We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHorizonte Minerals Regulatory News (HZM)

Share Price Information for Horizonte Minerals (HZM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.425
Bid: 0.40
Ask: 0.45
Change: -0.025 (-5.56%)
Spread: 0.05 (12.50%)
Open: 0.425
High: 0.425
Low: 0.425
Prev. Close: 0.45
HZM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary Metallurgical Testwork at Araguaia

6 Mar 2012 07:00

RNS Number : 7277Y
Horizonte Minerals PLC
06 March 2012
 



Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining

 

NEWS RELEASE

6 MARCH, 2012

 

POSITIVE RESULTS FROM PRELIMINARY

METALLURIGICAL TESTWORK ON THE ARAGUAIA NICKEL PROJECT, BRAZIL

_____________________________________________________________________

 

Horizonte Minerals plc, (TSX:HZM, AIM:HZM) ('Horizonte' or 'the Company') the exploration and development company focused in Brazil,is pleased to announce positive results from the preliminary metallurgical testwork, from both pyrometallurgical and hydrometallurgical testing, for its flagship 100% owned Araguaia Nickel Project ('Araguaia') located south of the Carajás Mineral District of Northern Brazil.

 

Highlights:

 

Pyrometallurgy

 

·; Commercial grade of ferronickel produced in laboratory smelting tests on two ore blends (35.3% nickel to 40.5% nickel)

·; High nickel recoveries in laboratory tests (94.4% to 96.1%)

 

Hydrometallurgy

 

·; Atmospheric tank leach ('ATL') tests achieved up to 89% nickel extraction and up to 93% cobalt extraction in 4 hours on ore blend samples

·; Acid consumption for the ATL laboratory tests ranged from 506 - 752 kg/tonne

·; Bottle roll leach ('BRL') tests achieved up to 89% nickel extraction and 92% cobalt extraction on ore blend samples

·; Acid consumption for the BRL laboratory tests on ore blend samples ranged from 651 - 729 kg/tonne

 

Horizonte CEO Jeremy Martin said, "The completion of the initial phase of metallurgical test work is a significant milestone at Araguaia with both process routes returning positive results, which is an excellent outcome. The mineral resources on the project are saprolite and transition dominated, which combined with the good infrastructure and low cost hydroelectric power in the district made the tried and tested pyrometallurgical route a key process option. Today in Brazil there are 4 plants producing ferronickel via the pryometallurgical route, the most recent of these is Anglo American's Barro Alto project that started nickel production in March 2011. The results returned from our initial pyrometallurgical tests showed that it is possible to produce ferronickel with grades ranging from 35.3% nickel to 40.5% nickel with good overall recovery rates. A ferronickel product within this grade range can be sold directly to stainless steel producers.

 

"In parallel hydrometallurgical test work was undertaken focused on Atmospheric Tank Leach (ATL) and Bottle Roll Leach (BRL) as a precursor test for atmospheric heap leaching. Sulphuric acid was used on both types of leaching tests. The results from the ATL tests were positive showing that there are high nickel recoveries up to 89% with moderate acid consumption and the BRL tests also indicated good nickel recoveries.

 

"The completion of the preliminary metallurgical testwork is a major step in de-risking the project, we are now able to demonstrate two process routes that with additional testing are potentially suitable for commercial production. Shortly we will be awarding the contract for the Phase 2 pyrometallurgical test work to run a pilot plant of approximately 100 tonnes of ore on a continuous feed basis. I look forward to updating shareholders as we advance this work."

 

Further Details

 

Pyrometallurgy

 

The pyrometallurgical test programme was undertaken at the laboratories of Xstrata Process Support ('XPS') in Sudbury, Ontario, Canada.

 

This test programme examined the pyrometallurgical smelting performance of laterite ore from the Araguaia Nickel Project. For the programme, samples of the limonite, transition and saprolite zones were submitted to XPS. The results of chemical analysis on the samples of these materials dried at 1050C showed the following results:

 

 

Chemical assays on ore materials sent to XPS

 

Sample

Ni

Co

Fe

SiO2

MgO

Al2O3

Limonite

1.23

.21

37.9

18.10

2.70

8.3

Transition

1.76

0.064

18.8

42.78

9.73

5.25

Saprolite

1.61

0.04

10.3

42.14

18.41

8.13

 

The following blends, considered representative of the combined Pequizeiro and Baião deposits at a 1% nickel cut-off, were made up at XPS. Blend 1 is representative of the entire blended ore zones, while Blend 2 represents the blend of the transition and saprolite zones only.

