PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHummingbird Regulatory News (HUM)

Share Price Information for Hummingbird (HUM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 10.25
Bid: 10.00
Ask: 10.50
Change: 0.85 (9.04%)
Spread: 0.50 (5.00%)
Open: 9.70
High: 11.00
Low: 9.70
Prev. Close: 9.40
HUM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Preliminary Assessment of HEP in Liberia

16 Sep 2015 07:00

RNS Number : 1232Z
Hummingbird Resources PLC
16 September 2015
 

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

16 September 2015

Hummingbird Resources plc ("Hummingbird Resources" or "the Company")

Receives Positive Preliminary Assessment of

Hydro-Electric Power Plant in Liberia

 

Hummingbird Resources, the multi-project gold company, is pleased to announce a positive preliminary report from Knight Piesold Consulting ("KP") for the proposed hydro-electric power ("HEP") plant in south-east Liberia, ±10km from Hummingbird's 4.2Moz Dugbe Gold Project.

 

This significant development follows the signature of a Collaboration Agreement for the funding and development of the HEP signed in April 2015 with IFC InfraVentures, the IFC Global Infrastructure Project Development Fund, and Aldwych International, a leading energy company active in the growing economies of Africa.

 

Highlights

· Report demonstrates a range of hydropower options that would be highly beneficial in the development of a sustainable and low-cost source of power for the Dugbe Gold Project, as well as the south-east Liberian region

· Assessed four run-of-river hydropower options ranging from 15MW to 30MW with varying intakes

· A hydropower development on the Dugbe River represents a legacy asset that will benefit the region by providing low cost renewable energy long after mine closure to the communities in the region

· Pre-Feasibility Assessment will be finalised on completion of additional hydrological studies and topographic mapping (satellite survey) - targeting final report in Q2 2016

· Pre-Feasibility Study funded (circa US$265,000) by IFC InfraVentures as part of the Collaboration Agreement

 

Dan Betts, CEO of Hummingbird Resources, said: "We are highly encouraged by the preliminary study for the development of a HEP plant in south-eastern Liberia which, if developed, will enable a sustainable and low-cost source of power for our Dugbe Gold Project and secure a source of domestic power supply for the local region. With the Pre-Feasibility study being fully funded by IFC InfraVentures, Hummingbird is ideally positioned to capitalise on the HEP development whilst mitigating risk and capital exposure. We also believe the HEP scheme will create a catalyst for growth in the region and provide a significant potential operating cost saving for the development of the Dugbe Gold Project."

 

Further Information

 

The Company is considering the development of a run-of-river (ROR) hydroelectric facility to support the development and operation of its Dugbe mining operation in the south-west region of Liberia. Hummingbird has instructed KP to conduct a Pre-Feasibility assessment of the potential hydropower development on the Dugbe River and its major tributaries. The Pre-Feasibility report has been issued in draft form, as a preliminary assessment of the project's viability and it will be updated in final form once additional hydrological studies and topographic mapping (satellite survey) have been completed.

 

The previous desktop HEP scoping study considered an operational mine power demand of 30 MW. However, the updated average power demand for the Dugbe Gold Project is forecast at 16 MW but with additional capacity for the local region to address the expected peak demands of 20 to 30 MW. KP has therefore assessed a range of hydropower project alternatives, including:

 

· Alternative 1 - 30 MW project with 3 intakes, on Dugbe River, Botou River and Geebo Creek

· Alternative 2 - 25 MW project with 2 intakes on Dugbe River and Botou River

· Alternative 3 - 20 MW project with 1 intake on Dugbe River

· Alternative 4 - 15 MW project with 1 intake on Dugbe River

 

The draft Pre-Feasibility hydropower study has been based on a mixture of regional rainfall data and topographical information ranging from 1m LiDAR data near the proposed powerhouse site, up to the 10m national topographic data. The study has so far included the following tasks: a site visit carried out in May 2015; stream gauging; a review of rainfall data; developing project concepts for the four alternative options; preparation of energy generation; capital cost estimation; and a review of licencing requirements and permitting.

 

The following table outlines the preliminary economics of the four alternative options.

