Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.55
Bid: 3.40
Ask: 3.70
Change: 0.05 (1.43%)
Spread: 0.30 (8.824%)
Open: 3.50
High: 3.55
Low: 3.50
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

EMH Cinovec PFS Update - Outstanding Results

19 Jan 2022 14:05

RNS Number : 9921Y
Cadence Minerals PLC
19 January 2022
 

Cadence Minerals Plc

 

("Cadence Minerals" or "Cadence")

 

European Metals (AIM: EMH) Cinovec PFS Update Delivers Outstanding Results.

Cadence Minerals (AIM/AQX: KDNC; OTC: KDNCY) is pleased to note that European Metals Holdings Limited ("European Metals" "EMH") has announced the results of the mining update to the 2019 Pre-Feasibility Study (2022 PFS Update), led by mining definitive feasibility study (DFS) consultant Bara Consulting, on the backfilling potential of the Cinovec mine, in which it has a 49% economic interest, in the Czech Republic.

Highlights

· The 2019 PFS Update for the Cinovec Project has been updated to demonstrate the effect of changes in the mining process to incorporate the use of paste backfill, which results in an increase in annual production, together with changes in lithium and by-product prices to reflect current and expected market conditions.

· Annual production of battery grade lithium hydroxide monohydrate modelled to increase from 25,267 tpa to 29,386 tpa, an increase of 16%.

· NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a lithium hydroxide price of USD17,000 per tonne which is significantly less than the current price.

· NPV8 (post tax) increases to over USD 3.09B with a 30% increase in the lithium hydroxide price.

· Post tax IRR of 36.3% and a payback period of 2.5 years from the commencement of production.

· Up-front capital cost due to backfilling plant and additional capital costs to produce 29,386 tpa lithium hydroxide increased to US$644m.

· This 2022 PFS Update assumes the life of mine extraction of 13.1% of the Measured and Indicated JORC Resources at Cinovec.

· Use of tailings for backfill will result in a far smaller environmental impact, further enhancing the Project's already strong ESG credentials.

The study updates the outcomes of the previously updated pre-feasibility study announced on 17 June 2019 (2019 PFS Update), for changes in the mining process as well as an increase in annual production and changes in lithium and by-product prices.

As a result of the conclusions of the study, Geomet s.r.o. (Geomet) has changed the planned mining method for the Cinovec orebody from open stoping to longhole stoping with backfill using paste backfill. This change, together with other changes to the material assumptions outlined in this update, increases the Cinovec mine's proposed ore extraction from 34.5mt up to 54.5mt, enabling an increase in the annual processing rate by approximately 33% per annum over the previous 21-year life of mine, from 1.69mtpa to 2.25mtpa over a now 25-year life of mine.

Link here for the full EMH announcement: https://www.londonstockexchange.com/news-article/EMH/pfs-update-delivers-outstanding-results/15293716 

European Metals Executive Chairman Keith Coughlan commented; " I am very pleased to report to shareholders on the completion of this 2022 PFS Update for the Cinovec Project which adds significantly to the already robust forecast economics for the project. The results of the study are very positive for the overall economics, resulting in a far greater amount of the ore resource being utilised for production of lithium and increasing the after tax NPV8 from USD1.1B to USD1.94B. The increased NPV assumes a long-term price for lithium hydroxide of US$17,000 per tonne. An increase in the lithium hydroxide price to USD 22,100 would increase the NPV8 (post tax) to over USD 3BN. Given the current price of lithium hydroxide is in the vicinity of USD 40,000 per tonne it is clear that that the Cinovec Project will be critical to European battery self-sufficiency.

"The use of approximately 54% of the plant tailings for backfill will result in a far smaller environmental impact, with much smaller dry stack tailings storage required, further enhancing the already strong ESG credentials of the Project.

"The significant increase in lithium produced will further add to the supply security of the European battery industry. Importantly, even at this increased production rate, the resource is nowhere near fully utilised - paving the way for future assessment of further production increases.

"Cinovec is strategically located in central Europe, in close proximity to the continent's vehicle manufacturers. With increasing demand for electric vehicles and the expected demands of grid storage capacity, the project is very well placed to supply the European lithium market for many decades."

Cadence CEO Kiran Morzaria added; "Our congratulations to Keith Coughlan and the European Metals team on an outstanding result at Cinovec. An increased mine life and a resource upgrade that takes the NPV8 from USD1.1bn to USD1.94bn adds substantial value to Cinovec's already exceptional potential as a future battery grade lithium supply hub for Europe and the rest of the world."