 

 

Blend

Proportion, %

Limonite

Transition

Saprolite

Blend 1

15

45

40

Blend 2

0

53

47

 

After calcining at 9000C, smelting tests were carried out at 1,5200C with varying amounts of reductant. It was found that ferronickel alloy having grades between 21.9% Ni and 40.5 % Ni could be produced from the transition and saprolite materials, with the Ni recovery ranging from 94.4% to 97.6%. Further, the tests showed that in the case of Blend 1, a ferronickel product averaging 34.1% Ni could be produced at an average Ni recovery of 95.1%, while in the case of Blend 2, ferronickel grading 35.3% Ni could be produced, with a Ni recovery of 96.1%. Material grading 35% Ni is a sought after grade of ferronickel by stainless steel producers.

 

Horizonte ores have a high SiO2/MgO ratio, in a similar range as that found at the BHP Billiton Cerro Matoso ferronickel operation. The XPS study also developed a Metsim model of a potential reduction/smelting process for the Araguaia ore and found that the energy requirements for Horizonte will be similar to published data for laterite smelting.

 

Hydrometallurgy

 

The preliminary hydrometallurgical testwork was undertaken at the Wardell-Armstrong International ('WAI') test laboratories at Wheal Jane, Cornwall, UK. Two separate approaches to hydrometallurgical processing were tested, Atmospheric Tank Leaching and Bottle Roll Tests aimed at a preliminary investigation for Heap Leaching. Sulphuric acid was selected for both types of leaching tests.

 

Atmospheric Tank Leach Tests

 

Preliminary atmospheric tank leach tests were undertaken under different test conditions to investigate the leachability of Araguaia blended ore with respect to the effect of particle size, solid/liquid ratio, acid strength, leaching temperature, leach time on metal recoveries and acid consumptions. A composite feed ore blend consisting of 15% limonite, 45% transition and 40% saprolite core drill samples was used to carry out the 21 batch tests.

 

The batch tests clearly established that Araguaia laterite ore was leachable in tanks with promising results. Nickel leach rates were encouraging with up to 65% of nickel extracted within the first hour and 89% extraction achieved in 4 hours leaching. Ranges of 70-89% recovery for nickel and 68-93% recovery for cobalt, with acid consumptions of 500 - 750 kg/t, were achieved in 16 of the 21 tests.

 

The results of a selection of the tests based on assays of the solids are tabulated below:

 

 

TEST ID

Ore size (µm)

S/L Ratio

Acid Strength (wt %)

Leach Temp. (0C)

Leach Time (hr)

Ni Recovery (%)

Co Recovery (%)

Acid Cons. (kg/t)

Acid Cons. (kg/kg Ni)

Base Test 1

-75

1/3

80

80

4

80.8%

87.3%

644

51

ATL 1

-1000

1/3

80

80

4

79.4%

82.5%

658

54

ATL 2

-500

1/3

80

80

4

81.3%

85.4%

640

51

ATL 3

-150

1/3

80

80

4

83.3%

86.7%

667

51

ATL 5

-75

1/2

80

80

4

71.7%

75.3%

731

65

ATL 10

-75

1/3

60

80

4

70.9%

68.3%

506

45

ATL 12

-75

1/3

100

80

4

89.1%

93.1%

752

54

 

 

Bottle Roll Leach Tests

 

Sixteen Bottle Roll tests were performed at WAI test laboratories using separate limonite, transition and saprolite samples as well as a composite ore blend. The tests were carried out under atmospheric pressure and ambient temperature. Solid/liquid ratio was 1:10 using 150 grams of feed ore for each test. Two ore sizes: 6.35 and 3.35 mm and two acid concentrations: 75 and 100 g/L were tested for each type of ore.

 

At the end of 91 days leaching, the transition and saprolite samples produced nickel recoveries in excess of 85% and the composite feed ore blend generated nickel recoveries in the order of 85-90%. As was expected, nickel recoveries for the pure limonite samples were lower (51%). Acid consumptions varied in the range of 400-800 kg/t ore for different ore types and test conditions.

