GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKemin Resources Regulatory News (KEM)

  • There is currently no data for KEM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Construction Update

7 Nov 2006 08:05

GMA Resources PLC07 November 2006 7 November 2006 AIM: GMA GMA Resources Plc CONSTRUCTION UPDATE GMA Resources Plc ("GMA" or "the Company") is pleased to announce an update withregards to the construction of the Tirek / Amesmessa Gold Project ("Tirek /Amesmessa" or "the Project") in Algeria. GMA owns 52% of ENOR spa ("ENOR"), theAlgerian operating company for Tirek / Amesmessa, with the remainder owned bySonatrach, the Algerian state-owned oil and gas company. Major Equipment All preparations for the delivery of the major equipment for Tirek / Amesmessaare progressing well with orders currently in process. As of today, allequipment relating to the Phase 1 Leasing contract with Arab Leasing Corporationis at site. This includes 6 CAT 735 articulated trucks, 2 CAT 980 wheel loaders,1 CAT D-8 bulldozer, 1 CAT 930 wheel loader, 1 CAT 365 shovel and 2 TamrockPanterra 1500 drills. Equipment for Phase 2 of the Arab Leasing Finance isawaiting documentation in the Port of Marseilles, France. Processing Plant Pre-shipment inspections of the Summit Valley equipment (supplier of the carbonabsorption, carbon regeneration and acid wash systems, as well as theelectrowinning circuit and equipment for carbon handling and gold refining) willbe completed within the next week. A pre-shipment inspection of the Roc Impactequipment (crushing and agglomeration equipment) is also complete. Assay Laboratory The pre-shipment inspection of the equipment for the modular assay laborary,supplied by Unit Electrical Engineering Ltd, will take place during the secondweek of November. Quoted availability for shipping is mid November 2006. Pipeline Preparations for the construction of the pipeline to supply process water to theTirek Mines are progressing. The pipe will be supplied by AB Alvenius of Swedenand shipments from Alvenius' factory are now scheduled to begin in mid November,with the final shipments expected to be made in mid January 2007. Thepre-shipment site visit to Sweden is complete. The modular water pumping stationwill be shipped from Utah in USA during November. Tirek Mine - Ball Mill With regards to the expansion of gold production at the existing Tirek Mine, GMAis pushing ahead with the objective to more than double existing processingcapacity. A new 9ft x13ft, 525kW ball mill for the Tirek Mine processing planthas been purchased from New Concepts Projects of South Africa. The ball mill iscurrently in Johannesburg, where an engineering assessment has been completedand work has started to bring the ball mill to a fully refurbished state.Delivery of this to site is now expected in March 2007. Heap Leach Liner The heap leach liner fabrication is complete and the material is ready forshipment to site from Spain. Installation is expected to commence in lateJanuary 2007. Power Generation The first group of generators will be ready to ship from the UK in December. Heap Leach Pad Construction Earthworks started at Amesmessa site in October. Amesmessa Base Camp Construction is well advanced on the camp and office facilities at Amesmessawith the camp currently lodging approximately 70 construction workers. A 250 mancamp facility was purchased from ATCO in September and will be ready to shipfrom Indonesia in late December 2006. Also, VSAT wide band communication hasbeen established at both Tirek and Amesmessa. Exploration While the Company's main focus is currently progressing construction, GMA isalso keen to progress exploration, particularly given the untapped potential ofthe Project. The Company has now appointed an exploration