SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksIFL.L Regulatory News (IFL)

  • There is currently no data for IFL

Operations Update

12 Sep 2007 14:01

International Ferro Metals Limited12 September 2007 12 September 2007 International Ferro Metals Limited ("IFL" or "the Company") Operations and Production Update Production of ferrochrome from IFL's two furnaces has been temporarily disruptedby both the operational failure of pressure rings which hold the contact pointsagainst electrodes within the furnaces and two instances of faulty wiring in theball mill of the pelletising plant. These are expected to reduce production byup to 30,000 tonnes in the financial year ending 30 June 2008. Electrode Pressure Rings Following a trend of faults during the ramp-up and early operational stage,indicating similarities between a number of pressure ring failures, a Professorof Metallurgy from the University of Pretoria was appointed by IFL to review thefailure events and to advise as to the most efficient remedial action. Initial findings indicate that these failures could be due to design faults. Allpressure rings in both the furnaces will need to be systematically replaced assoon as new redesigned pressure rings are available. The lead time forfabrication of replacement pressure rings prevents a complete single change overto new pressure rings. Therefore, it is planned to take a staged approach, andto the extent possible, change the pressure rings during planned maintenancecycles which will leave one furnace operating during the remediation period andminimise production disruptions. IFL is seeking to ensure all pressure rings arereplaced by end of January 2008. IFL will seek to recover the capital cost of remedying these problems from thecontractor responsible for design and installation of the electrode mechanism.The contractor is committed to rectifying these problems as soon as possible. Gear Box Faulty Wiring IFL has also identified that incorrect wiring of control mechanisms within theball mill gear box of the pelletising plant has caused overheating and thesubsequent failure of bearings. A temporary replacement gear box has beeninstalled allowing the plant to operate at reduced capacity resulting in areduction of ferro chrome production. It is expected that installation of a new gearbox and other rectification workwill take up to five weeks and will be completed during October 2007. In themeantime IFL will seek to minimise disruption to production by using its lumpyore for its furnaces. The failure of the gear box is under investigation and the contractorresponsible for construction of the pelletising plant has been notified that IFLintends to seek recovery of costs and damages from this failure. Production Outlook IFL expects that remedying these faults, will involve furnace down time outsidethat previously anticipated as routine maintenance. The consequential loss ofproduction may be up to 30,000 tonnes through the rectification period to 31January 2008. Each of the other components of IFL's integrated ferro chrome facility isoperating at capacity and IFL's management has no reason to anticipate thesmelter will not resume production at the rate of 267,000 tpa of ferro chrome bythe end of January 2008. On that basis, IFL expects production for the yearending 30 June 2008 to total about 237,000 tonnes, which could reduce IFL'sproduction and revenues for the year ending 30 June 2008 by approximately 11%. Production in the period to 30 June 2007 totalled 49,000 tonnes, represented bysales of 36,000 tonnes and finished product committed to sales contracts but notshipped of 13,000 tonnes due to the rescheduling of shipping. Stephen Turner, Managing Director of International Ferro Metals commented "Whileour management team is very disappointed at these two unforeseen plant failureswe are confident that effective remedial action is being taken. It is notenvisaged that this disruption to production will impact upon the timing of theproposed expansion of ferrochrome production capacity to 665,000 tonnes perannum. The stainless steel market remains strong as does that for its key ingredientferro chrome. Prices for ferro chrome remain at a long term high with strongdemand and low industry stock piles. The IFL plant is forecast to revert toproducing at the rate of 267,000 tpa of ferro chrome following the replacementof the pressure rings within each furnace." ENDS For more information contact: International Ferro Metals LimitedStephen Turner, Managing DirectorMob: +61 418 440 844www.ifml.com Brunswick GroupCarole CableTel: 020 7404 5959 Numis Securities LimitedJohn HarrisonTel: 020 7260 1000 Notes to editors:International Ferro Metals is a ferrochrome producer that has recently commencedshipments from its integrated chromite mine and ferrochrome processingoperations in South Africa for use in the global stainless steel industry. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Dec 20114:41 pmRNSSecond Price Monitoring Extn
1st Dec 20114:35 pmRNSPrice Monitoring Extension
23rd Nov 20118:07 amRNSRESOLUTIONS PASSED AT AGM HELD ON 23 NOVEMBER 11
23rd Nov 20117:00 amRNSChairman's Address at the 2011 AGM
3rd Nov 20111:00 pmRNSUpdated Explanatory Memorandum
2nd Nov 20114:40 pmRNSSecond Price Monitoring Extn
2nd Nov 20114:35 pmRNSPrice Monitoring Extension
26th Oct 20112:00 pmRNSNotice of AGM
25th Oct 20117:00 amRNSInterim Management Statement and Production Report
20th Oct 201112:23 pmRNSNotification of Interim Management Statement
23rd Sep 20114:40 pmRNSSecond Price Monitoring Extn
23rd Sep 20114:35 pmRNSPrice Monitoring Extension
19th Sep 20117:00 amRNSFinancial Results for the year to 30 June 2011
15th Sep 20114:35 pmRNSPrice Monitoring Extension
12th Sep 20117:00 amRNSOperations Update
5th Sep 20117:00 amRNSNotification of Final Results
17th Aug 20114:40 pmRNSSecond Price Monitoring Extn
17th Aug 20114:35 pmRNSPrice Monitoring Extension
16th Aug 20114:40 pmRNSSecond Price Monitoring Extn
16th Aug 20114:35 pmRNSPrice Monitoring Extension
8th Aug 20117:00 amRNSOperational Update
19th Jul 20117:00 amRNSIMS & Production Report
4th Jul 20113:50 pmRNSDealing in shares
30th Jun 20118:18 amRNSDirector's dealing in shares
28th Jun 20117:00 amRNSOperations Update
22nd Jun 201110:52 amRNSDirector's Dealing in Shares
21st Jun 20113:42 pmRNSDirectors' Dealing in Shares
6th Jun 20117:00 amRNSChristiaan Jordaan Appointed CEO
20th Apr 20117:00 amRNSInterim Management Statement and Production Report
16th Mar 20119:28 amRNSDirector's dealing in shares
4th Mar 201110:34 amRNSDirector's dealing in shares
23rd Feb 20113:11 pmRNSDirector's dealing in shares
21st Feb 20117:00 amRNSInterim Results for half year to 31 December 2010
9th Feb 20117:00 amRNSNotification of Interim Financial Results
25th Jan 20117:00 amRNSIMS and Production Report
18th Jan 20113:10 pmRNSOperational Update
24th Nov 201012:15 pmRNSResolutions Passed at Annual General Meeting
24th Nov 20107:00 amRNSChairman's Address at the 2010 AGM
15th Nov 20107:00 amRNSIMS and Production Report
5th Nov 201010:04 amRNSAgreement signed with Phoenix Platinum Mining
27th Oct 201011:48 amRNSNotice of AGM
27th Sep 20105:22 pmRNSDirector's dealing in shares
27th Sep 20107:00 amRNSFinal Results
20th Jul 20107:00 amRNSQ4 Production Report
6th May 20108:18 amRNSProposed changes to Australian tax regime
27th Apr 20107:00 amRNSInterim Management Statement
18th Mar 20107:36 amRNSAppointment of new Board Director
9th Mar 201010:33 amRNSBoard Appointment
23rd Feb 20107:00 amRNSInterim Financial Results
17th Feb 20107:00 amRNSAgreement with Anglo Platinum for chromite supply

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.