Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHummingbird Regulatory News (HUM)

Share Price Information for Hummingbird (HUM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.00
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.80 (9.412%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 9.00
HUM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Material Increase to Tuzon Resource

12 Mar 2014 07:00

RNS Number : 0681C
Hummingbird Resources PLC
12 March 2014
 



Wednesday 12 March 2014

 

Hummingbird Resources plc

("Hummingbird Resources" or the "Company") (AIM: HUM)

 

Material Increase to Tuzon Resource grade, size and Indicated Resource ounces

 

 

Hummingbird Resources, the Liberian gold exploration and development company, provides a new Mineral Resource Estimate ("MRE") on the Company's Tuzon deposit of the Dugbe 1 Project in Liberia. The MRE was carried out by SRK Consulting (UK) Limited ("SRK"), an independent consultant, which incorporates the results from the recently completed infill drill program.

 

 

Highlights*

 

· Hummingbird Resources total resource inventory increased to 4.2 Moz

 

· Significant increase in the Indicated Resource grade from 1.23 to 1.56 Au g/t within the US$1,200/oz Au constrained pit

 

· Tuzon Indicated Resource within a US$1,500/oz Au constrained pit increased to 42 Mt @ 1.5 Au g/t for 2.0m Moz

 

· Tuzon Mineral Resource across both pit shell scenarios:-

 

Inferred

Indicated

Total

Deposit

Pit Shell

Tonnage

Au (g/t)

Au (Koz)

Tonnage

Au (g/t)

Au (Koz)

Au (Koz)

Tuzon

$1,200

4,965

2

244

37,400

2

1,879

2,123

Tuzon

$1,200

10,201

1

435

41,800

2

2,031

2,466

 

\* Total resource inventory is the Dugbe F inferred resource of 1,764 Koz + the Tuzon $1500 pit shell resource of 2,466 Koz

*Reported with cut-off grade of 0.5 g/t, US$1,200 pit shell is not categorised as Mineral Resource Estimate for purposes of SRK report

 

· Technical risk of the Dugbe 1 Project is materially de-risked through development of a robust resource model and significant increase in expected mine life

 

· This programme concludes the necessary resource drilling required for the Definitive Feasibility Study ("DFS") which is on track to be completed in Q3 2014

 

· Final US$5m tranche of royalty funding from Anglo Pacific Group in the process of being paid to Hummingbird

 

 

Dan Betts, Chief Executive of Hummingbird, said:

 

"These outstanding results are the culmination of a tremendous effort by the Hummingbird Resources Technical team and our consultants.

 

The recently completed infill drilling has confirmed that the new resource model developed for Tuzon shows an impressive degree of predictability. This supports the material increase in the level of confidence now provided in this Mineral Resource Estimate with the Indicated categorisation of over 80% of the total Resource. This predictability also supports the Company's belief in the ability to further increase the Resource at Tuzon which remains open in several directions.

 

Other work on the DFS continues to unlock value and progresses well. Exploration efforts at interpreting further near pit resources are ongoing and the original belief that Hummingbird was sitting on one of West Africa's prime new gold districts seems to be being borne out. We believe that the Dugbe 1 Project now represents one of the largest and one of the most robust undeveloped gold projects in West Africa and continues to demonstrate best in class value to potential investors".

 

Conference Call Details

Management will be hosting a conference call for analysts at 9.00am UK time this morning. Please find the dial in details below:

Time & Date: 9.00am - Wednesday 12 March 2014

Dial In Details: +44 (0) 1452 569393

 

 

 

ENDS

 

 

Enquiries:

Hummingbird Resources plc

Daniel Betts, Chief Executive Officer

Thomas Hill, Finance Director

Robert Monro, Head of Business Development +44 (0) 203 416 3560

 

Cantor Fitzgerald Europe

Nominated Adviser and Broker

Stewart Dickson/ Tom Sheldon/ Jeremy Stephenson +44 (0) 207 894 7000

 

FTI Consulting LLP

Financial PR

Ben Brewerton / Oliver Winters +44 (0) 207 831 3113

 

Mineral Resource Statement

The Tuzon deposit has been explored and sampled using appropriate methodologies and is sufficiently understood to support the estimation of Indicated and Inferred Mineral Resources. Table 1 shows the resulting Mineral Resource Statement for the Tuzon Project with an effective date of 5th March 2014. The statement has been classified in accordance with the CIM Code, by the Qualified Person, Mr Martin Pittuck (CEng, MIMMM). Mr Pittuck is an independent consultant who is independent of Hummingbird Resources Plc.

