Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    0.00 (0.00%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £26.60m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project - NI43-101 Technical Report

10 Jan 2014 09:31

RNS Number : 3775X
Rare Earth Minerals PLC
10 January 2014
 



10 January 2014

 

Rare Earth minerals plc

 

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project - NI43-101 Technical Report

 

Rare Earth Minerals (AIM: REM) is pleased to announce that the Company's Joint Venture Partner Bacanora Minerals Ltd ("Bacanora") has filed the Technical Report ("Report") on new alkali metal and alkali earth metal inferred resource in respect of the Fleur and El Sauz concessions ("Concessions") that form part of the Sonora Lithium Project in northern Mexico.

The Report, in compliance with the recognised Canadian Security Administrators' National Instrument 43-101 and CIM guidelines for reporting resources and reserves, has been filed by Bacanora on SEDAR and is also available for download on the Company's website at www.rareearthmineralsplc.com. A summary of the new resources for selected alkali metals is contained within Table 1.

Table 1. Summary of New Resources for selected alkali metals on the Concessions. Grade

Grade

Cut-off

(ppm Li)

True1

Thickness (m)

Tonnage

Li ppm

K %

Rb ppm

Cs ppm

Mg %

Sr ppm

Upper Clay

1,000

18.30

57,700,000

1,381

0.59

157

473

1.67

1,274

2,000

6.80

20,060,000

2,748

1.07

267

537

2.16

1,136

3,000

8.10

9,846,000

3,398

1.17

301

560

2.06

1,375

Lower Clay

1,000

27.60

96,103,000

2,526

1.10

263

702

1.77

983

2,000

14.70

68,211,000

3,278

1.34

331

807

2.22

1,007

3,000

24.00

44,083,000

4,030

1.65

379

886

2.18

1,092

Combined Clay Units

1,000

45.90

153,806,000

2,052

0.91

224

617

1.73

1,092

2,000

21.50

88,271,000

3,163

1.28

317

749

2.21

1,036

3,000

32.10

53,929,000

3,922

1.56

364

822

2.16

1,148

 

1 True thickness is estimated to be 94% of drill intercepts.

2 It should be noted that figures expressed above are gross figures. The Concessions are the subject of a joint venture between the Company and REM, pursuant to which REM has an option to earn up to a 49.9% interest. To date, REM has earned a 30% interest.

David Lenigas, the Company's Chairman commented:

"The potentially valuable alkali metals and alkali earth metals, such as potassium, cesium, rubidium and strontium will also be assessed in more detail in this next phase of exploration. A number of these alkali metals could add strongly to the Project's overall economics once their grades and recovery techniques have been determined as part of this second phase of drilling and metallurgical reviews."

"The joint venture will be advancing the Sonora Project significantly this quarter, with the second stage of drilling planned for completion. A great deal of work is also underway on the metallurgy of the lithium bearing clays and REM looks forward to reporting these results shortly and ultimately the first preliminary economic evaluation of the Project."

Summary of the Report

 

The Report has been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and is entitled, Initial Estimate of Inferred Resources for Alkali Metals and Alkali Earth Metals - El Sauz & Fleur Concessions - Sonora Lithium Project. The lead author of the Technical Report is Carl G. Verley, P.Geo., who is a "qualified person" within the meaning of NI 43-101 and is independent of Bacanora. The Report has been filed on SEDAR and is also available for download on Bacanora's website (www.bacanoraminerals.com).

 

The Report summarizes a new alkali metal and alkali earth metal inferred resource (as initially announced by Bacanora by press release on November 25, 2013) based on analytical results obtained from pulps of core samples previously analysed in connection with the Bacanora's lithium (Li) drilling programs, which were re-analysed by ALS Global, an internationally recognized and ISO accredited laboratory, using method ME-MS811, in order to achieve better definition of alkali values above detection limits of the previous analytical method that was used in connection with Li analyses (ME-MS412).

 

The ranges of values across the clay units for selected elements, magnesium (Mg), potassium (K), rubidium (Rb), strontium (Sr) and cesium (Cs) are summarized in Table 2 below.

 

Table 2. Ranges of analyses for selected alkalis on the Concessions

 

Li ppm

K %

Rb ppm

Cs ppm

Mg %

Sr ppm

Upper Clay

41 - 6,200

0.12 - 1.75

23 - 480

34 - 1,805

0.13 - 5.21

128 - 8,380

Lower Clay

38 - >10,000

0.12 - 4.45

14- 880

68 - 3,000

0.16 - 5.52

31 - 6,820

 

The lower clay unit shows significant enrichment in alkali metals in comparison to the upper clay unit. Based on the intervals used to estimate inferred lithium resources for the Concessions (which have been declared in accordance with NI 43-101 (for a discussion of such resources, please refer to Bacanora's news release dated August 28, 2013)) at varying Li cutoffs, new inferred resources for selected alkalis have been estimated for those same intervals based on the Li cut-offs. These new inferred resources for selected alkalis are tabulated above (Table 1). Further testing will be necessary to confirm economic feasibility of recovering these elements as either co-products or by-products in a potential future mining and processing operation. Bacanora plans to initiate further metallurgical testing to determine if these elements are recoverable.).

 

Investors are cautioned that the resource estimate does not mean or imply that an economic lithium deposit exists on the Concessions. Mineral resources are not mineral reserves as they do not have demonstrated economic viability. Further testing will need to be undertaken to confirm economic feasibility.

 

Glossary of technical terms

1) ME-MS81: analytical method consists of aqua regia digestion of a 1 gram aliquot of prepared sample pulp. The resulting solution is analysed using a combination of ICP-AES and ICP-MS instruments.

2) ME-MS41: analytical method consisting of lithium borate fusion of a 1 gram aliquot of prepared sample pulp followed by acid digestion. The resulting solution is analysed by ICP-MS instrumentation

3) LCE = lithium carbonate equivalent (Li2CO3): determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3value in percent. Use of LCE is to provide data comparable with industry standards.

- Ends -

 

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEANFEFANLEEF
Date   Source Headline
17th Jun 20267:00 amRNSAzteca Execution Update
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.