 

DESCRIPTION

UNIT

ALTERNATIVE 1

ALTERNATIVE 2

ALTERNATIVE 3

ALTERNATIVE 4

Gross Head

m

41

41

41

41

Design Flow

m3/s

92

72

59

45

Installed Capacity

MW

30

25

20

15

Intakes & Canals

No.

3

Dugbe, Botou & Geebo

2

Dugbe & Botou

1

Dugbe

1

Dugbe

Capacity Factor

%

0.40

0.38

0.37

0.45

Mean Annual Energy

GWhr

106.3

82.5

64.7

59.5

Capital Cost Estimate (with Concrete Canal)

US$M

169.5

141.2

108.8

90.0

 

In addition to economic considerations, a hydropower development on the Dugbe River represents a legacy asset that will benefit the region by providing low cost renewable energy long after mine closure.

 

As noted, the draft Pre-Feasibility assessment has reduced conceptual HEP project design uncertainties, although there are still improvements needed before selecting the final layout and confirming the HEP feasibility. For the final Pre-Feasibility report a more detailed assessment of the hydrologic and topographic information will be needed over the coming months. Stream gauging will provide site specific hydrology data to prove the available water resource. Additionally, satellite topographic data offers the opportunity to improve capital cost certainty by refining canal and penstock alignments, and structure siting. This satellite survey information should be available in Q4 2015 and the completed Pre-Feasibility Report is expected to be finalised in Q2 2016.

 

About Knight Piésold

Knight Piésold has been in the hydropower business for over 80 years with extensive experience in large and small hydroelectric projects throughout the world. Their experience includes water storage projects, run-of-river projects and pumped storage projects. Knight Piésold provides a "one-stop-shop" for hydropower development, from resource identification and evaluation, financial services, environmental impact assessments and permitting, through to project management, site investigations, detailed engineering design, site supervision, O&M staffing and training, commissioning, and asset management. The improvement of existing units and facilities through power facility additions at existing dams, replacement of aging or low efficient equipment, and equipment upgrades or improvements, are also key elements of Knight Piesold's hydropower practice. Past projects include the 235MW East Toba and Montrose Projects and 150MW Kwalsa and Upper Stave Hydroelectric Projects in Canada, the 1,333MW Ingula Pumped Storage Scheme in South Africa, the 247MW Kalungwishi Hydroelectric Project in Zambia, and the 150MW Casecnan Multi-Purpose Hydroelectric Project.

 

Dugbe - Liberia

The Dugbe Gold Project is located within the Birimian Basin, the world's second largest gold producing region, characterised by exceptionally large, homogenous grade deposits which offer vast exploration and development scope. With a current Resource of 4.2 million ounces of gold at an average gold grade of 1.4 g/t, Dugbe offers a large-scale development opportunity for Hummingbird. The Company completed a Preliminary Economic Assessment ("PEA") in April 2013 which demonstrated the viable economics of developing a 20 year gold mining project with initial gold production of 125,000 ounces, an NPV of US$186 million, IRR of 29% using a US$1,300 gold price. Hummingbird is continuing to advance Dugbe and is progressing Definitive Feasibility Study optimisation work evaluating the large 4.2Moz gold resource, mining, processing and power capabilities with a view to future production viability.

 

**ENDS**

 

For further information please visit www.hummingbirdresources.co.uk or contact: 

 

Daniel Betts

Thomas Hill

Robert Monro

Hummingbird Resources plc

Tel: +44 (0) 203 416 3560

Stewart Dickson Jeremy Stephenson

Phil Davies

 

Cantor Fitzgerald Europe

Nominated Adviser and Joint Broker

Tel: +44 (0) 207 894 7000

 

Jon Belliss

Beaufort Securities Limited

Joint Broker

Tel: +44 (0) 20 7382 8300

Lottie Brocklehurst

Felicity Winkles

Hugo de Salis

St Brides Partners Ltd

Financial PR/IR

Tel: +44 (0) 20 7236 1177

 

Notes to Editors

Hummingbird Resources (AIM: HUM) is building a leading gold production, development and exploration company. The Company has two core gold projects, the near-term production Yanfolila Gold Project in Mali and the Dugbe development project in Liberia. Its current focus is on bringing Yanfolila, which has a 1.8Moz gold inventory, to production in 2016. The high grade gold project has the potential to turn a profit in a varying gold price environment and will allow for quick returns with low operating costs. A US$75 million debt facility has been agreed with Taurus Mining and mine construction is now underway with the aim of commencing production in 2016.

