher values, which will significantly enhance the Site's revenue profile and profitability. Moreover, we are pleased with the Site's actual performance during 2022, with specific reference to the 88% outperformance of the average market price, highlighting our ability to provide significantly better returns compared to the market. We are confident in our ability and strategy to keep delivering outperformance during 2023. Finally, the Site's fair asset value compared to its acquisition price furthermore highlights MED's ability to identify and acquire sites at an attractive discount in order to enhance value for its shareholders.

 

Further, we are advancing the development of the rest of our projects in the portfolio and looking forward to bringing our next project, Bordesley into production later this year.

 

"MED has a very exciting year ahead, being well established and positioned to fast-track production and growth. We look forward to updating investors with further key developments during the year ahead."

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

**ENDS**

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

James Biddle

Roland Cormish

+44 207 628 3396

Beaumont Cornish Limited

Nominated Adviser

Claire Noyce

+44 20 3764 2341

Hybridan LLP

Joint Broker

Damon Heath

+44 207 186 9952

Shard Capital Partners LLP

Joint Broker

Zainab Slemang van Rijmenant

zainab@lifacommunications.com

Lifa Communications

Investor and Media Relations Consultant

 

Johannesburg

27 February 2023

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKDLBLXLLFBBF
Date   Source Headline
12th Nov 20147:00 amRNSNotice of Presentation & Letter to Shareholders
10th Nov 20148:00 amRNSCommencement of Accelerated PFS for RCPP
28th Oct 20148:00 amRNSRukwa DMFS Project Update
14th Oct 20148:00 amRNSCommencement of DFS on Imweru
10th Oct 20148:11 amRNSClarification re CEO shareholding
9th Oct 20147:00 amRNSFirst Financial Indicators for RCPP
8th Oct 20149:15 amRNSKibo Mining raises £855,725 in Share Placing
29th Sep 20148:00 amRNSRCPP Update
25th Sep 20144:00 pmRNSInterim Results
18th Sep 20148:00 amRNSRCPP Update
9th Sep 20148:00 amRNSPreliminary Evaluation confirms Mining Viability
2nd Sep 20148:30 amRNSImweru Exploration Results
21st Aug 20148:31 amRNSProgress with DFS at RCPP
31st Jul 20148:00 amRNSResult of AGM & Completion of Placing
29th Jul 20148:00 amRNSRCPP to commence DMFS
15th Jul 20144:40 pmRNSSecond Price Monitoring Extn
15th Jul 20144:35 pmRNSPrice Monitoring Extension
14th Jul 20148:30 amRNSKibo Mining Plc Share Placing
7th Jul 20149:17 amRNSPosting of 2013 Annual Report
30th Jun 20143:56 pmRNSAnnual Financial Statements & Notice of AGM
27th Jun 201412:40 pmRNSFinal Results
27th May 20149:00 amRNS1st Quarter Results
2nd Apr 20141:00 pmRNSUK Investor Show & Registered Company Address
31st Mar 20149:00 amRNSKibo Mining raises £750,000 in Share Placing
17th Mar 20148:00 amRNSTechnical Report - Haneti
24th Feb 20148:00 amRNSTechnical Report Confirms Imweru Upside Potential
14th Feb 20149:30 amRNSAppointment of Director
23rd Jan 20149:00 amRNSShareholder Update: Financial Year 2013/14
14th Jan 20147:00 amRNSPositive Phase 1 Drilling Results From Imweru
20th Dec 20137:00 amRNSDistribution of Shareholding by Major Shareholder
19th Dec 20137:00 amRNSHaneti Nickel and Imweru Gold Projects Update
13th Dec 20137:30 amRNSHaneti Exploration Project Update
5th Dec 20133:48 pmRNSKibo Re-acquires 100% interest in Haneti
4th Dec 20137:30 amRNSIMWERU GOLD PROJECT COMPLETED AHEAD OF SCHEDULE
19th Nov 20137:30 amRNSUpdate on Exploration Activities
28th Oct 20137:30 amRNSKibo Commences 3,000 metre Drill Programme
8th Oct 20137:00 amRNSManagement Team and Financial Advisor Appointed
1st Oct 20137:00 amRNSKibo Issues of Shares for Cash
30th Sep 20139:45 amRNSHalf Year Results Announcement
16th Sep 20137:00 amRNSRecent Encouraging Stream Sampling Results
11th Sep 20137:00 amRNSRaises further £500,000 in Secondary Placement
9th Sep 20137:30 amRNSHaneti Joint Venture Project Update
30th Aug 201310:52 amRNSKibo raises £1,105,000 in Share Placing
13th Aug 20137:30 amRNSKibo Announces new Consolidated Lake Victoria Gold
1st Aug 20137:00 amRNSChange in UK Broking Arrangements
31st Jul 20134:45 pmRNSRESULTS OF THE ANNUAL GENERAL MEETING
31st Jul 20137:00 amRNSHaneti Project Interim Update
18th Jul 20137:00 amRNSMOU Signed with Korean East West Power
11th Jul 20137:00 amRNSHaneti Interim Project Update
8th Jul 201310:00 amRNSAnnual Report, AGM Date and Director Resignations

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.