Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHummingbird Regulatory News (HUM)

Share Price Information for Hummingbird (HUM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 10.10
Bid: 9.70
Ask: 10.50
Change: 0.88 (9.54%)
Spread: 0.80 (8.247%)
Open: 9.20
High: 10.75
Low: 9.20
Prev. Close: 9.22
HUM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update on the Dugbe Gold Project, Liberia

12 Mar 2021 07:36

RNS Number : 0786S
Hummingbird Resources PLC
12 March 2021
 

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

 

12 March 2021

 

Hummingbird Resources plc

('Hummingbird' or the 'Company') 

 

Drilling Update on the Dugbe Gold Project, Liberia

 

Hummingbird Resources plc (AIM:HUM) is pleased to note the update from Pasofino Gold Ltd ("Pasofino") (TSXV:VEIN) on the results of holes drilled at the Dugbe Gold Project (the "Project") in Liberia. For the full Pasofino release details and graphics, please follow the link here.

 

Pasofino is carrying out the drill programme, and covering all associated costs, as part of its earn-in agreement for a 49% stake in the Project, with Hummingbird maintaining a controlling interest of 51%. For further details on the option and earn-in agreement with Pasofino, please refer to the Company's RNS dated 4 June 2020.

 

Highlights from the Pasofino release include:

§ Results received for the first drill holes of the planned 5,500 metres drill programme at the Dugbe F deposit

§ Intersections of the flat to gently undulating layer include;

§ 26.7 metres at 1.44 g/t gold from 86.9 metres in DFDC338

§ 10.0 metres at 1.48 g/t gold from 67.9 metres in DFDC335

§ 14.6 metres at 1.30 g/t gold from 102.0 metres in DFDC335

§ 4.1 metres at 2.17 g/t gold from 16.9 metres in DFDC334

§ All seven of the new drill holes intersected gold mineralisation of the expected range of thickness and grade. Gold bearing intersections being up to 26.7 meters in thickness

§ These are the first holes drilled at Dugbe F since those drilled in 2014 by Hummingbird and the results support the continuity of the deposit

§ Additional shallow mineralised intervals are present above the main zone within the southern part of the deposit and have the potential to add to the resource base

§ The current infill drilling is aimed at upgrading the Inferred Mineral Resource Estimate ('MRE') with the objective of achieving an Indicated MRE of between 0.6 and 1.0 million ounces

§ Pasofino has initiated a Preliminary Economic Assessment ('PEA') and is to be released in due course, prior to the release of the Definitive Feasibility Study ('DFS')

Dan Betts, CEO of Hummingbird Resources, commented:

"We are encouraged by the first set of results we are receiving from Pasofino at the Dugbe F deposit and the progress being made at the Project. This is the first drill programme at the deposit since 2014 and these initial results are already confirming the potential of increasing the value of the Project. The objective of the drill programme is to increase the Indicated MRE. The results we are already starting to see put Pasofino on track to delivering this, supporting the DFS Pasofino are completing as part of its earn-in agreement."

Ian Stalker, CEO of Pasofino, commented: 

"These intersections and the rate at which we are progressing the drilling puts us on track to achieve our target of a 0.6 to 1.0 M ounces in the Indicated category at Dugbe F which would bring the project total closer to 3 Moz in the Indicated Category. We have 3 rigs turning 24/7 at the moment and are completing 8 to 10 holes per week. Two rigs will move over to the larger Tuzon deposit as soon as access is ready."

 

Further information:

 

Dugbe F deposit overview (selected information from the Pasofino release).

 

The deposit length as defined by the dimensions of the conceptual pit is 2.5 km. The width of the deposit ranges from 1.3 km in the south to 200-300 m in the north. The current drilling program is mostly infill drilling aimed at upgrading the Inferred Mineral Resource.

 

The gold is hosted by a flat to undulating layer which outcrops along the western side of the deposit and dips gently southeast to a maximum of 120 m below surface within the conceptual pit. The host rock is orthopyroxene gneiss with increased sulphide content (visible pyrrhotite, arsenopyrite and pyrite) and seems to be a largely stratiform layer close to the contact with overlying quartz biotite gneiss. There is no discernable shear-related or other structural control. The rocks are high grade metamorphic, and structural controls may have been obliterated by later ductile deformative events. Pegmatites may be found within or bounding the mineralized layer but appear to be largely parallel or subparallel with it.

 

As per the Pasofino release, refer below for the reported 7-hole drill intersection data from the Dugbe F deposit:

 

Table 1. All intersections from the reported 7 holes. Drillholes are estimated to be true thickness or close to true thickness (within approximately 10%). *Note results below 113.6 m depth in DFDC338 are pending.

 

BHID

From m

To m

Interval (m)

Au g/t

DFDC334

16.9

21.0

4.1

2.17

DFDC335

46.5

60.0

13.5

0.49

and

67.9

77.9

10.0

1.48

and

102.0

116.6

14.6

1.30

DFDC336

67.0

73.5

6.5

1.15

DFDC337

86.6

100.0

13.4

0.86

DFDC338

70.4

72.8

2.4

1.20

and

86.9

113.6*

26.7

1.44

DFDC340

48.0

49.0

1.0

7.20

 and

71.6

76.0

4.4

1.08

DFDC347

28.7

33.6

4.9

1.15

Qualified Person sign off:

 

Murray Paterson has reviewed the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. Murray Paterson is the VP Geology for the Company and is a member of good standing with the Australasian Institute of Mining and Metallurgy (MAusIMM), with 25 years' experience.

