Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0175
Bid: 0.015
Ask: 0.02
Change: -0.0025 (-12.50%)
Spread: 0.005 (33.333%)
Open: 0.02
High: 0.02
Low: 0.0165
Prev. Close: 0.02
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Benga Power Plant Project Update

22 Dec 2020 08:00

RNS Number : 4931J
Kibo Energy PLC
22 December 2020
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

("Kibo" or "the Company")

 

Dated: 22 December 2020

 

Kibo Energy PLC ('Kibo' or the 'Company')

 Benga Power Plant Project Update

 

Kibo Energy PLC ("Kibo" or the "Company"), the multi-asset, Africa focused, energy company, is delighted to provide a progress update on the Benga Power Plant Project in Mozambique ("BPPP").

 

Highlights

· Current Non- Binding Term Sheet for Coal Supply from Vale converted into a mutually binding Term Sheet to secure coal supply for BPPP; (See RNS of 5 September 2019);

· Lesedi Nuclear Services (Pty) Ltd ("LNS") completed optimized Definitive Feasibility Study ("DFS") based on current Base Case DFS successfully, enhancing project economic viability and bankability; and

· Findings of the final draft optimized DFS presented to the technical and commercial team of EDM on 17 December 2020.

 

CSTS with Vale

 

The Company has entered into a mutually binding Coal Supply Term Sheet ('CSTS') with Vale Mozambique, S.A. ('Vale') to supply coal to the Benga Power Plant Project in Mozambique ('BPPP'). The CSTS commits the parties to a supply agreement that will meet the full operational coal requirement of a 150 MW (gross generation capacity) coal fired power plant. The CSTS will be converted into a definitive Coal Supply Agreement ("CSA") as part of the process during which a final Power Purchase Agreement ("PPA") is finalized with EDM

 

Vale is a local coal miner, and subsidiary of Vale SA, one of the world's largest diversified miners, situated in very close proximity to the BPPP site. The CSTS with Vale was based on the findings of the optimized DFS which indicated that a blend of varying quality bituminous coal can be fed to the Power Plant CFB boiler. Vale has the capacity and capability to supply the different coal qualities for an optimal blend and the CSTS provides for a supply of c. 650 000 tonnes of coal per annum, structured to supply the various coal qualities required for the optimal blend.

 

Optimized DFS

 

LNS have completed and delivered a final draft of the BPPP optimized DFS study to Kibo. This optimization study focused on conducting various trade-off studies most notably:

 

· Investigating the coal characteristics in more specific detail as well as the tolerance of the coal blending ratio variances in the CFB boilers

· Consideration of various clean coal technologies - (E.g., the power plant has been designed to be 'carbon capture ready')

· Site location study with trade-off work conducted on various other possible sites

· Optimal boiler sizing

· Geotechnical considerations that may impact on building and operating the Benga power plant on the designated site

· Updating of the Financial Model

· Coal haulage road selection

 

The Company is currently reviewing the findings from the optimized DFS and a final version of the optimized DFS will be delivered to the Company in early January 2021. These findings were also presented to EDM during a preliminary DFS-briefing on 17 December 2020. The preliminary briefing concluded with several next steps agreed between the parties. These next steps are in preparation for further technical and commercial discussions that relates to the development and agreement of a PPA, following the agreed process and procedure set out in the existing MOU with EDM. Said discussions have been set for January 2021.

 

Louis Coetzee, CEO of Kibo Energy, commented: 

"We are extremely pleased with the progress on the Benga project, as the technical work is now nearing completion and seamlessly integrates with the commercial and statutory developments. The optimised DFS and binding term sheet for a Coal Sale Agreement are key cornerstones / prerequisites to take the EDM PPA negotiations progressively forward towards agreeing a final PPA."

 

"The ongoing and increasingly negative impact of COVID-19 has caused numerous delays during the past year, most notably regarding the inability to travel freely and conduct on-site work in an unfettered manner. Despite these constraints the BPPP made significant strides forward during 2020 and we have been able to sustain forward momentum and in fact gain significant new momentum towards the end of 2020. It is with this momentum that we will be entering 2021 and with firm confidence that the BPPP can still be delivered within the broad timelines discussed in previous announcements."

 

**ENDS**

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

JSE Corporate and Designated Adviser

Thomas Smith

+44 (0) 20 7392 1494

ETX Capital Limited

Joint Broker

Bhavesh Patel / Stephen Allen

+44 20 3440 6800

RFC Ambrian Limited

NOMAD on AIM

Charlotte Page / Beth Melluish

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

Notes

Kibo Energy PLC is a multi-asset, Africa focused, energy company positioned to address the acute power deficit, which is one of the primary impediments to economic development in Sub-Saharan Africa. To this end, it is the Company's objective to become a leading independent power producer in the region.

