If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

MED Pyebridge Update

27 Feb 2023 09:20

RNS Number : 1302R
Kibo Energy PLC
27 February 2023
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

Dated: 27 February 2023

 

Kibo Energy PLC

('Kibo' or the 'Company')

 

MED's Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Kibo Energy PLC (AIM: KIBO; AltX: KBO), the renewable energy-focused development company, is pleased to note the positive announcement by its subsidiary, Mast Energy Developments ('MED'), with regards to its current flagship and producing asset, the 9 MW Pyebridge synchronous gas-powered flexible generation facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically. The full announcement can be viewed at https://polaris.brighterir.com/public/mast_energy_developments/news/rns/story/r77nkjr and as set out below.

 

Louis Coetzee, CEO of Kibo Energy said: "The Pyebridge site's performance during 2022 has exceeded our expectations, outperforming the average market price by 88% and highlighting MED's ability to provide significantly better returns compared to the market. Furthermore, MED is on track to bringing its next project, Bordesley, into production later this year along with advancing the development of the rest of the projects within its portfolio".

 

Full MED announcement:

 

Mast Energy Developments PLC

 

Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Mast Energy Developments PLC ('MED' or the 'Company'), the UK-based multi-asset owner and operator in the rapidly growing Flexible Energy market is pleased to announce an update with regards to its current flagship producing asset, the 9 MW Pyebridge Synchronous Gas-powered Flexible Generation Facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results, as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically.

 

Capacity Market

 

Upon acquisition of the Site by MED, it had a pre-existing T-4 CM contract at a tariff of £8/kW/pa with a contract value of c. £60k per annum. Due to the UK energy market having moved significantly since the Site previously obtained the aforementioned contract, MED took a strategic decision to forego the contract in favour of applying for new replacement CM contracts in the 2022/2023 CM bid window. Consequently, MED applied for and was successful in pre-qualification to bid for two new CM contracts, being a T-1 and a T-4 CM contract. Following the preparation of a robust CM Auction bid strategy, MED is pleased to announce that pursuant to the recent Capacity Market Auctions and subsequent results, its T-1 bid cleared at £60/kW/pa and, its T-4 bid cleared at an unprecedented historic record price of £63/kW/pa.

 

The Directors are pleased at the success of MED's strategy to replace the Site's previous low-value CM contract with new replacement contracts at significantly higher tariffs. The Site's new replacement T-4 contract at £63/kW/pa compared to its previous T-4 CM contract at £8/kW/pa results in a c. 7.5x (or 750%) uplift in income. The new additional T-1 CM contract, which the Site did not have before and is a new additional contract, will further enhance the Site's revenue significantly.

 

The Site's new T-1 CM contract has a revenue value of c. £308k per annum and its new T-4 CM contract has a revenue value of c. £324k per annum (the latter up from the previous T-4 contract's c. £60k per annum). Both contract values will increase the Site's revenue profile accordingly.

 

Pyebridge Trading Update

 

Following the period of the Site's post-acquisition optimisation (see RNS dated 5 July 2022), and since starting full-scale production during March 2022, the Site generated the following actual performance figures for the c. 10-month period March to December 2022 (the 'Period'):

 

* Electricity Generation Sales Revenue for the Period: c. £1.054m,

* Total Electricity Generation Output for the Period: c. 2,738 MWh, and

* Average Electricity Generation Sales Price achieved per MWh sold for the Period: c. £385.

 

Both the achieved generation production and sales price outperformed the market, with the market's average wholesale price in 2022 coming to only c. £204 per MWh, resulting in an 88% performance above the market and validating MED's strategy and ability to outperform the market. MED's success in this regard is mostly related to the astute utilisation of Artificial Intelligence ('AI') and Machine Learning ('ML') techniques related to its trading algorithm, in conjunction with its PPA Route-to-Market partner, Statkraft.

 

The Site's previous financial performance led the Company to increase its expectations of Pyebridge, which were set out in the Pyebridge Trading Update RNS announcement dated 19 October 2022. The Company confirms that due to unexpected variables during the period under review, including the generation of unprecedented record levels of electricity generation from renewables, most notably wind (which is a hedge to reserve power) from September to December 2022 in the UK, and which went beyond those considered possible by the Company when issuing its expectations, the previously stated expectations are no longer valid. This is a consequence of the increase in electricity generation from renewables reducing the reserve power required across the UK during this period and consequently impacting the electricity generation sales at Pyebridge.

 

Pyebridge Asset Value

 

Following the Pyebridge SPA deferred consideration settlement (see RNS dated 16 December 2022), the total effective acquisition purchase price for the Site was reduced to c. £2.1m.

 

During the Site's recent annual insurance cover policy review, the Site's asset value was independently confirmed at c. £6.3m (on a conservative replacement cost basis). The Site's fair asset value compared to its purchase price therefore highlights the significant upside that MED's investment in Pyebridge has established.

