Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKefi Gold & Copper Regulatory News (KEFI)

Share Price Information for Kefi Gold & Copper (KEFI)

Share Price is delayed by 15 minutes
Get Live Data
1.02    -0.04 (-3.77%)
Bid:
1.014
Ask:
1.028
Spread: 0.014 (1.381%)
Market Cap: £140.47m
KEFI Live PriceLast checked at - London Stock Exchange

Intraday Kefi Gold & Copper Share Chart

Exploration Update

4 Dec 2012 07:00

AIM: KEFI4th December 2012 KEFI Minerals Plc ("KEFI Minerals" or the "Company") Exploration Update

KEFI Minerals, an AIM-listed gold and copper exploration company with projects in the Kingdom of Saudi Arabia, is pleased to announce additional diamond drill results from the initial drilling programme at the Jibal Qutman Licence and the completion of the geophysical IP survey at the Selib North Licence for the Company's 40%-owned Gold & Minerals Joint Venture ("G&M").

HIGHLIGHTS

* Diamond Drilling at Jibal Qutman returns encouraging intersections, including 7m at 6.13g/t Au and 3.8m at 5.46g/t Au * Trench sampling at Jibal Qutman returns 15m at 4.67g/t Au, 3m at 6.59g/t Au and 20m at 1.89g/t Au * IP and SP Survey complete at Selib North and preliminary interpretation identified 3 target zones for drill testing

JIBAL QUTMAN

The Jibal Qutman Licence was granted in July 2012 and exploration work has progressed rapidly from surface mapping and trenching to commencement of the first phase of diamond drilling.

A total of 35 diamond drill holes have been completed testing the shallow open cut potential of the gold mineralisation, which is hosted in a series of quartz veins over a 3km zone. Five holes are to be re-drilled due to low drill core recoveries (as low as 10% over several metres) in the mineralised zones. It is observed from trench mapping that higher gold grades are associated with the highly fractured parts of the quartz veins, which are often lost in the drilling process, and that there is supergene enrichment.

The main vein dips at 45° to the east and parallel veins form stringer zones around the Main Vein ("MV"). In addition, sets of flat lying veins have been recently recognised in a separate area in the Western Zone ("WZ") and Southern Zone ("SZ") of the prospect area.

Diamond drilling is being performed on initial 100m x 25m and 50m x 25m grids. The best results not reported previously, include:

HoleNo. From Interval g/tAu g/tAg(>20) Zone JDQ 7 25.4m 1.6m 9.01* 200.5 [MV] 42.4m 7.1m 5.85* 59.61 JDQ 12 74.0m 3.4m 1.69 - MV JDQ 13 (Pending) MV JDQ 15 56.0m 6.0m 1.00 - WZ JDQ 16 17.0m 1.0m 2.01 - WZ 31.2m 1.0m 1.10 - 40.0m 13.0m 1.17 - JDQ 17 15.5m 3.2m 1.08 - MV JDQ 18 34.4m 13.0m 1.29 - MV 58.5m 2.2m 4.77 - JDQ 19 20.0m 4.0m 2.69 38.5 WZ JQD 21 18.5m 6.2m 2.57 25.5 MV JQD 23 20.0m 1.3m 7.17 100.2 MV JQD 24 33.9m 7.0m 6.13 - MV JQD 26 29.2m 3.8m 5.46 - MV JQD 27 45.0m 30.00m 0.60 - MV

* Au grades previously reported

TRENCHESTrench No. Interval g/t Au Zone JQT 57 13.0m 1.07 MV JQT 58 15.0m 4.67 MV JQT 59 16.0m 0.77 MV JQT 60 3.0m 6.59 SZ JQT 69 3.0m 3.67 SZ JQT 84 1.7m 4.25 SZ JQT 87 20.6m 1.89 WZ JQT 89 11.3m 1.34 WZ

Drilling is continuing over all 3 zones. The latest drill holes completed have extended the Main Vein a further 75-100m south of previous drilling.

A dyke unit with disseminated and fractures filled with pyrite has been intersected in the Western and Main Vein zones, with low grade of 0.3 to 1.0g/t Au in up to 30m widths. This is an unexpected style of mineralisation and is different from quartz vein style.

Drilling is underway in the Southern Zone, testing the encouranging trench results included above.

SELIB NORTH

IP (induced polarisation and resistivity) and SP (Self Potential) survey was completed around the Camel Hill prospect at Selib North and surrounding area. A total of 11 sections spaced 100m apart, for a total of 12.7km line over a 1.2km2 area has been acquired.

The IP and SP survey was designed to identify sulphide-bearing (pyrite) north-south, southeast dykes, which host the gold mineralisation identified by recent trenching, with a best result of 17m at 3.43g/t Au, and diamond drilling best intersection of 11m at 3.11g/t Au.

Interpretation of IP and SP data was carried out in conjunction with other data sets, which included multi-element geochemistry of rock chip samples, Landsat ETM+, ASTER, Cluster Analysis of the IP data and direct measurements of the IP and resistivity parameters of mineralised and unmineralised drill core.

The resulting model of the physical properties has been successful and allowed to reconstruct the three-dimensional geometry and distribution of several lithological and alteration types.

A further 2 new target zones have been identified from preliminary processing and interpretation of the geophysical data. The 3 target zones are: i) beneath the previous shallow drilling at Camel Hill; ii) coincident with major North South trending faults in the centre of the survey area; and iii) in a high chargeability zone in the Southeast of the survey area.

