Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHummingbird Regulatory News (HUM)

Share Price Information for Hummingbird (HUM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.25
Bid: 9.00
Ask: 9.50
Change: 0.25 (2.78%)
Spread: 0.50 (5.556%)
Open: 8.90
High: 9.25
Low: 9.00
Prev. Close: 9.00
HUM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Updated Interim Tuzon Resource

28 Nov 2013 07:00

RNS Number : 1309U
Hummingbird Resources PLC
28 November 2013
 



 

28 November 2013

 

 

Hummingbird Resources plc

("Hummingbird" or the "Company") (AIM: HUM)

 

Updated Interim Tuzon Resource

 

 

Hummingbird, the Liberian gold exploration and development company, is pleased to announce an updated interim Mineral Resource Estimate for its Tuzon Deposit located within the Dugbe 1 Project.

 

Highlights

 

· New Mineral Resource estimate provided by SRK Consulting (UK) Ltd constrained within a US$1,500 pit shell and using a 0.5 g/t cut off grade comprises 37.6 Mt at an average grade of 1.27 g/t for 1.54 Moz of gold

· The Mineral Resource tonnage is 65% of the drill-defined mineralisation within the geological deposit

· Contained within this resource are Indicated Mineral Resources of 12.8 Mt at 1.22 g/t for 0.5 Moz, including two higher grade zones of 337,000 oz at 1.57 g/t and a further 77,000 oz at 1.44 g/t

· Using a $1,200 pit, the resource remains robust showing a total resource of 1.5 Moz, including an Indicated Mineral Resource of 12.5 Mt at 1.23 g/t for 0.5 Moz

· A high-grade US$600 starter pit contains 7.8 Mt at an average grade of 1.63 g/t for 0.41 Moz, based on a 0.8 g/t cut off grade has been identified; this has a low strip ratio of 1.3:1 (lower grade resource to stockpile and waste per 1t of high grade resource)

· Definition of a robust geological model developed through an extensive geological modeling process

· Only an estimated 2,500 metres of infill drilling is anticipated to upgrade remainder of the resource to indicated

· This drill program has been mobilized already and should be completed by January 2014

· Detailed Feasibility Study remains on track to be completed in Q3 2014

 

Dan Betts, Chief Executive of Hummingbird Resources, said:

 

"These results confirm the Company's confidence in the Tuzon deposit's ability to underpin initial gold production at the Dugbe 1 Project. The low strip ratio and higher grade zones are materially better than in the PEA economics and there is clear potential for further upside. Furthermore, the robustness of the Resource at US$1,200 gold is excellent. The focus of this remodelling work has been to confirm the existence of higher grade zones of ore that would be potentially mineable in the early years of the project and today's resource work confirms the existence of such zones.

 

Drilling is about to commence on the additional holes recommended by SRK focusing on upgrading the remaining Tuzon Resource to Indicated. This drilling accounts for less than 10% of total metres drilled to date at Tuzon."

 

Background

 

To date, Hummingbird has conducted 15,802m of infill drilling in 2013, with the Company announcing the results from the final 15 holes drilled in August 2013.

 

The main aim of the programme was to underline the overall grade and confidence of the Tuzon deposit as defined in the Preliminary Economic Assessment ("PEA"). The results obtained from the recent drilling when combined with exploration data from previous drilling campaigns have contributed hugely to the understanding of the deposit and the validity of the geological model.

 

Hummingbird appointed SRK Consulting (UK) Limited ("SRK") to undertake a Mineral Resource Estimate ("MRE") on the Tuzon deposit. The Company has received a memorandum from SRK which contains an interim mineral resource. The final MRE report together with an updated model will be provided to Hummingbird in due course on completion of the additional drilling.

 

Mineral Resource Statement

 

The Tuzon deposit has been explored and sampled using appropriate methodologies and is sufficiently understood to support the estimation of Indicated and Inferred Mineral Resources.

 

The 2013 infill drilling was carried out on an 80x80m grid using diamond core rigs and was supported by an extensive trenching programme. With mineralisation from surface trenching is an effective tool to support Resource definition. Rigorous Quality Assurance / Quality Control ("QAQC") was adhered to throughout the programme and inspected on site visits by SRK. SRK were satisfied that the assay results are sufficiently sound to be used for resource estimation purposes.