Table 1: Mineral Resource Statement for the Tuzon Gold Project as of 5th March 2014

Classification

Zone

Density

Tonnage (Kt)

Au (g/t)

Au (Koz)

Indicated

A (High Grade)

2.78

18,000

1.44

833

A (Low Grade)

2.78

1,100

0.53

18

B (High Grade)

2.78

19,100

1.72

1,054

B (Low Grade)

2.78

200

0.54

4

Hangingwall 1

2.78

2,200

1.11

78

Internal

2.78

600

0.9

18

Oxide

1.56

600

1.33

26

Total Indicated

2.76

41,800

1.51

2,031

Inferred

A (High Grade)

2.78

2,200

1.16

80

A (Low Grade)

2.78

600

0.61

13

B (High Grade)

2.78

5,800

1.59

297

B (Low Grade)

2.78

200

0.53

3

Hangingwall 1

2.78

400

0.83

11

Hangingwall 2

2.78

200

0.98

7

Hangingwall 3

2.78

500

0.91

15

Internal

2.78

1

0.93

0.02

Oxide

1.56

300

0.86

9

Total Inferred

2.74

10,201

1.32

435

*Reported within a US$1,500 pit shell at a cut-off grade of 0.5 g/t

Comparison with 2013 mineral resource statement

The main differences between the 2013 statement and the 2014 statement are the significant increase in grade tonnage and the 305% increase in proportion of Indicated Mineral Resources to 2,031,000 ounces. This significant improvement in both size and grade has been driven by the thicker high grade intersections through the deeper parts of Zone B resulting from recently deepened drillholes.

Also, with some refinement in SRK's interpretation, there is improved definition and continuity of the high grade domains in Zone A and Zone B.

These positive changes have resulted in a deeper, more elongated US$1,500 pit shell, a cross section of which can be viewed here

http://www.rns-pdf.londonstockexchange.com/rns/0681C_-2014-3-11.pdf

The increase of 29 million tonnes of Indicated Resource is due to conversion of material previously classified as Inferred largely as a result of the infill drilling completed in the intervening period which was designed specifically to achieve this classification upgrade.

SRK has also generated the Mineral Resources constrained within a US$1,200 pit using the same parameters at a 0.5 g/t cut-off grade. The new model shows total indicated and inferred resource increasing by 45% to 2,123,000 ounces with the total Indicated Mineral Resources increasing by 281% to 1,879,000 ounces at a grade of 1.56 g/t.

Table 2: Tuzon Mineral Resources within the US$1,200 pit shell

Classification

Zone

Density

Tonnage (Kt)

Au (g/t)

Au (Koz)

Indicated

A (High Grade)

2.78

15,300

1.49

734

A (Low Grade)

2.78

700

0.52

11

B (High Grade)

2.78

18,300

1.73

1,020

B (Low Grade)

2.78

100

0.53

2

Hangingwall 1

2.78

2,000

1.13

73

Internal

2.78

400

0.96

14

Oxide

1.56

600

1.39

25

Total

2.76

37,400

1.56

1,879

Inferred

A (High Grade)

2.78

300

1.03

10

A (Low Grade)

2.78

2

0.55

0.03

B (High Grade)

2.78

4,300

1.63

223

B (Low Grade)

2.78

27

0.52

0.5

Hangingwall 1

2.78

3

2.02

0.5

Hangingwall 2

2.78

200

1

5

Hangingwall 3

2.78

13

0.93

0.4

Internal

2.78

0.1

1.51

0.01

Oxide

1.56

120

1.21

5

Total

2.75

4,965

1.55

244

*Reported at a cut-off grade of 0.5 g/t

Royalty Agreement

The third tranche of royalty funding of US$5 million from Anglo Pacific Group Plc is in the process of being paid, which will take the cash balance of the Company to approximately US$10m.The Company is fully funded through to the completion of the DFS.

Conclusion

The results obtained from the recent drilling have confirmed the understanding of the deposit and the validity of the geological model at Tuzon.

The infill drilling has achieved the objective of converting the previously Inferred Mineral Resources constrained within a US$1,200 shell to Indicated to provide a significant tonnage at 37.4 Million tonnes, capable of supporting a robust detailed feasibility study.

In addition to the drilling at Tuzon, the Company is conducting further drilling on the Dugbe F Resource. This drill programme is targeting the potential for higher grade starter pits located at Dugbe F.

Qualified Person Review: David Pelham has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. David Pelham is a Director of the Company and is a member of the Institute of Materials, Minerals and Mining.

Notes to Editors

About Hummingbird Resources Plc

Hummingbird Resources plc is an AIM quoted mineral exploration company incorporated in England and Wales and headquartered in London. Since its establishment in November 2005, the Company and its subsidiaries (the "Group") has been active in Liberia, West Africa, and is currently the holder of the largest area of mineral exploration ground in the highly prospective Birimian geological region of eastern Liberia. The Group has published a PEA on its project showing that using a $1,500 gold price, on a 3.5Mtpa tank leach operation, The project has an NPV of US$337m on a Capex of US$212m for an IRR of 43.4%. This gives a payback period of 3 years and is based on a 10% discount rate and US$1,500 gold price (three year average gold price at time of release).