A follow-up RC/diamond drill programme is being designed to test both the IP anomalies and zones along strike intersected by previous drilling. Drilling is expected to start in late December 2012.

Jeff Rayner , Managing Director of KEFI Minerals, commented:

"Drill results from Jibal Qutman continue to support high grade gold in quartz veins, surrounded by lower grade quartz stringer zone and in separate zones of stacked flat lying veins in the west and south of the prospsect. At Selib North, drilling will test the targets already identified from ongoing interpretation of recently acquired geophysical surveys."

KEFI Minerals' Strategic Plan in the Kingdom of Saudi Arabia

İn 2009, KEFI Minerals formed the Gold and Minerals Joint Venture ("G&M") in Saudi Arabia with local Saudi partner Abdul Rahman Saad Al-Rashid & Sons Company Limited ("ARTAR"), to explore for gold and associated metals in the Arabian Shield. To date, the G&M has conducted preliminary regional reconnaissance and lodged 23 Exploration Licence Applications (ELAs), of which 4 have been granted.

The ELAs were initially applied for and granted to ARTAR. Incorporation of G&M is now complete and granted Licences will be transferred into G&M in due course.

The Kingdom of Saudi Arabia has instituted policies to encourage minerals exploration and development and KEFI Minerals supports this priority by serving as the technical partner within G&M. ARTAR also serves this Government policy as the major partner in G&M, which is one of the early movers in the modern resurgence of the Kingdom's minerals sector.

-Ends- Enquiries KEFI Minerals

Jeffrey Rayner +90 533 928 1913

Fox-Davies Capital

Simon Leathers +44 203 463 5010

Bishopsgate Communications

Nick Rome +44 20 7562 3395

References in this announcement to exploration results and potential have been approved for release by Mr. Jeffrey Rayner. Mr Rayner is a geologist and has more than 25 years' relevant experience in the field of activity concerned. He is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and has consented to the inclusion of the material in the form and context in which it appears.

Further information on KEFI Minerals is available at www.kefi-minerals.com

XLON
Date   Source Headline
25th May 20101:11 pmPRNResult of AGM
30th Apr 201010:08 amPRNResults of drilling at Bakir Tepe Project
28th Apr 20108:19 amPRNFinal Results
15th Apr 201012:37 pmPRNSale of Yatik Gold Project
14th Apr 20107:00 amPRNUpdate on activities in Saudi Arabia
19th Feb 20108:15 amPRNDrilling Results at Artvin Project
2nd Feb 20107:01 amPRNNotification of Interest
2nd Feb 20107:00 amPRNTotal Voting Rights
22nd Jan 20107:00 amPRNEquity Placing
18th Jan 20107:00 amPRNNotification of Interest
8th Jan 20107:00 amPRNEquity Placing
6th Jan 201010:34 amRNSIssue of Equity
6th Jan 20107:00 amPRNCommencement Of Drilling At Bakir Tepe Project
24th Dec 20097:01 amRNSJoint Venture Finalised for Bakir Tepe Project
10th Nov 20097:00 amPRNJoint venture of Bakir Tepe project, Turkey
5th Nov 20097:00 amPRNCommencement of Drilling at Artvin Project
29th Sep 20097:00 amPRNInterim Results
30th Jul 20099:41 amRNSTotal Voting Rights
16th Jul 20091:57 pmPRNIssue of Equity
3rd Jul 20091:29 pmPRNAGM Results
30th Jun 20097:00 amPRNNotice of AGM
24th Jun 20094:05 pmRNSIssue of Equity
19th Jun 20097:00 amRNSIssue of Equity
15th Jun 20097:00 amPRNEquity Placing
11th Jun 20094:56 pmPRNIssue of Share Options
10th Jun 20099:30 amPRNFinal Results
28th May 20097:00 amPRNSaudi Arabia Joint Venture
30th Apr 20097:00 amPRNChange of Broker
31st Mar 20097:00 amRNSTotal Voting Rights
9th Mar 200911:35 amPRNResult of General Meeting
27th Feb 20097:00 amPRNTotal Voting Rights
25th Feb 20093:07 pmPRNNotification of Interest
20th Feb 20099:52 amPRNNotice of General Meeting
19th Feb 20097:15 amPRNEquity Placing
19th Feb 20097:00 amPRNPotential Strategic Partnerships
13th Feb 20098:51 amPRNArtvin project drilling results
22nd Jan 20099:36 amPRNCompletion of First Drilling Programme at Artvin Project
13th Nov 20087:00 amPRNCommencement of Drilling at Artvin Project
23rd Oct 200810:45 amPRNJoint Venture of Artvin Project, Turkey
25th Sep 20082:37 pmPRNInterim Results
10th Sep 20087:00 amRNSAppointment of joint broker
11th Aug 20087:00 amPRNGeophysical Survey Identifies Drill Targets
30th Jul 20087:00 amPRNExploration Update
10th Jul 20087:00 amRNSExploration Update On Artvin
1st Jul 200810:42 amRNSDrilling Results
17th Jun 200810:06 amRNSGrant Of Bakir Tepe Explorati
29th May 200812:50 pmRNSHolding(s) in Company
29th May 200812:34 pmRNSTotal Voting Rights
30th Apr 20087:52 amRNSIssue of Equity
23rd Apr 20084:17 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.