 

Tabulated results for 10 of the tests based on solid analysis are given below

Test ID

Description

Leach Days

Ni Recovery %

Co Recovery %

Acid Cons. (kg/t)

Acid Cons. (kg/kg Ni)

BRT 1

Lim - 3.35 - 75 gpL

91

49%

27%

403

68

BRT 2

Lim - 3.35 - 100 gpL

91

52%

27%

447

72

BRT 5

Sap - 3.35 - 75 gpL

91

86%

89%

742

54

BRT 6

Sap - 3.35 - 100 gpL

91

87%

86%

878

64

BRT 9

Tra - 3.35 - 75 gpL

91

81%

55%

640

48

BRT 10

Tra - 3.35 - 100 gpL

91

88%

64%

654

45

BRT 13

Blend - 3.35 - 75 gpL

91

81%

83%

720

56

BRT 14

Blend - 3.35 - 100 gpL

91

89%

92%

770

54

BRT 15

Blend - 6.35 - 75 gpL

91

85%

87%

651

48

BRT 16

Blend - 6.35 - 100 gpL

91

89%

89%

729

51

 

Metallurgical testing of Horizonte's laterite deposits continues, with a planned test programme, about to commence shortly, aimed to test the upgrading of the Ni level in ore samples using a variety of new, advanced upgrading technologies.

 

Dr. Phillip Mackey P.Eng., Ph.D., FCIM, is the Qualified Person as defined by NI 43-101 for the metallurgical testing programme on the Araguaia Nickel Project. Dr. Mackey has reviewed and approved the contents of this news release as it relates to the results of the preliminary metallurgical testing programme.

 

**ENDS**

 

For further information visit www.horizonteminerals.com or contact:

 

Jeremy Martin

Horizonte Minerals plc

Tel: +44 (0) 20 7763 7157

David Hall

Horizonte Minerals plc

Tel: +44 (0) 20 7763 7157

Dominic Morley

Panmure Gordon (UK) Limited

(Nomad and Broker)

Tel: +44 (0) 20 7459 3600

Joanna Weaving

Finncap Ltd (Joint Broker)

Tel: +44 (0) 20 7600 1658

Felicity Edwards

St Brides Media & Finance Ltd (PR)

Tel: +44 (0) 20 7236 1177

Sebastian de Kloet

Horizonte Minerals plc

Canadian Investor Relations

Tel: 1-416-970-5277

 

About Horizonte Minerals:

Horizonte Minerals plc is an AIM and TSX listed exploration and development Company with a portfolio of nickel and gold projects in the Carajas District of Brazil. The Company is focused on creating value by generating and rapidly advancing exploration projects in tandem with joint ventures with major mining companies, providing mid-term cash flow, which is then used to develop the business and pipeline projects.

 

Horizonte has two committed major mining partners: Teck Resources Limited, a major strategic shareholder in the Company, and AngloGold Ashanti Limited, a JV partner on the gold portfolio.

 

Horizonte owns 100 per cent of the advanced Araguaia nickel project located to the south of the Carajas mineral district of northern Brazil.; the project has the potential to deliver a resource with size and grades comparable to other world-class projects in northern Brazil.

 

In addition, Horizonte and AngloGold Ashanti have a US$5.3 million exploration alliance to generate and develop new and existing gold targets within two areas of Brazil and a further JV with the major whereby AngloGold Ashanti can earn into 51% of the Falcao gold project by expending US$4.5 million over three years with the right to earn a further 19% by taking the project to Pre-feasibility Study.

 

Horizonte is well funded to accelerate the development of its core projects.

 

CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION

Except for statements of historical fact relating to the Company, certain information contained in this press release constitutes "forward-looking information" under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the potential of the Company's current or future property mineral projects; the success of exploration and mining activities; cost and timing of future exploration, production and development; the estimation of mineral resources and reserves and the ability of the Company to achieve its goals in respect of growing its mineral resources; and the realization of mineral resource and reserve estimates. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, and are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to risks related to: exploration and mining risks, competition from competitors with greater capital; the Company's lack of experience with respect to development-stage mining operations; fluctuations in metal prices; uninsured risks; environmental and other regulatory requirements; exploration, mining and other licences; the Company's future payment obligations; potential disputes with respect to the Company's title to, and the area of, its mining concessions; the Company's dependence on its ability to obtain sufficient financing in the future; the Company's dependence on its relationships with third parties; the Company's joint ventures; the potential of currency fluctuations and political or economic instability in countries in which the Company operates; currency exchange fluctuations; the Company's ability to manage its growth effectively; the trading market for the ordinary shares of the Company; uncertainty with respect to the Company's plans to continue to develop its operations and new projects; the Company's dependence on key personnel; possible conflicts of interest of directors and officers of the Company, and various risks associated with the legal and regulatory framework within which the Company operates.