 

Kibo is simultaneously developing three similar coal-fuelled power projects: the Mbeya Coal to Power Project ('MCPP') in Tanzania; the Mabesekwa Coal Independent Power Project ('MCIPP') in Botswana; and the Benga Independent Power Project ('BIPP') in Mozambique. By developing these projects in parallel, the Company intends to leverage considerable economies of scale and timing in respect of strategic partnerships, procurement, equipment, human capital, execution capability / capacity and project finance.

 

Additionally, the Company has a 60% interest in MAST Energy Developments Limited ('MED'), a private UK registered company targeting the development and operation of flexible power plants to service the UK Reserve Power generation market.

 

Johannesburg

22 December 2020

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGZMZZNZRGGZG
Date   Source Headline
30th Sep 20139:45 amRNSHalf Year Results Announcement
16th Sep 20137:00 amRNSRecent Encouraging Stream Sampling Results
11th Sep 20137:00 amRNSRaises further £500,000 in Secondary Placement
9th Sep 20137:30 amRNSHaneti Joint Venture Project Update
30th Aug 201310:52 amRNSKibo raises £1,105,000 in Share Placing
13th Aug 20137:30 amRNSKibo Announces new Consolidated Lake Victoria Gold
1st Aug 20137:00 amRNSChange in UK Broking Arrangements
31st Jul 20134:45 pmRNSRESULTS OF THE ANNUAL GENERAL MEETING
31st Jul 20137:00 amRNSHaneti Project Interim Update
18th Jul 20137:00 amRNSMOU Signed with Korean East West Power
11th Jul 20137:00 amRNSHaneti Interim Project Update
8th Jul 201310:00 amRNSAnnual Report, AGM Date and Director Resignations
1st Jul 20137:00 amRNS15 months results for the period ended 31 Dec 2012
19th Jun 20137:00 amRNSHaneti Project Update
3rd Jun 201310:31 amRNSProjects Update Announcement
26th Apr 20134:36 pmRNSIssue of shares for Cash
24th Apr 20133:16 pmRNSPROJECT UPDATE & PLACING
10th Apr 20138:04 amRNSKibo commences program on Haneti Nickel
22nd Mar 201312:30 pmRNSResults of EGM and Capital Reorganisation Details
11th Mar 20137:02 amRNSTanzanian Government Declares Support for Rukwa
5th Mar 20132:19 pmRNSCapital Reorganisation and Issue of Equity
28th Feb 20131:38 pmRNSAppointment of XCAP as new joint Corporate Broker
14th Feb 20131:53 pmRNSInvitation from Tanzanian Government to present
11th Feb 201311:57 amRNSChange in UK Broking Arrangements
25th Jan 20132:07 pmRNSRETIREMENT OF DIRECTOR
17th Jan 201310:39 amRNSIssue of Shares Announcement
9th Jan 20137:08 amRNSKibo Mining plc raises £725,000 of working capital
12th Dec 201210:18 amRNSJoint Venture with Votorantim Group finalised
12th Dec 20129:38 amRNSSHAREHOLDER AND TRADING UPDATE, CHANGE OF YEAR END
14th Nov 20127:00 amRNSSignificant Anomaly Identified at Morogoro South P
18th Oct 20123:05 pmRNSIssue of shares for Cash
6th Sep 201212:50 pmRNSRESULTS OF EXTRAORDINARY GENERAL MEETING
20th Aug 201212:56 pmRNSSchedule 1 - Kibo Mining Plc
15th Aug 20127:30 amRNSRestoration - Kibo Mining Plc
15th Aug 20127:00 amRNSRE-ADMISSION OF KIBO SHARES
21st Jun 20128:04 amRNSOperational Update
21st Jun 20127:58 amRNSHalf Yearly Report
22nd May 20129:43 amRNSAppointment of Joint Broker
15th May 20128:56 amRNSMemorandum of Understanding for Tanzanian Mine
11th May 201212:12 pmRNSKIBO APPOINTS RFC AMBRIAN AS NOMINATED ADVISER
11th May 20127:30 amRNSSuspension - Kibo Mining Plc
11th May 20127:30 amRNSTemporary Suspension - Proposed Acquisition
8th May 20122:05 pmRNSMemorandum of Understanding
17th Apr 20127:00 amRNSPropsed Adjournment of Annual General Meeting
2nd Apr 20127:00 amRNSMEL Acquisition
30th Mar 20127:00 amRNSFinal Results
5th Mar 20121:00 pmRNSChange of Adviser
29th Feb 20127:00 amRNSTotal Voting Rights
7th Feb 20124:40 pmRNSSecond Price Monitoring Extn
7th Feb 20124:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.