"Cadence are pleased to remain shareholders and supporters of EMH, and we look forward to further developments."

Cadence Minerals Holding in EMH following placing

In a separate announcement today, EMH stated that it had conducted a Placement at A$1.40 per CDI to raise approximately A$14.4 million. The Placement issue price represents a 0.7% premium to the Company's last traded price on 18 January 2022 (A$1.39). Following the placing, Cadence will hold approximately 8.7% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. ("Geomet"), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

Link here for the full EMH placing announcement:  https://www.londonstockexchange.com/news-article/EMH/successful-placing-to-raise-aud14-4m/15293733 

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

Darshan Patel

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFLFISLVIALIF
Date   Source Headline
5th Jun 20205:44 pmRNSLoan Note Conversion
5th Jun 202011:05 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
5th Jun 202010:03 amRNSAmended: Macarthur JV Partner Completes Royalty Sa
5th Jun 20207:00 amRNSMacarthur JV Partner Completes Royalty Sale
3rd Jun 20202:06 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:01 pmRNSPrice Monitoring Extension
3rd Jun 20209:31 amRNSYangibana JV Partner Agreement with Schaeffler
2nd Jun 20203:47 pmRNSHolding(s) in Company
28th May 20202:07 pmRNSMacarthur JV Partner - FIRB Approves Royalty Sale
28th May 202010:53 amRNSBacanora Sonora & Lithium Market Update
26th May 20203:47 pmRNSMacarthur Minerals JV Partner - $7m Royalty Sale
6th May 20201:44 pmRNSTotal Voting Rights and Capital
6th May 20207:00 amRNSMacarthur Lake Giles Assay Results Completed
1st May 20205:27 pmRNSPlacing Update
1st May 202011:16 amRNSAmapá Update, Placing and Loan Note Restructuring
30th Apr 20208:57 amRNSEuropean Metals Holdings - Cinovec PMP Granted
29th Apr 20204:02 pmRNSMacarthur Plans Further Exploration at Hillside
23rd Apr 202012:31 pmRNSEMH - CEZ Cinovec Investment Approved
20th Apr 20202:06 pmRNSSecond Price Monitoring Extn
20th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 20202:05 pmRNSSecond Price Monitoring Extn
17th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 202011:05 amRNSSecond Price Monitoring Extn
17th Apr 202011:00 amRNSPrice Monitoring Extension
14th Apr 202010:29 amRNSYangibana - Commonwealth Environmental Approval
14th Apr 20207:00 amRNSCourt Approval to Commence Iron Ore Shipments
27th Mar 202010:39 amRNSUpdated: EMH – CEZ to Invest in Cinovec
27th Mar 202010:13 amRNSEMH – Agreement with CEZ to Invest in Cinovec
25th Mar 20202:10 pmRNSMacarthur Minerals - JV Partner for Nickel Project
25th Mar 20207:00 amRNSMacarthur Minerals EIS Grant for Nickel Prospect
18th Mar 20204:29 pmRNSHolding(s) in Company
13th Mar 20209:36 amRNSMacarthur Minerals Lake Giles Iron Project Update
13th Mar 20207:00 amRNSPurchase of Shares by a Director
12th Mar 202011:11 amRNSUpdate on Amapa Iron Ore Project Investment
4th Mar 202012:17 pmRNSHolding(s) in Company
11th Feb 202010:11 amRNSMacarthur Minerals Encouraged by Pilbara Results
31st Jan 20202:04 pmRNSHolding(s) in Company
16th Jan 20203:35 pmRNSMacarthur Minerals Lake Giles Drilling Update
14th Jan 20205:07 pmRNSHolding(s) in Company
13th Jan 20202:40 pmRNSUpdate - Macarthur Minerals
3rd Jan 20201:23 pmRNSHolding(s) in Company
23rd Dec 20193:22 pmRNSMacarthur Minerals Secures Land at Lake Giles
11th Dec 201910:19 amRNSMacarthur Minerals Intersects High Grade Magnetite
9th Dec 20197:00 amRNSReinstatement of Railway Concessions at Amapá
27th Nov 20198:52 amRNSHastings Tech Metals Yangibana Funding Update
25th Nov 20199:28 amRNSSuccessful Bulk Ore Trial Results at Yangibana
20th Nov 20199:52 amRNSEMH & CEZ - Cinovec Partnership & Investment
11th Nov 201912:10 pmRNSBacanora Sonora Lithium Project Update
5th Nov 201910:10 amRNSMacarthur JV Partner FE Limited Commences Drilling

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.