 

**ENDS**

 For further information please visit www.hummingbirdresources.co.uk or contact:

Daniel Betts, CEO

Thomas Hill, FD

Edward Montgomery, CSO & ESG

Hummingbird Resources plc

Tel: +44 (0) 20 7409 6660

James Spinney

Ritchie Balmer

 

Strand Hanson Limited

Nominated Adviser

Tel: +44 (0) 20 7409 3494

James Asensio

Thomas Diehl

Canaccord Genuity Limited

Broker

Tel: +44 (0) 20 7523 8000

Tim Blythe

Megan Ray

Rachael Brooks

Blytheweigh

Financial PR/IR

Tel: +44 (0) 20 7138 3205

Notes to Editors:

Hummingbird Resources (AIM: HUM) is a leading multi-asset, multi-jurisdiction gold production, development and exploration company and member of the World Gold Council ("WGC"). Our vision is to continue to grow our asset base, producing highly profitable ounces, while central to all we do being our Environmental, Social & Governance ("ESG") policies and practices. The Company currently has two core gold projects, the Yanfolila Gold Mine in Mali, and the Kouroussa Gold Project in Guinea. Further, the Company has a controlling interest in the Dugbe Gold Project in Liberia that is being developed by Pasofino Gold Limited through an earn-in agreement. Construction of the Yanfolila mine, was on time and on budget in December 2017 having produced to date in excess of 321 kozs (as end of December 2020). Mineable Reserves, as at 31 October 2019 Yanfolila were 7.9Mt of Reserve ore @ 2.66 g/t for 676,000ozs gold. At 31 March 2019 Yanfolila had a total Resource base (inclusive of Reserves) of 28Mt of Ore @ 2.23 g/t for 2,005,300ozs gold. The Kouroussa Gold Project has a Mineral Resource base of 1.18Moz @ 3.08 g/t, which we are working on to be fast tracked to production, adding an additional c.100,000 oz of gold per annum to the Company's production profile.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGRGDXXXBDGBD
Date   Source Headline
15th Aug 20147:00 amRNSDraw Down of US$10m Taurus Bridge Facility
14th Aug 20143:32 pmRNSHolding(s) in Company
14th Aug 20143:31 pmRNSHolding(s) in Company
11th Aug 20147:00 amRNSYanfolila Funded with US$75m Debt Facility
22nd Jul 20147:00 amRNSSENET Appointed for Development of Yanfolila
8th Jul 201412:36 pmRNSHolding(s) in Company
4th Jul 201410:42 amRNSHolding(s) in Company
2nd Jul 201412:20 pmRNSShareholding Disclosure
2nd Jul 20147:00 amRNSAppointment of Project Team
1st Jul 201412:30 pmRNSResult of General Meeting
16th Jun 20147:00 amRNSPosting of Circular and Notice of General Meeting
12th Jun 20147:00 amRNSProposed Acquisition of Gold Fields' Malian Assets
9th Jun 20147:00 amRNSShareholding Disclosure
29th Apr 20147:00 amRNSIncreased Metallurgical Recoveries
8th Apr 20147:00 amRNSFirst Quarter Operational Update
13th Mar 20147:00 amRNSFinal Tranche of Royalty Funding Received
12th Mar 20148:28 amRNSReplacement: Material Increase to Tuzon Resource
12th Mar 20147:00 amRNSMaterial Increase to Tuzon Resource
11th Mar 201411:55 amRNSBLOCK LISTING SIX MONTHLY RETURN
19th Feb 20147:00 amRNSInterim Results
3rd Feb 20147:00 amRNSPositive Results from Infill Drilling Campaign
20th Jan 20147:00 amRNSFourth Quarter Operational Update
9th Dec 20131:17 pmRNSHolding(s) in Company
9th Dec 20131:03 pmRNSDirector/PDMR Shareholding
5th Dec 201312:01 pmRNSGrant of Share Options
28th Nov 20138:12 amRNSNew Significant Shareholder
28th Nov 20137:00 amRNSUpdated Interim Tuzon Resource
19th Nov 201312:35 pmRNSResult of AGM
13th Nov 20137:00 amRNSAppointment of Endeavour Financial
11th Nov 20137:00 amRNSChange of Adviser
7th Nov 20137:00 amRNSDTI Funding for Definitive Feasibility Study
15th Oct 20137:00 amRNSThird Quarter Operational Update
11th Oct 20137:00 amRNSPosting of Annual Report
17th Sep 201310:43 amRNSBlock Listing Six Monthly Return
15th Aug 20137:00 amRNSFinal Results
9th Aug 20137:00 amRNSDrilling Update at the Dugbe 1 Project
15th Jul 20137:00 amRNSAppointment of Lead Consultant for Dugbe 1 DFS
15th Jul 20137:00 amRNSLetter of Intent Signed
28th Jun 20137:00 amRNSFormation of Technical Advisory Committee
7th Jun 20137:00 amRNSHolding(s) in Company
7th Jun 20137:00 amRNSHolding(s) in Company
3rd Jun 20137:00 amRNSFurther results from 2013 Infill Drill Campaign
24th May 20137:00 amRNSHolding(s) in Company
22nd May 20134:50 pmRNSHolding(s) in Company
3rd May 20134:16 pmRNSHolding(s) in Company - Replacement
3rd May 20134:11 pmRNSHolding(s) in Company
3rd May 20134:10 pmRNSHolding(s) in Company
29th Apr 20137:00 amRNSDirector/PDMR Shareholding
17th Apr 20137:00 amRNSAppointment of AMEC
11th Apr 20137:00 amRNSSecond Tranche of Royalty Funding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.