Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.30 (4.48%)
Bid:
6.50
Ask:
7.50
Spread: 1.00 (15.385%)
Market Cap: £28.65m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project - Update Stage 2 Drilling

24 Oct 2013 07:00

RNS Number : 2591R
Rare Earth Minerals PLC
24 October 2013
 



24 October 2013

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project - First Update Stage 2 Drilling

Rare Earth Minerals PLC (AIM: REM) announces that the first hole of a scheduled 24 hole second phase of diamond drilling (Stage 2 Programme) has been successfully completed and identified 59 metres of the same clay formation previously encountered during Phase one drilling on the El Sauz and Fleur Lithium concessions (the "Concessions" or individually, a "Concession") in northern Mexico.

David Lenigas, Rare Earth Minerals Chairman commented:

"The Company is very pleased to have started the second stage of drilling on this Lithium Project and that the first hole has successfully intersected the same sequence of clay down dip from the previously identified lithium-bearing clays. With drill and assay results from the expanded programme, it is expected the new data will provide further evidence that the concessions host a new, large lithium resource."

Update:

The diamond drill under contract from Godbe Drilling of Colorado, USA has completed the first hole of this campaign (ES-11) approximately 200 metres northeast of hole ES-01 and within 20 metres of the boundary with the neighbouring La Ventana concession to the north. It was drilled to a total depth of 258.16 metres and intersected a 35 metre interval of the upper clay unit and a 24 metre interval of the lower clay unit. The estimated true thickness of the upper clay is 33 metres and that for the lower clay is 22.5 metres. The preliminary log of the main units intersected in ES-11 is tabulated below.

The result of the first hole successfully demonstrates continuity of the clay units to depth down dip of the previously drilled resource and this new mineralisation will add to the overall resource once assays confirm the quantities of Lithium in the clay. A full suite of analytical results for lithium and other alkali metals and alkali earth metals from drill core samples are expected over the coming weeks.

 

Table 1. Preliminary Log of Hole ES-11

 

Hole: ES-11

From To Interval Lithology

0 169.7 169.7 Capping basalt

169.7 183.52 13.82 Upper sandstone

183.52 218.72 35.20 Upper clay (potential lithium bearing clay unit)

218.72 231.95 13.23 Ignimbrite

231.95 256.03 24.08 Lower clay (potential lithium bearing clay unit

256.03 258.16 2.13 Basal volcanics

 

The full Stage 2 diamond drill programme will consist of approximately 3,500 metres of NQ core in 24 holes which will have the following objectives:

· Complete infill holes required to upgrade the previously determined inferred resources on the Concessions, and

· Conduct step-out drilling to test for extensions of the previously determined inferred resources, particularly into the newly staked concessions, where geological mapping and the results of previous drilling conducted by the Company indicate that the lithium-bearing clay units may extend.

The drilling programme is estimated to take approximately 5 months with final results of drill core analyses expected in late March 2014. REM expects to make periodic announcements of results as they become available.

In conjunction with the drilling, geological mapping and rock sampling will resume on the Concessions in order to provide the Company with a full assessment of the lithium potential of its land holdings.

Metallurgical test work is also underway through Inspectorate Exploration & Mining Services Ltd of Canada to determine potential recoveries of lithium and a number of the alkali metals present in the deposit.

 

About the Sonora Lithium Project:

 

The Sonora Lithium Project consists of the La Ventana, La Ventana 1 and the San Gabriel concessions which are owned 100% by Bacanora along with the contiguous El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions owned 70% by Bacanora and 30% by REM. NI 43-101 compliant inferred resources have been estimated for the La Ventana Lithium Deposit totaling 60 million tonnes averaging 3,000 ppm Li (equivalent to 1.6% lithium carbonate assuming 100% recovery and no process losses). The initial NI- 43101 compliant inferred resource for the El Sauz and Fleur concessions reported a total of 88,271,000 tonnes, averaging 3,163 ppm Li at a 2,000 ppm cut-off (1.68% lithium carbonate equivalent assuming 100% recovery and no process losses) of which REM owns a 30% share. The resource is open down dip to the east and to the south. For further details concerning the Company's agreement with REM and details of the joint venture, please refer to the Company's press release dated May 22, 2013.

 

Qualified Person's Statement:

 

Information in this announcement relates to information compiled by Carl G Verley, P.Geo, a consultant to the Company, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is a Qualified Person with respect to the information disclosed herein.

 

Glossary of Technical Terms

 

· LCE = Lithium Carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE assumes 100% recovery and no process losses in conversion of Li to Li2CO3.

· Li = Lithium

· ppm = parts per million 

· NQ Core = Refers to the size of drill bit used to drill and recover core from a drill hole. The outside diameter of the bit is 75.7mm and the inside diameter of the bit is 47.6mm. The core extracted from the drilling will have a diameter of slightly less than 47.6mm.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMMZGZFNGFZZ
Date   Source Headline
17th Jun 20267:00 amRNSAzteca Execution Update
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.