Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKemin Resources Regulatory News (KEM)

  • There is currently no data for KEM

Construction Update

29 Jun 2006 07:03

GMA Resources PLC29 June 2006 28 June 2006 AIM: GMA GMA Resources Plc CONSTRUCTION UPDATE GMA Resources Plc ("GMA" or "the Company") is pleased to announce an update withregards to the construction of the Tirek / Amesmessa Gold Project ("Tirek /Amesmessa" or "the Project") in Algeria. GMA owns 52% of ENOR spa ("ENOR"), theAlgerian operating company for Tirek / Amesmessa, with the remainder owned bySonatrach, the Algerian state-owned oil and gas company. Major Equipment: All preparations for the delivery of the major equipment for Tirek / Amesmessaare well underway with orders currently in process. Equipment selection hasbeen made with a view to acquiring modular, mobile equipment which will givemine management the flexibility to relocate machinery to new areas of theProject at a low cost, in order to respond to new sources of mineable ore asthey are discovered. GMA has signed a comprehensive maintenance and service agreement withCaterpillar for the provision of this equipment. This contract will ensure thatsupplies and spares parts are offered to GMA at no cost for the period of oneyear, and will provide for two Caterpillar technicians to be on site on rotationfour weeks on and fours weeks off for a period of 24 months. It will alsoensure full training at the mine site of ENOR personnel on the operation of eachtype of equipment, as well as training of the ENOR mechanics on the maintenanceof the equipment going forward. Processing Plant: Summit Valley Equipment & Engineering Inc. of Utah, USA has been selected as asupplier of the carbon adsorption, carbon regeneration and acid wash systems, aswell as the electrowinning circuit and equipment for carbon handling and goldrefining, whilst Roc-Impact of France has been selected as a supplier for thecrushing and agglomeration equipment. Both companies have confirmed that theirequipment is expected to become available for shipping to Algeria in midNovember 2006. Assay Laboratory Unit Electrical Engineering Ltd of British Columbia, Canada will supply a fullyequipped modular assay laboratory, again with quoted availability for shippingin mid November 2006. Pipeline A pipeline will be built to supply process water from the Tanzerouft well,approximately 45 km from the existing Tirek Mine. The Tirek Mine is locatedsome 60km north of the Amesmessa site, which is in the extreme south of theexploitation permit area. The pipe will be supplied by AB Alvenius of Swedenand shipments from Alvenius' factory should begin in mid October, with the finalshipments to be made in mid December 2006. Tirek Mine - Ball Mill With regards to the expansion of gold production at the existing Tirek Mine, GMAis pushing ahead with the objective to more than double existing processingcapacity. A new ball mill for the Tirek Mine processing plant has beenpurchased from New Concepts Projects of South Africa. This is a 9ft x13ft,525kW ball mill purchased from an existing mine and will be completelyrefurbished. The ball mill is currently in Perth, Australia, where engineeringassessment is under way to evaluate the work required to bring the ball mill toa fully refurbished state. Delivery of this to site is expected in November2006. Douglas Perkins, CEO of GMA, commented: "As announced in our recent final results, ENOR Spa is now firmly inconstruction mode at Amesmessa and this update demonstrates that all aspects aremoving forward apace." Enquiries: Douglas PerkinsGMA Resources+44 (0)20 7253 7670 Grant ThorntonPhilip Secrett+44 (0)20 7383 5100 Parkgreen CommunicationsCathy Malins / Annabel Leather+44 (0)20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Oct 20183:15 pmBUSCompany update
19th Oct 20184:31 pmBUSCompany update following resignation of Nominated Adviser
28th Sep 201812:13 pmBUSHalf-year Report
28th Sep 20189:42 amBUSTemporary Suspension
28th Sep 20187:30 amRNSSuspension - Kemin Resources Plc
28th Sep 20187:00 amRNSResignation of Nominated Adviser
3rd Aug 201812:20 pmRNSConfirmation of Licence Extension
29th Jun 20183:55 pmRNSResult of AGM & Licence Extension
4th Jun 20187:00 amRNSFinal Results
19th Mar 20187:00 amRNSUpdate on the Drozhilovskoye ore field
27th Sep 20177:00 amBUSHalf-year Report
14th Jul 201711:50 amRNSResult of AGM
16th Jun 20172:07 pmRNSPostponement of AGM
8th Jun 20176:26 pmRNSFinal Results for the Year Ended 31 December 2016
30th Sep 20167:00 amBUSHalf-year Report
14th Jul 20161:03 pmBUSDirectorate Change
30th Jun 201612:06 pmBUSResult of AGM
29th Jun 201612:17 pmRNSResult of AGM
7th Jun 20164:37 pmBUSFinal Results
4th May 20169:27 amBUSDirectorate change
24th Sep 20157:00 amRNSHalf Yearly Report
30th Jun 20152:03 pmRNSResult of AGM
29th Jun 201512:00 pmRNSPosting of Annual Report
18th Jun 20153:28 pmRNSPreliminary Results: Year Ended 31 December 2014
10th Jun 20154:46 pmRNSNotice of AGM
25th Sep 20147:00 amRNSInterim Report
7th Jul 20149:51 amRNSHolding(s) in Company
30th Jun 20141:33 pmRNSAccounts Posting and Result of AGM
27th Jun 201410:34 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
25th Jun 20147:00 amRNSCompletion of £2.05 million Placing
20th Jun 20145:03 pmRNSPreliminary Results for the Year Ended 31 Dec 2013
17th Jun 20147:00 amRNSUpdate on Annual Report and Financial Statement
6th Jun 20144:26 pmRNSNotice of AGM
6th Jun 20144:06 pmRNSNotice of AGM
3rd Jun 20147:00 amRNSPlans for Processing Plant Approved
22nd Apr 201410:39 amRNSRepayment of Zadessa Loan
17th Dec 20137:00 amRNSDirector Appointment
10th Dec 20137:10 amRNSPre-Feasibility Study
18th Nov 20137:00 amRNSAppointment of Joint Broker
27th Sep 20137:00 amRNSInterim Results for period ended 30 June 2013
17th Sep 20137:00 amRNSAppointment of New Chairman
29th Aug 20138:48 amRNSAppointment of Feasibility Study Contractor
2nd Jul 20133:00 pmRNSDirectorate Change
28th Jun 20134:30 pmRNSResult of AGM
12th Jun 20137:00 amRNSTotal Voting Rights
5th Jun 20134:30 pmRNSFinal Results
4th Jun 20137:00 amRNSResignation of Director
31st May 20134:00 pmRNSChange of Adviser
31st May 20133:35 pmRNSContract Reinstatement
23rd Apr 20133:01 pmRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.