Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.55
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.30 (8.824%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

EMH Cinovec PFS Update - Outstanding Results

19 Jan 2022 14:05

RNS Number : 9921Y
Cadence Minerals PLC
19 January 2022
 

Cadence Minerals Plc

 

("Cadence Minerals" or "Cadence")

 

European Metals (AIM: EMH) Cinovec PFS Update Delivers Outstanding Results.

Cadence Minerals (AIM/AQX: KDNC; OTC: KDNCY) is pleased to note that European Metals Holdings Limited ("European Metals" "EMH") has announced the results of the mining update to the 2019 Pre-Feasibility Study (2022 PFS Update), led by mining definitive feasibility study (DFS) consultant Bara Consulting, on the backfilling potential of the Cinovec mine, in which it has a 49% economic interest, in the Czech Republic.

Highlights

· The 2019 PFS Update for the Cinovec Project has been updated to demonstrate the effect of changes in the mining process to incorporate the use of paste backfill, which results in an increase in annual production, together with changes in lithium and by-product prices to reflect current and expected market conditions.

· Annual production of battery grade lithium hydroxide monohydrate modelled to increase from 25,267 tpa to 29,386 tpa, an increase of 16%.

· NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a lithium hydroxide price of USD17,000 per tonne which is significantly less than the current price.

· NPV8 (post tax) increases to over USD 3.09B with a 30% increase in the lithium hydroxide price.

· Post tax IRR of 36.3% and a payback period of 2.5 years from the commencement of production.

· Up-front capital cost due to backfilling plant and additional capital costs to produce 29,386 tpa lithium hydroxide increased to US$644m.

· This 2022 PFS Update assumes the life of mine extraction of 13.1% of the Measured and Indicated JORC Resources at Cinovec.

· Use of tailings for backfill will result in a far smaller environmental impact, further enhancing the Project's already strong ESG credentials.

The study updates the outcomes of the previously updated pre-feasibility study announced on 17 June 2019 (2019 PFS Update), for changes in the mining process as well as an increase in annual production and changes in lithium and by-product prices.

As a result of the conclusions of the study, Geomet s.r.o. (Geomet) has changed the planned mining method for the Cinovec orebody from open stoping to longhole stoping with backfill using paste backfill. This change, together with other changes to the material assumptions outlined in this update, increases the Cinovec mine's proposed ore extraction from 34.5mt up to 54.5mt, enabling an increase in the annual processing rate by approximately 33% per annum over the previous 21-year life of mine, from 1.69mtpa to 2.25mtpa over a now 25-year life of mine.

Link here for the full EMH announcement: https://www.londonstockexchange.com/news-article/EMH/pfs-update-delivers-outstanding-results/15293716 

European Metals Executive Chairman Keith Coughlan commented; " I am very pleased to report to shareholders on the completion of this 2022 PFS Update for the Cinovec Project which adds significantly to the already robust forecast economics for the project. The results of the study are very positive for the overall economics, resulting in a far greater amount of the ore resource being utilised for production of lithium and increasing the after tax NPV8 from USD1.1B to USD1.94B. The increased NPV assumes a long-term price for lithium hydroxide of US$17,000 per tonne. An increase in the lithium hydroxide price to USD 22,100 would increase the NPV8 (post tax) to over USD 3BN. Given the current price of lithium hydroxide is in the vicinity of USD 40,000 per tonne it is clear that that the Cinovec Project will be critical to European battery self-sufficiency.

"The use of approximately 54% of the plant tailings for backfill will result in a far smaller environmental impact, with much smaller dry stack tailings storage required, further enhancing the already strong ESG credentials of the Project.

"The significant increase in lithium produced will further add to the supply security of the European battery industry. Importantly, even at this increased production rate, the resource is nowhere near fully utilised - paving the way for future assessment of further production increases.

"Cinovec is strategically located in central Europe, in close proximity to the continent's vehicle manufacturers. With increasing demand for electric vehicles and the expected demands of grid storage capacity, the project is very well placed to supply the European lithium market for many decades."

Cadence CEO Kiran Morzaria added; "Our congratulations to Keith Coughlan and the European Metals team on an outstanding result at Cinovec. An increased mine life and a resource upgrade that takes the NPV8 from USD1.1bn to USD1.94bn adds substantial value to Cinovec's already exceptional potential as a future battery grade lithium supply hub for Europe and the rest of the world."