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFFDVVIEIIF
Date   Source Headline
15th Apr 20247:00 amRNSCorporate Update
2nd Apr 20247:00 amRNSCorporate Update
28th Mar 20241:39 pmRNSCorporate Update
14th Mar 20244:40 pmRNSAraguaia Project Update
1st Mar 20247:00 amRNSCorporate Update
23rd Feb 202410:52 amRNSHolding(s) in Company
19th Feb 20244:53 pmRNSUpdated Capex and Schedule Estimate
18th Jan 20244:57 pmRNSAPPOINTMENT OF NICHOLAS MICHAEL TO THE BOARD
10th Jan 20245:35 pmRNSTR-1: Standard notification of major holdings
27th Dec 20237:00 amRNSINTERIM US$20M FUNDING PACKAGE SIGNED
19th Dec 20232:32 pmRNSARAGUAIA PROJECT UPDATE
18th Dec 20235:55 pmRNSAPPOINTMENT OF BOARD MEMBERS
27th Nov 20237:00 amRNSBOARD AND MANAGEMENT CHANGES
14th Nov 20238:02 amRNSARAGUAIA PROJECT UPDATE
23rd Oct 20237:00 amRNSQ3 2023 Construction Update
12th Oct 20237:00 amRNSHolding(s) in Company
5th Oct 20237:00 amRNSHolding(s) in Company
2nd Oct 20237:00 amRNSUpdate on Araguaia Nickel Project Construction
14th Sep 20231:00 pmRNSEXERCISE OF OPTIONS AND TOTAL VOTING RIGHTS
12th Sep 20237:00 amRNSPASSING OF FORMER CHAIR AND CO-FOUNDER
24th Aug 20237:00 amRNSOperations Director Appointed for Araguaia Project
17th Aug 20237:00 amRNSInterim Financial Results
3rd Aug 20237:00 amRNSQ2 2023 Araguaia Construction Update
2nd Aug 20237:00 amRNSNotice of Investor Presentation
27th Jul 20233:00 pmRNSExercise of Options and Total Voting Rights
25th Jul 20237:00 amRNSAPPOINTMENT OF JOINT CORPORATE BROKER
13th Jul 20237:00 amRNSAward of Options
11th Jul 20237:00 amRNSBoard Appointments
7th Jul 202311:03 amRNSHolding(s) in Company
6th Jul 20237:00 amRNSMINING APPROVAL RECEIVED FOR ARAGUAIA
29th Jun 20237:00 amRNSDELIVERY OF ROTARY KILN
15th Jun 20237:00 amRNSAraguaia Nickel Project Pictorial Update
24th May 20234:37 pmRNSResult of AGM
24th May 20237:00 amRNSHORIZONTE MINERALS PLC 2022 SUSTAINABILITY REPORT
23rd May 20234:05 pmRNSTR-1: Notification of Major Holdings
23rd May 20234:01 pmRNSTR-1: Notification of Major Holdings
28th Apr 20237:00 amRNSNotice of AGM
24th Apr 20237:00 amRNSAraguaia Construction Update
19th Apr 20237:00 amRNSNotice of Investor Presentation
31st Mar 20234:07 pmRNSExercise of Options and Total Voting Rights
29th Mar 20237:00 amRNSFINAL RESULTS FOR THE YEAR ENDED 31 DECEMBER 2022
6th Mar 20237:00 amRNSAraguaia Line2 Feasibility Study Contracts Awarded
27th Feb 20237:00 amRNSSecond drawdown complete
24th Feb 20239:04 amRNSTR-1: Notification of Major Holdings
16th Feb 20237:00 amRNSHORIZONTE MINERALS PICTORIAL UPDATE
9th Feb 20237:00 amRNSMining Services Contract Awarded for Araguaia
8th Feb 20234:31 pmRNSTR-1: Notification of Major Holdings
24th Jan 20237:00 amRNSVermelho Nickel Cobalt Project EIA Submitted
21st Dec 20227:00 amRNSDirector/PDMR Shareholding
15th Dec 20227:00 amRNSAraguaia remains on Schedule and on Budget

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.