 

Pieter Krügel, MED CEO, commented: "We are pleased to report that Pyebridge obtained new Capacity Market contracts at considerably higher values, which will significantly enhance the Site's revenue profile and profitability. Moreover, we are pleased with the Site's actual performance during 2022, with specific reference to the 88% outperformance of the average market price, highlighting our ability to provide significantly better returns compared to the market. We are confident in our ability and strategy to keep delivering outperformance during 2023. Finally, the Site's fair asset value compared to its acquisition price furthermore highlights MED's ability to identify and acquire sites at an attractive discount in order to enhance value for its shareholders.

 

Further, we are advancing the development of the rest of our projects in the portfolio and looking forward to bringing our next project, Bordesley into production later this year.

 

"MED has a very exciting year ahead, being well established and positioned to fast-track production and growth. We look forward to updating investors with further key developments during the year ahead."

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

**ENDS**

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

James Biddle

Roland Cormish

+44 207 628 3396

Beaumont Cornish Limited

Nominated Adviser

Claire Noyce

+44 20 3764 2341

Hybridan LLP

Joint Broker

Damon Heath

+44 207 186 9952

Shard Capital Partners LLP

Joint Broker

Zainab Slemang van Rijmenant

zainab@lifacommunications.com

Lifa Communications

Investor and Media Relations Consultant

 

Johannesburg

27 February 2023

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKDLBLXLLFBBF
Date   Source Headline
30th Jun 201711:15 amRNSResult of AGM
23rd Jun 20178:00 amRNSProactive-Investors One2One event on 29 June 2017
15th Jun 20177:00 amRNSImweru Drill Programme Update
14th Jun 20177:00 amRNSMCPP Gains Momentum after Talks with Stakeholders
8th Jun 201711:00 amRNSAnnual Report and Notice of AGM
8th Jun 20178:09 amRNSKibo Monthly Q&A for Investors
2nd Jun 20179:00 amRNSNotice of AGM
2nd Jun 20178:00 amRNSLake Victoria Early Stage Licence Portfolio Update
1st Jun 20177:00 amRNSMCPP Receives Formal Reconfirmation
31st May 20177:00 amRNSUpdate on Katoro Gold PLC: Imweru Gold Project
31st May 20177:00 amRNSWork on Imweru Gold Project Commences
26th May 201711:00 amRNSFull Year Results 2016
5th May 20178:14 amRNSUpdate on Opera Reverse Take Over Transaction
20th Apr 20177:00 amRNSMCPP: MOU Mbeya Cement
12th Apr 20179:00 amRNSKibo commences monthly Q&A for investors
30th Mar 20177:00 amRNSDiversified Production Strategy for Mbeya Mine
23rd Mar 20178:00 amRNSQ1 2017 Strategic Objectives successfully met
6th Mar 20172:15 pmRNSMCPP Delivers First Classrooms
2nd Mar 201710:30 amRNSUpdate on Proposed Acquisition by Opera
1st Mar 201712:50 pmRNSNotifiable Holding Change
24th Feb 201710:00 amRNSCessation of Metal Tiger Joint Ventures
15th Feb 20179:31 amRNSMbeya Coal to Power Project Update
15th Feb 20178:45 amRNSMbeya Coal to Power Project Update
27th Jan 20177:00 amRNSChange of Share Registrar
23rd Jan 20177:00 amRNSMCPP Update: Integrated Bankable Feasibility Study
16th Jan 20177:00 amRNSMCPP: Final Approval for ESIA Scoping Reports
3rd Jan 201711:45 amRNSAnnouncement regarding TANESCO press reports
21st Dec 20162:50 pmRNSShare Issue
21st Dec 20168:47 amRNSTerm Sheet with Sanderson Capital Partners Agreed
21st Dec 20167:16 amRNSMCPP Update
19th Dec 20169:18 amRNSMCPP Update: EPC Contract Awarded to SEPCO III
9th Dec 20167:30 amRNSShare Issue
2nd Dec 20167:00 amRNSUpdate on Acquisition by Opera
30th Nov 20167:00 amRNSMCPP Update: Integrated Financial Model Completed
21st Nov 20167:00 amRNSMCPP Update: Collaboration Agreement with GE
1st Nov 20167:00 amRNSMCPP Update: Kibo Receives Final Commercial Bids
13th Oct 20167:00 amRNSAgreement of Development Costs for MCPP
27th Sep 20169:00 amRNSHalf-year Report
23rd Sep 20168:00 amRNSMCPP Update: Date Extended to Finalize Agreement
23rd Sep 20167:45 amRNSSigned Heads of Agreement with Opera Investments
22nd Sep 20167:00 amRNSMCPP Update: Financial Advisory Mandate Letter
16th Sep 20167:00 amRNSMCPP Update: MOU with GE International Inc.
8th Sep 201610:00 amRNSTransfer of Kibo Shares to Sanderson
5th Sep 20167:30 amRNSMCPP SEPCO III Agreement Update
1st Sep 20167:00 amRNSSanderson Loan Facility Repayment
25th Aug 20167:00 amRNSMCPP Update: New Agreement with SEPCO III
17th Aug 20168:00 amRNSLetter of Engagement with Norton Rose Fulbright
10th Aug 20161:00 pmRNSShare Issue
10th Aug 20167:02 amRNSDefinitive Agreement with Lake Victoria Gold Ltd
3rd Aug 20168:00 amRNSMCPP and Imweru Gold Project Interim Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.