"Cadence are pleased to remain shareholders and supporters of EMH, and we look forward to further developments."

Cadence Minerals Holding in EMH following placing

In a separate announcement today, EMH stated that it had conducted a Placement at A$1.40 per CDI to raise approximately A$14.4 million. The Placement issue price represents a 0.7% premium to the Company's last traded price on 18 January 2022 (A$1.39). Following the placing, Cadence will hold approximately 8.7% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. ("Geomet"), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

Link here for the full EMH placing announcement:  https://www.londonstockexchange.com/news-article/EMH/successful-placing-to-raise-aud14-4m/15293733 

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

Darshan Patel

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFLFISLVIALIF
Date   Source Headline
9th Aug 20219:39 amRNSMacarthur Strikes Additional Rail Haulage Deal
4th Aug 20212:28 pmRNSResult of AGM
3rd Aug 20213:59 pmRNSMacarthur Gold & Copper Asset ASX listing Update
29th Jul 20217:00 amRNSPositive Operational Progress at the Amapa Project
26th Jul 20219:50 amRNSApproval of further Amapa Iron Ore Shipment
21st Jul 202111:33 amRNSMacarthur Advances Lake Giles Feasibility Study
15th Jul 20219:17 amRNSMacarthur Signs DSO Purchase Term Sheet With GWR
9th Jul 20217:00 amRNSNotice of Annual General Meeting
8th Jul 20212:45 pmRNSMacarthur Minerals Closer to DSO Export Pathway
7th Jul 20217:00 amRNSMacarthur Moonshine Geotechnical Drill Programme
30th Jun 202110:37 amRNSMacarthur: Additional Tenure for Lake Giles
30th Jun 20217:00 amRNSResults for the year ended 31 December 2020
15th Jun 20215:09 pmRNSMacarthur & Jin Sung Intl - Strategic Agreement
14th Jun 20213:08 pmRNSMacarthur subsidiary Infinity set for ASX IPO
26th May 20214:27 pmRNSMacarthur Accelerates Lake Giles Mine Planning
19th May 20212:38 pmRNSEuropean Metals - Strong Locked Cycle Test Results
10th May 20217:31 amRNSSecond Iron Ore Shipment & Amapa Project Update
30th Apr 20213:42 pmRNSIssue of Options
23rd Apr 20212:00 pmRNSExercise of Warrants
16th Apr 20219:51 amRNSMacarthur Lake Giles Project Feasibility Update
6th Apr 20214:40 pmRNSSecond Price Monitoring Extn
6th Apr 20214:35 pmRNSPrice Monitoring Extension
1st Apr 20212:05 pmRNSSecond Price Monitoring Extn
1st Apr 20212:00 pmRNSPrice Monitoring Extension
1st Apr 202110:17 amRNSFirst Amapa Iron Ore Shipment Completed & En Route
29th Mar 20217:00 amRNSFirst Iron Ore Shipment From Amapa Since 2015
26th Mar 20214:01 pmRNSMacarthur - Re Lake Giles Groundwater Drilling
23rd Mar 202110:01 amRNSMacarthur Bolsters Feasibility Study Team
16th Mar 20219:44 amRNSMacarthur Lake Giles Feasibility Study Update
15th Mar 202110:12 amRNSForm TR-1 Notification
8th Mar 20211:14 pmRNSMacarthur Spins Out Pilbara Copper-Gold Assets
25th Feb 20218:33 amRNSMacarthur - Exclusive Agreement over Mining Leases
24th Feb 202112:56 pmRNSUpdate on Yangibana and JV Partner Funding
19th Feb 20218:05 amRNSUpdate on the Amapa Iron Ore Project
18th Feb 20217:00 amRNSMacarthur - Lake Giles consultancy appointments
10th Feb 20212:05 pmRNSSecond Price Monitoring Extn
10th Feb 20212:01 pmRNSPrice Monitoring Extension
10th Feb 202111:24 amRNSBacanora starts Sonora Lithium project site works
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSUpdate on the Amapa Iron Ore Project
9th Feb 20217:00 amRNSMacarthur signs MOU with Southern Ports Authority
2nd Feb 20211:04 pmRNSEMH Cinovec Project - Drilling Update
27th Jan 20212:34 pmRNSForm TR1
12th Jan 20211:03 pmRNSExercise of Warrants
8th Jan 20217:00 amRNSResult of AGM
30th Dec 20207:00 amRNSForm TR1
23rd Dec 20202:37 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.