 

A geological model was developed jointly by HBR geologists and SRK to constrain the gold mineralisation and to improve understanding of both geological and grade continuity. The geometry of the deposit is controlled by 3 major folding phases (F1-F3), with only localised minor shearing and faulting. Gold mineralisation is localised in the orthopyroxene gneiss near to the contact zone between this and the felsic biotite gneiss. The general form of the deposit is a recumbent fold (F3) with folded limbs (F2). Because of the folded nature, SRK used the GoCAD software to create the block model and then to "unfold" it so that the variographic analysis and grade interpolation could be undertaken most effectively. The grade was interpolated using Ordinary Kriging, and the resulting informed block model then "re-folded" for determining the Mineral Resources.

 

The table below shows the resulting Mineral Resource Statement for the Tuzon Project with an effective date of 11th November 2013. The statement has been classified in accordance with the JORC Code, by the Competent Person, Mr Martin Pittuck (CEng, MIMMM).

 

Figure 1: Mineral Resource Statement for the Tuzon Gold Project as of 11th November 2013

Classification

Zone

Density

Tonnage (Kt)

Au (g/t)

Au (Koz)

Indicated

A (High Grade)

2.78

6,650

1.57

337

A (Low Grade)

2.78

4,180

0.60

81

B (High Grade)

2.78

1,670

1.44

77

B (Low Grade)

2.78

300

0.59

6

Total

2.78

12,800

1.22

501

Inferred

A (High Grade)

2.78

4,510

1.46

212

A (Low Grade)

2.78

4,760

0.63

96

B (High Grade)

2.78

10,810

1.75

606

B (Low Grade)

2.78

1,240

0.54

21

Hangingwall 1

2.78

1,170

0.72

27

Hangingwall 2

2.78

600

1.06

21

Internal

2.78

430

0.75

11

Oxide

1.7

1,310

1.10

46

Total

2.72

24,830

1.31

1,040

Grand Total

37,630

1.27

1,541

*Reported within a US$1,500 pit shell at a cut-off grade of 0.5 g/t

The material differences between the WAI Potential Mineable Resource Estimation from 2013 and the 2013 Mineral Resource Statements are the change in classification and the decrease in total tonnage. The grade has not changed significantly. The decrease in tonnage is due to the constraint of the 2013 Mineral Resource by the US$1,500 pit shell.

 

Further to the declaration of the Mineral Resource Statement, SRK have produced tables that show the grade and tonnage in the current block model within a US$1,200 and a US$600 pit shell.

 

Figure 2: Total Tonnage contained within a US$ 1,200 pit shell (inclusive of the US$600 pit shell)

Classification

Zone

Grade Range

Density

Tonnage (Kt)

Au (g/t)

Koz

Indicated

A

0.5-0.8 g/t

2.78

3,810

0.59

72

>0.8 g/t

2.78

6,720

1.56

338

B

0.5-0.8 g/t

2.78

300

0.59

6

>0.8 g/t

2.78

1,660

1.44

77

 Total

0.5-0.8 g/t

2.78

4,110

 0.59

78

>0.8 g/t

2.78

8,380

1.54

415

Inferred

A

0.5-0.8 g/t

2.78

3,190

0.60

61

>0.8 g/t

2.78

4,630

1.43

 213

B

0.5-0.8 g/t

2.78

1,060

0.54

18

>0.8 g/t

2.78

10,450

1.75

588

Hangingwall 1

0.5-0.8 g/t

2.78

280

0.74

 7

>0.8 g/t

2.78

40

0.82

1

Hangingwall 2

0.5-0.8 g/t

2.78

10

0.78

-

>0.8 g/t

2.78

470

1.10

17

Internal

0.5-0.8 g/t

2.78

800

0.65

17

>0.8 g/t

2.78

340

0.92

 10

Oxide

0.5-0.8 g/t

1.7

370

0.67

8

>0.8 g/t

1.7

880

1.32

 37

 Total

0.5-0.8 g/t

2.71

5,710

0.60

111

>0.8 g/t

2.72

16,810

1.60

 866

 Grand Total

0.5-0.8 g/t

2.74

9,820

0.60

189

>0.8 g/t

2.74

25,190

1.58

 1,281

Category

Overall Strip Ratio (t:t)

Tonnage (kt)

Au (g/t)

Koz

Low Grade Resource (>0.5 g/t)

35,010

1.31

1,470

Waste

114,040

 0.04

 161

Stripping Ratio (t:t)