The Group has recently published a Mineral Resource estimate for the Tuzon deposit constrained within a US$1,500 pit shell and using a 0.5 g/t cut off grade comprising of an Indicated Resource of 41.8 Mt at an average grade of 1.51 g/t Au for 2.03 Moz of gold and an Inferred Resource of 10.2 Mt at an average grade of 1.32 g/t Au for 0.43Moz of gold in accordance with the Canadian Institute of Mining, Metallurgy and Petrology Definitions Standards ("CIM Code") for Reporting of Mineral Resources and Ore Reserves. The Group has also published a NI43-101 compliant Inferred Resource on its Dugbe F deposit of 43.01 million tonnes at 1.28 g/t Au to give 1,764,000 ounces of gold using a lower cut-off grade of 0.5 g/t Au and no upper cut-off grade.

In Q3 2014, the Group is due to release a Detailed Feasibility Study and Front End Engineering Design.  The Group's licence areas constitute a significant proportion of eastern Liberia's Birimian sequence.

For more information, please visit www.hummingbirdresources.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUAVKRSWAOAAR
Date   Source Headline
25th Apr 20247:00 amRNSQ1 2024 Operational and Trading Update
19th Apr 20247:00 amRNSNotice of Q1-2024 Operational and Trading Update
16th Apr 20247:00 amRNSOperation Update & Kouroussa Production Roadmap
28th Mar 20247:00 amRNSUpdate of Mining Operations at Kouroussa
20th Mar 20243:26 pmRNSResponse to Corica Mining Statement
18th Mar 20249:32 amRNSUpdate on Mining Operations at Kouroussa
11th Mar 20248:00 amRNSBlock Listing Six Monthly Return
27th Feb 20247:00 amRNSPasofino Gold announces exploration update
5th Feb 20248:00 amRNSUpdated Corporate Presentation
31st Jan 20247:00 amRNSQ4-2023 Operational and Trading Update
25th Jan 20247:00 amRNSKouroussa Mine Update/Notice of Q4 Trading Update
24th Jan 20247:00 amRNSPasofino Gold Announces US$2.3m Private Placement
19th Jan 202412:47 pmRNSNotification of Major Holdings
10th Jan 20242:21 pmRNSResult of GM, Director Dealing and TVR
10th Jan 20247:00 amRNSResult of Open Offer and Director Dealing
21st Dec 20237:00 amRNSPlacement Update, Open Offer & Notice of GM
21st Dec 20237:00 amRNSOperational and Exploration Update
13th Dec 20237:00 amRNSCompletion of Pasofino Gold to 51% interest
7th Dec 20237:00 amRNSCorporate strategy update, equity placement & TVR
16th Nov 20237:00 amRNSUpdated Corporate Presentation
26th Oct 20237:00 amRNSQ3-2023 Operational and Trading Update
19th Oct 20237:00 amRNSNotice of Q3-2023 Operational and Trading Update
10th Oct 20237:00 amRNSUpdate Interview with Senior Management
28th Sep 20237:00 amRNS1H23 Group Interim Results
13th Sep 20237:00 amRNS2023 Updated Reserves and Resources Statements
11th Sep 20237:00 amRNSBlock Listing Six Monthly Return
25th Jul 20237:30 amRNSQ2 2023 Operational Trading Update Presentation
25th Jul 20237:00 amRNSQ2 2023 Operational and Trading Update
13th Jul 20237:00 amRNSNotice of Second Quarter Trading Update
29th Jun 202310:12 amRNSResult of AGM
29th Jun 20237:00 amRNS2023 AGM Statement
9th Jun 20237:00 amRNSFirst Gold Pour at Kouroussa Gold Mine
6th Jun 20237:00 amRNSPublication of Annual Report
6th Jun 20237:00 amRNSPublication of Sustainability Report 2022
5th Jun 20237:00 amRNSUpdated Corporate Presentation
22nd May 20237:00 amRNSKouroussa Gold Mine Commissioning Update
2nd May 20237:00 amRNSKouroussa Gold Mine Commissioning Begins
19th Apr 20237:30 amRNSMedia presentation of Q1 2023 Operational Update
19th Apr 20237:00 amRNSQ1 2023 Operational and Trading Update
18th Apr 202311:37 amRNSAIM Rule 17
31st Mar 20237:00 amRNS2023 LTIP & Deferred Share Awards and TVR
20th Mar 20239:05 amRNSSecond Price Monitoring Extn
20th Mar 20239:00 amRNSPrice Monitoring Extension
13th Mar 20232:54 pmRNSResult of General Meeting, Director Dealing & TVR
10th Mar 20237:30 amRNSKouroussa Gold Mine, Construction Media Update
10th Mar 20237:05 amRNSBlock Listing Six Monthly Return
10th Mar 20237:00 amRNSResult of Open Offer and Director Dealing
7th Mar 20232:05 pmRNSSecond Price Monitoring Extn
7th Mar 20232:00 pmRNSPrice Monitoring Extension
2nd Mar 202311:36 amRNSNotification of Major Holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.