 

The 4.2Moz Dugbe Gold Project in Liberia provides Hummingbird with excellent development upside. An optimisation of the DFS is on-going whilst Yanfolila is brought to production in the near-term. Additionally, the Company has 5,000km2 highly prospective exploration ground in Mali and Liberia and is constantly evaluating new quality assets.

 

For more information, please visit www.hummingbirdresources.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFELFFEKFZBBL
Date   Source Headline
30th Jul 20157:00 amRNSWarrant Exercise & Total Voting Rights
13th Jul 20157:00 amRNSYanfolila Gold Project Grade Control
10th Jul 20152:45 pmRNSWarrant Exercise & Total Voting Rights
10th Jul 20157:00 amRNSDugbe Project MDA Signed with Liberian Government
6th Jul 20159:34 amRNSHolding(s) in Company
3rd Jul 20159:47 amRNSHolding(s) in Company
3rd Jul 20159:47 amRNSHolding(s) in Company
2nd Jul 20159:48 amRNSHolding(s) in Company
30th Jun 20157:00 amRNSSale of Asheba Licence in Ghana
26th Jun 20151:45 pmRNSResult of AGM
26th Jun 20157:00 amRNSRaises GBP0.5 million with long term shareholder
23rd Jun 201510:00 amRNSTotal Voting Rights - Correction
18th Jun 20153:30 pmRNSWarrant Exercise & Total Voting Rights
17th Jun 20157:00 amRNSImproved Technical Studies at Yanfolila Gold
17th Jun 20157:00 amRNSGBP 3.5 million Placing
8th Jun 20152:00 pmRNSAppointment of Joint Broker
28th May 20154:46 pmRNSPosting of Annual Report & Notice of AGM
28th May 20157:00 amRNSWarrant Exercise and Total Voting Rights
27th May 201510:30 amRNSChange of Accounting Reference Date
27th May 20157:00 amRNSFinal Results
15th May 201511:46 amRNSWarrant Exercise & Total Voting Rights
14th May 20155:02 pmRNSHolding(s) in Company
20th Apr 20151:45 pmRNSHolding(s) in Company
17th Apr 201512:00 pmRNSDirectors Dealings
17th Apr 20157:00 amRNSQ1 Update
16th Apr 20153:04 pmRNSHolding(s) in Company
15th Apr 20153:49 pmRNSResult of Open Offer and General Meeting
7th Apr 20157:00 amRNSHydro-Electric Collaboration Agreement in Liberia
30th Mar 20157:00 amRNSDrilling Yanfolila Gold Project Mali
24th Mar 20157:00 amRNSPosting of Circular
20th Mar 20159:20 amRNSUSD8.9M Result of Placing
19th Mar 20155:37 pmRNSProposed Yanfolila Gold Project Funding Package
13th Mar 20157:00 amRNSBlock Listing Six Monthly Return
4th Mar 20155:02 pmRNSHolding(s) in Company
2nd Mar 20157:00 amRNSOptimisation Study Yanfolila Gold Project Mali
27th Feb 20157:00 amRNSInterim Results
2nd Dec 20147:00 amRNSSignificant Resource Growth at Yanfolila Project
18th Nov 20147:00 amRNSDirectors Dealing
17th Nov 20147:00 amRNSDirectorate Change
14th Nov 201412:43 pmRNSResult of AGM
28th Oct 20147:00 amRNSHigh Grade Gold Drill Results from Yanfolila
20th Oct 20147:00 amRNSPosting of Annual Report
17th Oct 20147:00 amRNSFinal Results
9th Oct 201410:09 amRNSHolding(s) in Company - Replacement
8th Oct 20145:37 pmRNSHolding(s) in Company
8th Oct 20145:30 pmRNSHolding(s) in Company
8th Oct 201410:39 amRNSHolding(s) in Company
7th Oct 20147:00 amRNSUS$3m Private Placement
12th Sep 20147:00 amRNSBlock Listing Six Monthly Return
10th Sep 20147:00 amRNSHigh grade results from Yanfolila

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.