team, comprising ofthree highly experienced geologists, committed to the development of newresources at Tirek / Amesmessa. To that effect, they are presently beginning a$1,000,000 regional exploration programme over the next year. Apart from thepotential to find many previously undiscovered high grade veins, the team islooking to identify lower grade, bulk mineable targets. These lower grade areaswould have been ignored by previous exploration work carried out on the Projectover the past 25 years concentrated on the identification of high grade areasonly. Column tests are presently being run on material grading 2-3 grams per tonto confirm the leachability of the ore. Douglas Perkins, CEO of GMA, commented: "The recently announced positive column test results combined with ouraggressive construction schedule mean that GMA has a very exciting year aheadwith first production commencing at Amesmessa in the first quarter of 2007. Iwould like to direct interested parties to view photos of the constructiondevelopments at our newly designed website: www.gmaresources.co.uk." Enquiries: Douglas PerkinsGMA Resources+1 514 806 6788dperkins@gmaresources.co.uk Grant ThorntonPhilip Secrett+44 (0)20 7383 5100 Parkgreen CommunicationsCathy Malins / Annabel Leather+44 (0)20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Oct 20183:15 pmBUSCompany update
19th Oct 20184:31 pmBUSCompany update following resignation of Nominated Adviser
28th Sep 201812:13 pmBUSHalf-year Report
28th Sep 20189:42 amBUSTemporary Suspension
28th Sep 20187:30 amRNSSuspension - Kemin Resources Plc
28th Sep 20187:00 amRNSResignation of Nominated Adviser
3rd Aug 201812:20 pmRNSConfirmation of Licence Extension
29th Jun 20183:55 pmRNSResult of AGM & Licence Extension
4th Jun 20187:00 amRNSFinal Results
19th Mar 20187:00 amRNSUpdate on the Drozhilovskoye ore field
27th Sep 20177:00 amBUSHalf-year Report
14th Jul 201711:50 amRNSResult of AGM
16th Jun 20172:07 pmRNSPostponement of AGM
8th Jun 20176:26 pmRNSFinal Results for the Year Ended 31 December 2016
30th Sep 20167:00 amBUSHalf-year Report
14th Jul 20161:03 pmBUSDirectorate Change
30th Jun 201612:06 pmBUSResult of AGM
29th Jun 201612:17 pmRNSResult of AGM
7th Jun 20164:37 pmBUSFinal Results
4th May 20169:27 amBUSDirectorate change
24th Sep 20157:00 amRNSHalf Yearly Report
30th Jun 20152:03 pmRNSResult of AGM
29th Jun 201512:00 pmRNSPosting of Annual Report
18th Jun 20153:28 pmRNSPreliminary Results: Year Ended 31 December 2014
10th Jun 20154:46 pmRNSNotice of AGM
25th Sep 20147:00 amRNSInterim Report
7th Jul 20149:51 amRNSHolding(s) in Company
30th Jun 20141:33 pmRNSAccounts Posting and Result of AGM
27th Jun 201410:34 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
25th Jun 20147:00 amRNSCompletion of £2.05 million Placing
20th Jun 20145:03 pmRNSPreliminary Results for the Year Ended 31 Dec 2013
17th Jun 20147:00 amRNSUpdate on Annual Report and Financial Statement
6th Jun 20144:26 pmRNSNotice of AGM
6th Jun 20144:06 pmRNSNotice of AGM
3rd Jun 20147:00 amRNSPlans for Processing Plant Approved
22nd Apr 201410:39 amRNSRepayment of Zadessa Loan
17th Dec 20137:00 amRNSDirector Appointment
10th Dec 20137:10 amRNSPre-Feasibility Study
18th Nov 20137:00 amRNSAppointment of Joint Broker
27th Sep 20137:00 amRNSInterim Results for period ended 30 June 2013
17th Sep 20137:00 amRNSAppointment of New Chairman
29th Aug 20138:48 amRNSAppointment of Feasibility Study Contractor
2nd Jul 20133:00 pmRNSDirectorate Change
28th Jun 20134:30 pmRNSResult of AGM
12th Jun 20137:00 amRNSTotal Voting Rights
5th Jun 20134:30 pmRNSFinal Results
4th Jun 20137:00 amRNSResignation of Director
31st May 20134:00 pmRNSChange of Adviser
31st May 20133:35 pmRNSContract Reinstatement
23rd Apr 20133:01 pmRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.