Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKemin Resources Regulatory News (KEM)

  • There is currently no data for KEM

Project Update

8 May 2006 09:37

GMA Resources PLC08 May 2006 GMA Resources Plc 8 May 2006 Project Update GMA Resources Plc, is pleased to announce that an airborne magnetic andradiometric geophysical survey program commenced on 7 May over the 1,417 squarekm ENOR concession situated in Southern Algeria. The permit hosts the Tirek andAmesmessa gold projects and is jointly held by GMA (52%) and Sonatrach (48%). Fugro Airborne Surveys (Pty) Ltd ("Fugro") was selected as the contractor to flythe survey. Fugro operates around the world with approximately 8,500 staffpermanently stationed in over 50 countries. A fixed wing platform will be used to fly 9,115 line km over the entireconcession. E-W survey lines will be 200m apart, with infill lines added at100m spacing over two blocks covering the Tirek and Amesmessa projects, as wellas N-S control lines. Parameters to be recorded include total magnetic field andhorizontal and longitudinal gradients, 4-channel gamma-ray spectrometry(radiometrics) and altimetric data to generate a Digital Terrain Model map. For the duration of the programme, Fugro will operate out of ENOR's camp atTirek and will use the airstrip, the logistical support and the availablefacilities on site. Southern Geoscience Consultants ("SGC") at Perth, Australia was retained by ENORto design the survey specifications and provide independent Quality Assurancecontrol on data acquisition and processing by Fugro. SCG will complete the finaldata processing, interpretation and ranking of the targets. A representative selection of rock samples was collected recently along atraverse across the concession in order to measure their magnetic susceptibilityto help correlate the rock units with their signature on the geophysicalresults. Concurrently to the geophysical survey, a combination of geological andstructural interpretation of aerial photographs and satellite imagery will beused to enhance the structural features and help delineate target areas forfurther exploration. In addition, a soil and stream sediment samplingorientation survey was carried out in April in preparation for furtherdefinition of the new targets. This integrated approach will help ENOR fully evaluate the potential of theconcession for which large portions have not been the subject to detailedexploration work. While the results from the geophysical survey are awaited, field work will focuson mapping and sampling new quartz veins and mineralized alteration haloes.Quartz veins areas where the mineralized salvages were neglected will bere-sampled for their potential to provide additional lower-grade goldmineralization amenable to heap leaching process. The design and supervision of exploratory work on the concession is under theresponsibility of ENOR's geologists Prof. A. Boufassa, PhD (TechnicalCoordination Manager), Jan van Graan (Geological Consultant) and Yves A. Buro(Geology Manager), a Qualified Person for the purposes of Canadian NationalInstrument 43-101 that sets out minimum standards of Disclosure for MineralProjects. The Board of ENOR recently approved a budget of US$1,000,000 for exploration tobe carried out to over the next year. It should also be noted that GMA announced on 12 April 2006 that ENOR hasstarted the construction of a 1,500 tonnes per day heap leach plant atAmessmessa and the upgrade of the Tirek CIL plant from 150 to 300 tonnes perday. Also 23 pieces of Caterpillar equipment and three Tamrock drills have beenordered for delivery in 2006, starting in May 2006. Annualized gold productionof 100,000 ounces per year is expected as of January 2007. Enquiries: GMA Resources PlcDouglas Perkins - Chief Executive OfficerTel: +44 (0) 20 7253 7670Mobile: +1 514 806 6788 Philip Secrett/Fiona OwenGrant Thornton Corporate FinanceTel: +44 (0) 20 7383 5100 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
28th Mar 200712:37 pmRNSIssue of Stock Options
21st Mar 20073:42 pmRNSHolding in Company
20th Mar 20072:33 pmRNSHolding in Company
15th Mar 200710:19 amRNSHolding in Company
6th Mar 20078:39 amRNSHolding in Company
5th Mar 20078:27 amRNSHolding in Company
28th Feb 20077:00 amRNSTotal Voting Rights
26th Feb 200710:07 amRNSHolding in Company
22nd Feb 20079:25 amRNSHolding in Company
8th Feb 200711:49 amRNSHolding in Company
31st Jan 20077:02 amRNSPlacing
18th Dec 200612:30 pmRNSTotal Voting Rights
15th Dec 20067:58 amRNSDecember Construction Update
1st Dec 20068:36 amRNSSignificant Shareholder
30th Nov 20068:57 amRNSSignificant Shareholder
7th Nov 20068:05 amRNSConstruction Update
2nd Nov 20069:39 amRNSLaunch of New Website
4th Oct 200612:42 pmRNSInterim Results - Amend
28th Sep 20067:05 amRNSInterim Results
28th Sep 20067:00 amRNSMetallurgical Testing Results
18th Jul 200612:46 pmRNSResult of AGM
29th Jun 20067:03 amRNSConstruction Update
28th Jun 20067:01 amRNSAnnual Report and Accounts
27th Jun 20062:20 pmRNSSignificant Shareholder
19th Jun 20066:57 pmRNSFinal Results
30th May 20064:50 pmRNSSignificant Shareholder
30th May 20063:21 pmRNSProject Financing Update
8th May 20069:39 amRNSSignificant Shareholder
8th May 20069:37 amRNSProject Update
3rd May 20065:33 pmRNSSignificant Shareholding
2nd May 20062:35 pmRNSSignificant Shareholding
2nd May 20069:26 amRNSSignificant Shareholder
21st Apr 200612:56 pmRNSDirector Shareholding
18th Apr 200610:49 amRNSDirector Shareholding
12th Apr 20064:12 pmRNSIssue of Shares
7th Apr 200610:24 amRNSResignation of Director
6th Apr 20061:29 pmRNSIssue of Options
7th Mar 20069:07 amRNSDirector Shareholding
2nd Mar 200612:05 pmRNSTrading/prod'n plan update
1st Feb 200612:33 pmRNSResignation of Director
11th Jan 20067:00 amRNSTrading update
20th Dec 20054:09 pmRNSDirectorate Change - Replace
20th Dec 20053:54 pmRNSDirectorate Change
24th Nov 20057:47 amRNSAdditional Listing
23rd Nov 200512:56 pmRNSResult of EGM
31st Oct 20059:49 amRNSPlacing and Issue of Options
17th Oct 200512:46 pmRNSDirectorate Change
17th Oct 200512:42 pmRNSChange of Adviser
11th Oct 20052:57 pmRNSFeasibility Study
10th Oct 20059:19 amRNSFeasibility Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.