SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksIFL.L Regulatory News (IFL)

  • There is currently no data for IFL

Operations Update

12 Sep 2007 14:01

International Ferro Metals Limited12 September 2007 12 September 2007 International Ferro Metals Limited ("IFL" or "the Company") Operations and Production Update Production of ferrochrome from IFL's two furnaces has been temporarily disruptedby both the operational failure of pressure rings which hold the contact pointsagainst electrodes within the furnaces and two instances of faulty wiring in theball mill of the pelletising plant. These are expected to reduce production byup to 30,000 tonnes in the financial year ending 30 June 2008. Electrode Pressure Rings Following a trend of faults during the ramp-up and early operational stage,indicating similarities between a number of pressure ring failures, a Professorof Metallurgy from the University of Pretoria was appointed by IFL to review thefailure events and to advise as to the most efficient remedial action. Initial findings indicate that these failures could be due to design faults. Allpressure rings in both the furnaces will need to be systematically replaced assoon as new redesigned pressure rings are available. The lead time forfabrication of replacement pressure rings prevents a complete single change overto new pressure rings. Therefore, it is planned to take a staged approach, andto the extent possible, change the pressure rings during planned maintenancecycles which will leave one furnace operating during the remediation period andminimise production disruptions. IFL is seeking to ensure all pressure rings arereplaced by end of January 2008. IFL will seek to recover the capital cost of remedying these problems from thecontractor responsible for design and installation of the electrode mechanism.The contractor is committed to rectifying these problems as soon as possible. Gear Box Faulty Wiring IFL has also identified that incorrect wiring of control mechanisms within theball mill gear box of the pelletising plant has caused overheating and thesubsequent failure of bearings. A temporary replacement gear box has beeninstalled allowing the plant to operate at reduced capacity resulting in areduction of ferro chrome production. It is expected that installation of a new gearbox and other rectification workwill take up to five weeks and will be completed during October 2007. In themeantime IFL will seek to minimise disruption to production by using its lumpyore for its furnaces. The failure of the gear box is under investigation and the contractorresponsible for construction of the pelletising plant has been notified that IFLintends to seek recovery of costs and damages from this failure. Production Outlook IFL expects that remedying these faults, will involve furnace down time outsidethat previously anticipated as routine maintenance. The consequential loss ofproduction may be up to 30,000 tonnes through the rectification period to 31January 2008. Each of the other components of IFL's integrated ferro chrome facility isoperating at capacity and IFL's management has no reason to anticipate thesmelter will not resume production at the rate of 267,000 tpa of ferro chrome bythe end of January 2008. On that basis, IFL expects production for the yearending 30 June 2008 to total about 237,000 tonnes, which could reduce IFL'sproduction and revenues for the year ending 30 June 2008 by approximately 11%. Production in the period to 30 June 2007 totalled 49,000 tonnes, represented bysales of 36,000 tonnes and finished product committed to sales contracts but notshipped of 13,000 tonnes due to the rescheduling of shipping. Stephen Turner, Managing Director of International Ferro Metals commented "Whileour management team is very disappointed at these two unforeseen plant failureswe are confident that effective remedial action is being taken. It is notenvisaged that this disruption to production will impact upon the timing of theproposed expansion of ferrochrome production capacity to 665,000 tonnes perannum. The stainless steel market remains strong as does that for its key ingredientferro chrome. Prices for ferro chrome remain at a long term high with strongdemand and low industry stock piles. The IFL plant is forecast to revert toproducing at the rate of 267,000 tpa of ferro chrome following the replacementof the pressure rings within each furnace." ENDS For more information contact: International Ferro Metals LimitedStephen Turner, Managing DirectorMob: +61 418 440 844www.ifml.com Brunswick GroupCarole CableTel: 020 7404 5959 Numis Securities LimitedJohn HarrisonTel: 020 7260 1000 Notes to editors:International Ferro Metals is a ferrochrome producer that has recently commencedshipments from its integrated chromite mine and ferrochrome processingoperations in South Africa for use in the global stainless steel industry. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Jan 20107:00 amRNSProduction Report
12th Nov 20097:01 amRNSAGM Statement
12th Nov 20097:01 amRNSResult of AGM
12th Nov 20097:00 amRNSInterim Management Statement
6th Nov 20098:28 amRNSNotification of IMS
5th Nov 200912:17 pmRNSDirector not seeking re-election
20th Oct 20099:17 amRNSNotice of AGM
14th Sep 20097:00 amRNSFinal Results
1st Sep 20094:20 pmRNSTotal Voting Rights
28th Aug 20091:26 pmRNSNotice of Results
4th Aug 20098:10 amRNSDirector/PDMR Shareholding
3rd Aug 20097:00 amRNSPlacing of New Ordinary Shares
23rd Jul 20097:00 amRNSIFM Furnace Restart
17th Jul 20097:00 amRNSProduction Report
7th Jul 20099:48 amRNSNotification of Production Report
20th May 20097:00 amRNSIMS and Production Report to 31 March 2009
28th Apr 20097:00 amRNSBEE Transaction
31st Mar 20097:00 amRNSSingle furnace restart, job losses, pay cuts
23rd Feb 20097:00 amRNSInterim Results
10th Feb 20097:00 amRNSNotice of Results
26th Jan 20097:00 amRNSTrading Update
23rd Jan 20094:21 pmRNSForthcoming Trading Statement
22nd Jan 20097:00 amRNSOperations Update
31st Dec 20087:00 amRNSDirectorate Change
30th Dec 200811:17 amRNSReview of Remuneration Policies
24th Dec 200812:42 pmRNSSecond Price Monitoring Extn
24th Dec 200812:37 pmRNSPrice Monitoring Extension
5th Dec 20084:27 pmRNSChange in Director Shareholdings
25th Nov 20087:00 amRNSSuspension of production and reduction in sales
12th Nov 20087:00 amRNSInterim Management Statement and Results of AGM
27th Oct 20087:00 amRNSPurchase of Shares in Buyback Programme
24th Oct 200811:38 amRNSNotice of AGM
17th Oct 20087:00 amRNSPurchase of Shares in Buyback Programme
16th Oct 20087:00 amRNSPurchase of Shares in Buyback Programme
15th Oct 20087:00 amRNSAnnual Information Update
13th Oct 20084:40 pmRNSPrice Monitoring Extension
9th Oct 20087:00 amRNSPurchase of Shares in Buyback Programme
7th Oct 20087:00 amRNSPurchase of Shares in Buyback Programme
23rd Sep 200811:42 amRNSHolding(s) in Company
22nd Sep 20087:00 amRNSFinal Results
17th Jul 200812:56 pmRNSChange to the Board of Direct
10th Jul 20087:00 amRNSProduction Report
17th Jun 20082:26 pmRNSNotification of Major Interes
9th Jun 20087:00 amRNSIssue of Equity
30th May 200810:57 amRNSDirector/PDMR Shareholding
30th May 200810:57 amRNSDirector/PDMR Shareholding
30th May 200810:57 amRNSDirector/PDMR Shareholding
30th May 200810:57 amRNSDirector/PDMR Shareholding
19th May 20087:00 amRNSInterim Management Statement
6th May 20087:02 amRNSNotice of IMS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.