Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Projects Update

5 Jun 2019 13:45

RNS Number : 2604B
Jubilee Metals Group PLC
05 June 2019
 

Jubilee Metals Group PLC

Registration number (4459850)

AltX share code: JBL

AIM share code: JLP

ISIN: GB0031852162

 

Dissemination of a Regulatory Announcement that contains inside information according to REGULATION (EU) No 596/2014 (MAR).

 

Jubilee Metals Group PLC

 

Projects Update

 

Jubilee Metals Group PLC ("Jubilee" or the "Company"), the AIM and AltX traded metals processing company, is pleased to provide an update on progress at its various projects in South Africa and Zambia.

 

Highlights:

 

· Successfully implementing strategy to increase production and commodity exposure to drive revenue and profitability

· PlatCro PGM (platinum and palladium dominant) processing project in South Africa, commences commissioning with 60,000 tonnes per month capacity

· Production of PGMs* expected to commence during June 2019 in tandem with Eland Platinum, adding c.30,000 PGM ounces per annum to Jubilee's production, doubling the existing annualised production capacity to c.60,000 ounces

· Acquisition of Sable Zinc Kabwe Limited in Zambia progressing well with the technical committee from the Zambian Competition and Consumer Protection Commission ("ZCCPC") issuing an approval notice for ratification

· DCM fine chrome project continues to ramp-up exceeding 3,800 tonnes of saleable chrome concentrate for May 2019 with a further ramp-up to 5,000 tonnes of chrome concentrate targeted for June 2019

 

* 6 Element Platinum Group Metals including platinum, palladium, rhodium, ruthenium, osmium and gold

 

Leon Coetzer, Jubilee Chief Executive Officer, says: "We continue to make excellent progress in implementing our strategy to build a world leading metals recovery business. Adding 30,000 ounces per annum of PGM production capacity to our existing 30,000 ounces is another huge milestone for Jubilee and should significantly impact our financial performance especially with PlatCro PGM producing in the low cost quartile. This is in addition to PlatCro Chrome operation, acquired in January 2019, which is already contributing to Company earnings ahead of projections.

 

"Alongside the positive increases in chrome and PGM processing, production at our DCM Fine Chrome project also continues to ramp up in-line with expectations. The successful commissioning of our ground-breaking fine chrome circuit is testament to the team's ability to design build and execute advanced mine waste treatment projects, to rapidly improve earnings and profitability.

 

"An important part of our on-going development strategy is to diversify earnings through adding additional projects, widening metal exposure and expanding our geographic footprint. I am therefore delighted with the official recommendation from the ZCCPC in support of our acquisition of the Kabwe zinc, lead and vanadium project in Zambia from Glencore. As a result, and to utilise time efficiently during this interim phase, we continue to finalise the process design which will allow us to hit the ground running on formal completion, targeting production in Q4 2019."

 

PlatCro operations - chrome, platinum and palladium (South Africa)

 

In addition to the chrome operation already contributing positively to the group chrome earnings and ahead of projections, Eland Platinum has commenced commissioning of its platinum recovery plant and targets production of PGMs from Jubilee's PlatCro PGM material during June 2019.

 

The project aims to process 60,000 tonnes per month of PGM rich material in partnership with Eland Platinum capable of adding an approximate further 30,000 PGM ounces per annum to Jubilee's production, potentially doubling Jubilee's existing processing capacity.

 

Kabwe operation - zinc, lead and vanadium (Zambia)

 

As previously announced on 21 March 2019, Jubilee has entered into an agreement with two subsidiaries of Glencore plc (the "Agreement") to acquire Sable Zinc Kabwe Limited (the "Sable Refinery") in Zambia (the "Acquisition").

 

Completion of the Acquisition was conditional upon the fulfilment of certain conditions precedent ("CP") as contained in the Agreement, of which the approval from the ZCCPC remains the only outstanding CP. The official recommendation in support of the Acquisition, issued by the technical committee of the ZCCPC, is a very positive step in securing an accelerated approval from the executive board of the ZCCPC.

 

During this interim phase Jubilee continues to progress the project with the finalisation of the detail process design and securing further long lead items for the implementation of the feed material's pre concentration prior to the refining of the metals at the Sable Zinc refinery. Jubilee also continues to engage with various potential suppliers of run of mine zinc rich material within the Kabwe region. The supply of such high-grade zinc material offers the potential to increase the targeted zinc units per feed ton to optimally utilise the refining capacity. 

 

DCM operation - chrome (South Africa)

The DCM fine chrome project continues to ramp-up successfully following the commissioning of the facility during Q1 2019. The project exceeded the production of 3,800 tonnes of saleable chrome concentrate for May 2019 with 5,000 tonnes of chrome concentrate targeted for June 2019. Jubilee expects to complete the production ramp-up phase by July 2019.