3.26

High Grade Resource (>0.8 g/t)

25,190

1.58

1,281

Waste

123,860

 0.09

350

Stripping Ratio (t:t)

4.92

 

 

Figure 3: Total Tonnage contained within a US$600 pit shell split by grade range

 

Classification

Zone

Grade Range

Density

Tonnage (Kt)

Au (g/t)

Koz

Indicated

A

2.78

560

 0.42

 8

0.5-0.8 g/t

2.78

860

 0.60

 17

>0.8 g/t

2.78

2,240

 1.67

 120

B

2.78

10

 0.26

 -

0.5-0.8 g/t

2.78

60

 0.62

 1

>0.8 g/t

2.78

760

 1.51

 37

Total

2.78

570

 0.44

 8

0.5-0.8 g/t

2.78

920

 0.61

 18

>0.8 g/t

2.78

3,000

 1.63

 157

Inferred

A

2.78

920

 0.40

 12

0.5-0.8 g/t

2.78

300

 0.54

 5

>0.8 g/t

2.78

1,610

 1.59

 83

B

2.78

410

 0.30

 4

0.5-0.8 g/t

2.78

170

 0.59

 3

>0.8 g/t

2.78

2,660

 1.69

 145

Internal

 -

 -

 -

 -

0.5-0.8 g/t

2.78

40

 0.65

 1

>0.8 g/t

2.78

10

 0.92

 -

Oxide

1.7

100

 0.40

 1

0.5-0.8 g/t

1.7

120

 0.73

 3

>0.8 g/t

1.7

560

 1.42

 25

Total

2.7

1,430

 0.37

 17

0.5-0.8 g/t

2.57

630

 0.59

 12

>0.8 g/t

2.66

4,840

 1.63

 253

Grand Total

2.72

2,000

0.39

 25

0.5-0.8 g/t

2.69

1,550

0.60

 30

>0.8 g/t

2.71

7,840

1.63

 410

Category

Overall Strip Ratio (t:t)

Tonnage (kt)

Au (g/t)

Koz

Low Grade Resource (>0.5 g/t)

9,390

 1.46

 440

Waste

8,700

 0.09

 25

Stripping Ratio (t:t)

0.93

High Grade Resource (>0.8 g/t)

7,840

 1.63

 410

Waste

10,250

 0.17

 55

Stripping Ratio (t:t)

1.31

 

Planned Drilling

 

Hummingbird and SRK reviewed the current Tuzon resource model and compiled a preliminary drilling programme which comprises 17 infill drillholes and five hole extensions which total around 2,500m. If the results of this programme confirm the current geological and grade model the expectation is the material within this area currently classified as Inferred Resources will be upgraded to Indicated Resources.

 

Competent Person Review

David Pelham has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. David Pelham is a Director of the Company and is a member of the Institute of Materials, Minerals and Mining.

 

SRK have also reviewed the information contained in this announcement and confirms it is in accordance with the facts, it does not omit anything likely to affect the import of such information and is in accordance with the guidelines and reporting terminology given in the JORC Code 2004.

 

 

 

-ENDS-

 

 

Enquiries:

Hummingbird Resources plc

Daniel Betts, Chief Executive Officer

Thomas Hill, Finance Director

Robert Monro, Head of Business Development

+44 (0) 203 416 3560

Cantor Fitzgerald Europe

Nominated Adviser and Broker

Stewart Dickson / Tom Sheldon / Jeremy Stephenson

+44 (0) 207 894 7000

 

 

FTI Consulting LLP

Financial PR

Ben Brewerton / Oliver Winters

+44 (0) 207 831 3113

 

Notes to Editors

About Hummingbird Resources Plc

Hummingbird Resources plc is an AIM quoted mineral exploration company incorporated in England and Wales and headquartered in London. Since its establishment in November 2005, the Company and its subsidiaries (the "Group") has been active in Liberia, West Africa, and is currently the holder of the largest area of mineral exploration ground in the highly prospective Birimian geological region of eastern Liberia. The Group has published a PEA on its project showing on a 3.5Mtpa tank leach operations an NPV of US$337m on a Capex of US$212m for an IRR of 43.4%. This gives a payback period of 3 years and is based on a 10% discount rate and US$1,500 gold price (three year average gold price at time of release).

The Group has published a NI43-101 compliant Inferred Resource on its Dugbe F deposit of 43.01 million tonnes at 1.28 g/t Au to give 1,764,000 ounces of gold using a lower cut-off grade of 0.5 g/t Au and no upper cut-off grade.

