Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Scoping Study

6 Jun 2007 09:59

Jubilee Platinum PLC06 June 2007 Jubilee Platinum Plc ("Jubilee" or "the Company") Positive Scoping Study Completed For The Tjate Project Jubilee is pleased to announce the completion of a scoping study ("the ScopingStudy") on Tjate Platinum Corporation Pty (Ltd)'s flagship platinum group metal("PGM") Tjate property ("Tjate" or "the Project"), located in South Africa'swestern Bushveld. The Scoping Study, which was carried out over approximately 15% of the totalProject area, demonstrates robust economics, showing a positive base caseinternal rate of return of 22% for an initial investment of US$400 million. TheScoping Study scenario outlined below, one of several considered, is for astand-alone underground mine, producing annually 262,000 ounces PGMs plus gold.The mining scenario considered is for a single vertical shaft system to a depthof 1100 metres and initially mining only Merensky reef. The Scoping Study was developed in conjunction with independent consultants,Snowden Mining Industry Consultants, a member of the Snowden Group ofinternational mining consultants. Scoping Study Highlights: • Tjate mine to produce annually 262,000 oz (PGMs + gold) • Internal rate of return (IRR) of 22% after tax • Net present value (NPV) of US$292 million after tax using a discount rate of 10% • US$400 million implementation capital investment (ZAR3 billion) • Metal prices discounted over current prices • Only 15% of Tjate project area studied Key Scoping Study Assumptions: Run of mine grade 5.2 grams per tonne (g/t) 4E (platinum, palladium, rhodium & gold); 0.22% nickel; 0.13% copper Resource 34 million tonnes Milling rate 1.8 million tonnes per year Life of mine 18 years (full production) Operating cash cost US$45/tonne Implementation capital U$400 million Metal prices 4E basket US$893/oz (5% weighted average discount over current prices) Nickel US$20,000/t (40% discount) Copper US$5,000/t (67% discount) Colin Bird, CEO of Jubilee, commented, "We are delighted to have completed apositive Scoping Study for the Tjate Project, which indicates a very favourablereturn for Tjate developed as a stand-alone mine. As we now move towards thepreparation of a bankable feasibility study, engineering optimisation shouldcontinue to improve the Project's economic returns. "It is also very positive to note that this Scoping Study is based upon aresource of 34 million tonnes, representing only a small proportion (about 15%)of the total Tjate Project area. Therefore, considerable scope exists downdipof and laterally from the current resource area and we believe there to beexcellent potential for further significant production expansion." Notes to editors: The Tjate project comprises three contiguous farms, totaling 5,143 hectares inthe eastern Bushveld: namely Dsjate, Fernkloof and Quartz Hill. The farms aredowndip of Impala Platinum's operating Marula platinum mine and of AngloPlatinum's developing Twickenham platinum mine. Jubilee has recently completedthe first phase drilling of seven boreholes on the Dsjate farm. All the holes,as previously reported, intersected at targeted depths the Merensky reef and,where drilled deeper, the UG2 reef. These two reefs are the two main PGM-bearinghorizons in the Bushveld. For further information please contact: Colin Bird Cathy Malins / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel +44 (0) 20 7584 2155 Tel +44 (0) 20 7851 7480 Andrew SarosiJubilee Platinum plcTel +44 (0) 1752 221937 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Nov 20243:15 pmRNSExercise of Warrants
12th Nov 20242:20 pmRNSResult of AGM
7th Nov 20247:00 amRNSOperational Update Q1 FY2025
6th Nov 20242:30 pmRNSTR-1: Notification of major holdings
5th Nov 20247:00 amRNSAppointment of Remuneration Committee Chairperson
31st Oct 20247:00 amRNSBoard changes
16th Oct 20247:00 amRNSIntegrated Annual Report FY2024 & Notice of AGM
7th Oct 20247:00 amRNSNotice of Full Year Results Investor Presentation
7th Oct 20247:00 amRNSProject G Acquisition and Power Update
3rd Oct 20247:00 amRNSAudited Results for the year ended 30 June 2024
23rd Sep 20247:00 amRNSCopper Projects Update
19th Sep 20247:00 amRNSManagement changes
27th Aug 20247:00 amRNSPrivate Power Purchase Agreement in Zambia
21st Aug 20247:00 amRNSOperational Update Q4 FY2024
13th Aug 20247:00 amRNSRoan Front-End Module’s First Copper Concentrate
8th Aug 20247:30 amRNSRoan Upgrade Project Commences Operations
24th Jul 20241:00 pmRNSDirector/PDMR Shareholding
23rd Jul 20247:00 amRNSDirector/PDMR Shareholding
15th Jul 20247:00 amRNSChange of Broker
24th Jun 20247:00 amRNSRoll-out of Integrated Copper Strategy in Zambia
10th Jun 20242:10 pmRNSTR-1: Notification of major holdings
3rd Jun 20248:00 amRNSExercise of Warrants and Options
23rd Apr 20247:00 amRNSAppointment of Joint Corporate Broker
18th Apr 20247:00 amRNSOperational Update Q3 FY2024
28th Mar 20247:00 amRNSProjects Update
6th Mar 20243:00 pmRNSExercise of Options
6th Mar 20247:00 amRNSChanges to the Board & New Dedicated Exec Boards
29th Feb 20247:00 amRNSInterim Results 2023 Presentation
28th Feb 20249:31 amRNSInterim Results 2023 Presentation Re-scheduled
26th Feb 20247:00 amRNSInterim Financial Report 6 months to December 2023
8th Feb 20247:00 amRNSZambia Copper Expansion Update
23rd Jan 20247:00 amRNSOperational and Projects Update Q2 FY2024
4th Jan 20243:00 pmRNSTR-1: Notification of major holdings
3rd Jan 202412:00 pmRNSResults of General Meeting
15th Dec 20231:53 pmRNSResults of Placing and Notice of General Meeting
15th Dec 20237:00 amRNSProposed Placing
13th Dec 20232:30 pmRNSReply to Shareholder Correspondence Regarding a GM
12th Dec 20237:00 amRNSInvestment in Historical Waste Rock Dump in Zambia
21st Nov 20233:30 pmRNSInvestor Webcast
17th Nov 20237:00 amRNSNew Corporate Presentation
3rd Nov 20231:30 pmRNSResult of AGM
1st Nov 20237:05 amRNSQ1 Operational Report to 30 September 2023
17th Oct 20237:00 amRNSAward of New Slag Project with Mopani Copper Mines
11th Oct 20237:00 amRNSFinal Results and Notice of AGM
5th Oct 20237:00 amRNSNotice of Results
21st Aug 20237:00 amRNSSouth Africa and Zambia Project Expansion Update
14th Aug 20237:00 amRNSAppointment of CFO and Head of Energy Metals
20th Jul 20237:00 amRNSOperational Update for full year to 30 June 2023
6th Jun 20237:00 amRNSEXPANSION OF CHROME AND PGM FOOTPRINT
4th May 20233:29 pmRNSExercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.