 

 

United Kingdom

5 June 2019

Contacts

Jubilee Metals Group PLC

Colin Bird/Leon CoetzerTel +44 (0) 20 7584 2155 / Tel +27 (0) 11 465 1913 

Nominated Adviser

SPARK Advisory Partners LimitedAndrew Emmott/Vassil KirtchevTel: +44 (0) 203 368 3555

Broker

Shard Capital Partners LLPDamon Heath/Erik WoolgarTel +44 (0) 20 7 186 9900

JSE Sponsor

Sasfin Capital (a member of the Sasfin group)

Sharon OwensTel +27 (0) 11 809 7500

Financial PR & IR Adviser

St Brides Partners Limited

 

Catherine Leftley/Juliet Earl

Tel +44 (0)20 7236 1177

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBDGDLBSGBGCU
Date   Source Headline
20th Nov 20243:15 pmRNSExercise of Warrants
12th Nov 20242:20 pmRNSResult of AGM
7th Nov 20247:00 amRNSOperational Update Q1 FY2025
6th Nov 20242:30 pmRNSTR-1: Notification of major holdings
5th Nov 20247:00 amRNSAppointment of Remuneration Committee Chairperson
31st Oct 20247:00 amRNSBoard changes
16th Oct 20247:00 amRNSIntegrated Annual Report FY2024 & Notice of AGM
7th Oct 20247:00 amRNSNotice of Full Year Results Investor Presentation
7th Oct 20247:00 amRNSProject G Acquisition and Power Update
3rd Oct 20247:00 amRNSAudited Results for the year ended 30 June 2024
23rd Sep 20247:00 amRNSCopper Projects Update
19th Sep 20247:00 amRNSManagement changes
27th Aug 20247:00 amRNSPrivate Power Purchase Agreement in Zambia
21st Aug 20247:00 amRNSOperational Update Q4 FY2024
13th Aug 20247:00 amRNSRoan Front-End Module’s First Copper Concentrate
8th Aug 20247:30 amRNSRoan Upgrade Project Commences Operations
24th Jul 20241:00 pmRNSDirector/PDMR Shareholding
23rd Jul 20247:00 amRNSDirector/PDMR Shareholding
15th Jul 20247:00 amRNSChange of Broker
24th Jun 20247:00 amRNSRoll-out of Integrated Copper Strategy in Zambia
10th Jun 20242:10 pmRNSTR-1: Notification of major holdings
3rd Jun 20248:00 amRNSExercise of Warrants and Options
23rd Apr 20247:00 amRNSAppointment of Joint Corporate Broker
18th Apr 20247:00 amRNSOperational Update Q3 FY2024
28th Mar 20247:00 amRNSProjects Update
6th Mar 20243:00 pmRNSExercise of Options
6th Mar 20247:00 amRNSChanges to the Board & New Dedicated Exec Boards
29th Feb 20247:00 amRNSInterim Results 2023 Presentation
28th Feb 20249:31 amRNSInterim Results 2023 Presentation Re-scheduled
26th Feb 20247:00 amRNSInterim Financial Report 6 months to December 2023
8th Feb 20247:00 amRNSZambia Copper Expansion Update
23rd Jan 20247:00 amRNSOperational and Projects Update Q2 FY2024
4th Jan 20243:00 pmRNSTR-1: Notification of major holdings
3rd Jan 202412:00 pmRNSResults of General Meeting
15th Dec 20231:53 pmRNSResults of Placing and Notice of General Meeting
15th Dec 20237:00 amRNSProposed Placing
13th Dec 20232:30 pmRNSReply to Shareholder Correspondence Regarding a GM
12th Dec 20237:00 amRNSInvestment in Historical Waste Rock Dump in Zambia
21st Nov 20233:30 pmRNSInvestor Webcast
17th Nov 20237:00 amRNSNew Corporate Presentation
3rd Nov 20231:30 pmRNSResult of AGM
1st Nov 20237:05 amRNSQ1 Operational Report to 30 September 2023
17th Oct 20237:00 amRNSAward of New Slag Project with Mopani Copper Mines
11th Oct 20237:00 amRNSFinal Results and Notice of AGM
5th Oct 20237:00 amRNSNotice of Results
21st Aug 20237:00 amRNSSouth Africa and Zambia Project Expansion Update
14th Aug 20237:00 amRNSAppointment of CFO and Head of Energy Metals
20th Jul 20237:00 amRNSOperational Update for full year to 30 June 2023
6th Jun 20237:00 amRNSEXPANSION OF CHROME AND PGM FOOTPRINT
4th May 20233:29 pmRNSExercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.