In 2013, the Group is moving the Dugbe 1 Project towards feasibility with 15,802m of infill drilling completed this year. Additionally, the Group's licence areas constitute a significant proportion of eastern Liberia's Birimian sequence.

For more information, please visit www.hummingbirdresources.co.uk

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGBDBSGDBGXI
Date   Source Headline
25th Apr 20247:00 amRNSQ1 2024 Operational and Trading Update
19th Apr 20247:00 amRNSNotice of Q1-2024 Operational and Trading Update
16th Apr 20247:00 amRNSOperation Update & Kouroussa Production Roadmap
28th Mar 20247:00 amRNSUpdate of Mining Operations at Kouroussa
20th Mar 20243:26 pmRNSResponse to Corica Mining Statement
18th Mar 20249:32 amRNSUpdate on Mining Operations at Kouroussa
11th Mar 20248:00 amRNSBlock Listing Six Monthly Return
27th Feb 20247:00 amRNSPasofino Gold announces exploration update
5th Feb 20248:00 amRNSUpdated Corporate Presentation
31st Jan 20247:00 amRNSQ4-2023 Operational and Trading Update
25th Jan 20247:00 amRNSKouroussa Mine Update/Notice of Q4 Trading Update
24th Jan 20247:00 amRNSPasofino Gold Announces US$2.3m Private Placement
19th Jan 202412:47 pmRNSNotification of Major Holdings
10th Jan 20242:21 pmRNSResult of GM, Director Dealing and TVR
10th Jan 20247:00 amRNSResult of Open Offer and Director Dealing
21st Dec 20237:00 amRNSPlacement Update, Open Offer & Notice of GM
21st Dec 20237:00 amRNSOperational and Exploration Update
13th Dec 20237:00 amRNSCompletion of Pasofino Gold to 51% interest
7th Dec 20237:00 amRNSCorporate strategy update, equity placement & TVR
16th Nov 20237:00 amRNSUpdated Corporate Presentation
26th Oct 20237:00 amRNSQ3-2023 Operational and Trading Update
19th Oct 20237:00 amRNSNotice of Q3-2023 Operational and Trading Update
10th Oct 20237:00 amRNSUpdate Interview with Senior Management
28th Sep 20237:00 amRNS1H23 Group Interim Results
13th Sep 20237:00 amRNS2023 Updated Reserves and Resources Statements
11th Sep 20237:00 amRNSBlock Listing Six Monthly Return
25th Jul 20237:30 amRNSQ2 2023 Operational Trading Update Presentation
25th Jul 20237:00 amRNSQ2 2023 Operational and Trading Update
13th Jul 20237:00 amRNSNotice of Second Quarter Trading Update
29th Jun 202310:12 amRNSResult of AGM
29th Jun 20237:00 amRNS2023 AGM Statement
9th Jun 20237:00 amRNSFirst Gold Pour at Kouroussa Gold Mine
6th Jun 20237:00 amRNSPublication of Annual Report
6th Jun 20237:00 amRNSPublication of Sustainability Report 2022
5th Jun 20237:00 amRNSUpdated Corporate Presentation
22nd May 20237:00 amRNSKouroussa Gold Mine Commissioning Update
2nd May 20237:00 amRNSKouroussa Gold Mine Commissioning Begins
19th Apr 20237:30 amRNSMedia presentation of Q1 2023 Operational Update
19th Apr 20237:00 amRNSQ1 2023 Operational and Trading Update
18th Apr 202311:37 amRNSAIM Rule 17
31st Mar 20237:00 amRNS2023 LTIP & Deferred Share Awards and TVR
20th Mar 20239:05 amRNSSecond Price Monitoring Extn
20th Mar 20239:00 amRNSPrice Monitoring Extension
13th Mar 20232:54 pmRNSResult of General Meeting, Director Dealing & TVR
10th Mar 20237:30 amRNSKouroussa Gold Mine, Construction Media Update
10th Mar 20237:05 amRNSBlock Listing Six Monthly Return
10th Mar 20237:00 amRNSResult of Open Offer and Director Dealing
7th Mar 20232:05 pmRNSSecond Price Monitoring Extn
7th Mar 20232:00 pmRNSPrice Monitoring Extension
2nd Mar 202311:36 amRNSNotification of Major Holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.