Operational Update

31 Jul 2020 07:00

RNS Number : 6855U
Independent Oil & Gas PLC
31 July 2020
 

31 July 2020

 

Independent Oil and Gas plc

 

Operational Update

 

Independent Oil and Gas plc ("IOG" or "the Company"), (AIM: IOG.L), the development and production company focused on becoming a substantial UK gas producer, is pleased to provide an operational update for July 2020.

 

Platforms

· Fabrication of the Phase 1 Southwark and Blythe platforms continues to progress well, with a two-shift system remaining in place to manage Covid-19 restrictions

· Southwark cellar and sub-cellar decks have been fabricated and painted, with deck stacking expected early next week

· Southwark mezzanine and weather decks are on target for timely delivery by the sub-contractor, and jacket fabrication will also commence shortly

· Hydrate inhibitor tanks have been delivered and installation has commenced

· Crane pedestals have been built and delivered, and fabrication of helidecks and suction piles is also progressing well

· Formal platform contract award is expected imminently

 

SURF

· Detailed preparations for installation of Phase 1 pipelines and Elgood umbilical continue with Subsea 7 and supporting contractors

· Welding of 12-inch Blythe and 6-inch Elgood reel lay pipelines is underway at Subsea 7 spool base in Leith ahead of planned installation later this quarter

· Seabed survey for pipeline crossings completed in preparation for pipelay campaign

· 6km 24-inch pipeline extension from the Thames Pipeline to Southwark is expected to be installed in first half of 2021

· All associated regulatory consent processes ongoing, with permits for the 12-inch line being updated to align with latest crossing design and installation techniques

 

Drilling

· Competitive selection process for the jack-up rig for the five-well Phase 1 drilling programme has advanced to final post-tender technical and commercial clarifications, assisted by Petrofac

· Pre-Drill Data Packages for all wells are complete and detailed well design is progressing

· Several awards made and orders placed for critical drilling services and tangibles, and tender processes also underway for numerous others, including cementing, drilling & measurements, conductor/riser analysis, surface wellheads & trees and subsea wellhead tooling

· Pre-drill rig site survey for Elgood subsea well is underway and expected to complete this week

 

Onshore

· Engineering work and procurement is accelerating for the refurbishment of the Thames Reception Facilities ("TRF") at Bacton Gas Terminal ("BGT")

· Clean-out of the existing TRF slugcatchers is complete, with less than expected residues encountered, paving the way for full internal inspection in August

· Preparations are ongoing for tie-in activities during a scheduled BGT shutdown later this year

· Full suite of necessary commercial agreements with BGT operator Perenco UK Limited continues to be progressed

· IOG onshore team continues to optimise and adapt planned activities where necessary to work efficiently around the current Covid-19 restrictions at Bacton

 

Subsurface & Licences

· Seismic reprocessing to further improve subsurface imaging of the Vulcan Satellites area (Southwark, Nailsworth and Elland fields) is on track for completion by Q4 2020, in order to optimise field developments and well designs

· Harvey and Redwell seismic reprocessing is expected to provide updated volumetric estimates by Q4 2020, to support plans for high-return potential incremental developments

· Equivalent work on Goddard and Abbeydale assets also projected to complete in 1H 2021

· Final determination of Southwark, Blythe and Elgood fields confirmed by OGA

· Results of targeted applications for nearby blocks submitted in the 32nd UK Offshore Licence Round awaited from the Oil & Gas Authority (OGA) in due course

 

Andrew Hockey, CEO of IOG, commented: 

 

"I am pleased to provide this operational update to keep our investors informed on Phase 1 progress and wider business development. Amid the challenges of Covid-19 and the wider macroeconomic environment, the IOG team and our contractors and suppliers continue to work hard across the board to safely and efficiently execute the four key project elements - Platforms, SURF, Drilling and Onshore - and bring Phase 1 into production in Q3 2021. This in turn will catalyse our further value creation strategy, adding on higher-return incremental investments to our established infrastructure and using cost efficiencies to strengthen cash flows.

 

To that end, we are also making good progress with the seismic reprocessing work to advance our subsurface interpretations of all pre-development assets in the IOG portfolio, including Harvey, Redwell, Nailsworth, Elland, Goddard and Abbeydale. If successful, the additional nearby discovered resources that we have specifically targeted in our 32nd Round applications could also create further portfolio upside."

 

Certain information communicated in this announcement was, prior to its publication, inside information for the purposes of Article 7 of Regulation 596/2014.

Enquiries:

 

Independent Oil and Gas plc

Andrew Hockey (CEO)

Rupert Newall (CFO)

James Chance (Head of Corporate Finance & IR)

 

+44 (0) 20 7036 1400

finnCap Ltd

Christopher Raggett

Simon Hicks

 

+44 (0) 20 7220 0500

Peel Hunt LLP

Richard Crichton

David McKeown

 

+44 (0) 20 7418 8900

Vigo Communications

Patrick d'Ancona

Chris McMahon

Simon Woods

 

+44 (0) 20 7390 0230

About IOG:

 

IOG owns and operates a 50% stake in substantial low risk, high value gas reserves in the UK Southern North Sea. The Company's Core Project targets a gross 2P peak production rate of 140 MMcfe/d (c. 24,000 Boe/d) from gross 2P gas Reserves of 302 Bcfe¹ + 2C gas Contingent Resources of 108 Bcfe², via an efficient hub strategy. In addition to the independently verified 2P reserves at Blythe, Elgood, Southwark, Nailsworth and Elland and 2C Contingent Resources at Goddard, IOG also has independently verified best estimate gross unrisked prospective gas resources of 73 Bcfe² at Goddard. Alongside this IOG has management estimated mid-case recoverable gas volumes of 40 Bcfe and 100 Bcfe at the Harvey and Redwell licences and continues to pursue value accretive acquisitions to generate significant shareholder returns.

 

1ERC Equipoise Competent Persons Report: October 2017, adjusted by Management to account for updated project timing and compression

2ERC Equipoise Competent Persons Report: October 2018

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDWPUWAMUPUGBU
Date   Source Headline
16th Aug 20187:00 amRNSIssue of New Shares
9th Aug 20181:34 pmRNSHolding(s) in Company
6th Aug 20187:00 amRNSIssue of New Shares
27th Jul 20187:00 amRNSAward of Long-Term Incentive Plan
25th Jul 20187:00 amRNSAppointment of Peel Hunt as Joint-Broker
17th Jul 20187:00 amRNSPipeline Integrity Confirmation
12th Jul 20189:56 amRNSDirector Disclosure
10th Jul 20187:00 amRNSAppointment of Independent Non-Executive Director
15th Jun 201810:45 amRNSHolding(s) in Company
14th Jun 20186:00 pmRNSHolding(s) in Company
13th Jun 20182:05 pmRNSSecond Price Monitoring Extn
13th Jun 20182:00 pmRNSPrice Monitoring Extension
5th Jun 20187:00 amRNSOperational Update
25th May 20187:00 amRNSIssue of New Shares
24th May 20184:14 pmRNSHolding(s) in Company
23rd May 20183:38 pmRNSReplacement: 30th UKCS Licensing Round Awards
23rd May 20183:15 pmRNSHolding(s) in Company
23rd May 201812:56 pmRNS30th UKCS Licensing Round Awards
3rd May 20187:00 amRNSIssue of New Shares and Director Shareholding
1st May 20187:00 amRNSOperational Update
30th Apr 201812:39 pmRNSResult of AGM
26th Apr 20187:00 amRNSIssue of New Shares and Director Shareholding
19th Apr 20187:00 amRNSAppointment of Chief Operating Officer
17th Apr 20187:00 amRNSCompletion of Thames Pipeline Acquisition & Update
6th Apr 20187:00 amRNSNotice of AGM
29th Mar 20183:04 pmRNSFinal Results for the Year Ended 31 December 2017
13th Mar 201812:03 pmRNSResult of General Meeting
1st Mar 201810:06 amRNSConversion of Salaries/Fees into Share Options
1st Mar 20187:00 amRNSOperational Update
21st Feb 20187:00 amRNSCorporate and Funding Update
14th Feb 20187:45 amRNSDirectorate Change
1st Feb 20187:00 amRNSOperational Update
21st Dec 20177:00 amRNSConclusion to Skipper well creditor discussions
15th Dec 20177:03 amRNSIssue of New Shares
15th Dec 20177:00 amRNSBlythe Licence Extension
29th Nov 20177:00 amRNSTwo Year Drilling Extension at the Harvey Licence
10th Nov 20177:00 amRNSHarvey Licence Valuation Update
2nd Nov 20177:00 amRNSResults of a Competent Person's Report on Harvey
31st Oct 20177:00 amRNSVulcan Satellites FDP Submission
18th Oct 20177:00 amRNSLOI signed with Key Contractor ODE
12th Oct 20177:00 amRNSCPR Confirms Significant Reserves Upgrade
3rd Oct 20177:00 amRNSLetter of Intent Signed
29th Sep 201710:03 amRNSConversion of Salaries and Fees into Share Options
29th Sep 20177:00 amRNSInterim Results
25th Sep 20177:00 amRNSLetter of Intent Signed
13th Sep 20177:00 amRNSBoard and Management Changes
23rd Aug 20177:00 amRNSIssue of New Shares
19th Jul 20177:00 amRNSBlythe and Elgood FDP Submission
14th Jul 20177:00 amRNSAward of new licence
29th Jun 20172:00 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.