Updated Resource and Reserve Estimates for MNV

5 May 2017 07:00

RNS Number : 2244E
Highland Gold Mining Limited
05 May 2017
 

HIGHLAND GOLD MINING LIMITED

 

05 May 2017

 

Updated Resource and Reserve Estimates for MNV

 

 

Highland Gold Mining Limited ("Highland Gold" or the "Company", AIM: HGM) is pleased to announce the results of updated JORC-compliant Mineral Resource and Ore Reserve estimates for its Mnogovershinnoye (MNV) mine, conducted by Micon International Co Limited.

 

The Mineral Resource and Ore Reserve estimates take into account data from the extensive near-mine exploration programme conducted at MNV in 2016, which included over 14,000 metres of diamond drilling. The data supports the extension of MNV's life of mine to 2022, as announced earlier this year.

 

Total Ore Reserves increased to 500,400 oz, compared to 245,618 oz previously estimated to remain from the last reserve audit conducted in 2012 and reported in the Company's 2016 Annual Report.

 

Mineral Resources of the Mnogovershinnoye Gold Deposit

in accordance with the JORC Code (2012) as of 01 January 2017

 

Tonnage

(kt)

Average Grade

(g/t Au)

Gold

(kg)

Gold

(oz)

Indicated

2,339

7.3

17,091

549,400

Inferred

341

7.5

2,560

82,320

Total (Indicated + Inferred)

2,680

7.3

19,651

631,720

 

 

Ore Reserves of the Mnogovershinnoye Gold Deposit

in accordance with the guidelines of the JORC Code (2012) as of 01 January 2017

 

Ore

(kt)

Grade

(g/t Au)

Gold

(kg)

Gold

(oz)

Probable

Open Pit

113

5.7

647

20,800

Underground

2,871

5.2

14,916

479,600

Total

2,984

5.2

15,563

500,400

 

Mineral Resources and Ore Reserves are diluted and based upon a gold price of US$1,200 per ounce. The cut-off grade for open pit mining is 1 g/t Au and for underground mining is 2 g/t.

 

Mineral Resources were reduced to 631,720 oz, compared to the 1.6 million oz reported in the 2016 Annual Report, as a result of employing a different approach to modelling and a higher cut-off grade. This was done with the goal of optimising resources under both Russian and international standards, and therefore omits resources with grades of lower than 2 g/t for underground mining.

 

Due to the geological complexity of mineralisation, Micon has exercised further caution by assigning Mineral Resources to the Indicated and Inferred categories, and Ore Reserves to the Probable category.

 

The Company is carrying out additional surface and underground exploration at several of the ore bodies at MNV in 2017 with a view toward further increase reserves and extending the life of mine beyond 2022. In addition, 4,300 m of drilling is planned at the satellite Bear ore zone to the north this year. This exploration programme has the potential to upgrade the current MNV Mineral Resources and Reserves.

 

The resource estimate does not include MNV's historic rock waste dumps, which the Company has been evaluating separately on an ongoing basis. Since the beginning of 2016, the Company has taken about 400k tonnes of ore from the rock dumps, with an average grade of ~1.1 g/t, for processing at the MNV mill.

 

Information contained in this release has been taken from the "Independent Expert's Report on the Resources and Reserves of the Mnogovershinnoye Gold Deposit, Khabarovsk Region, Russian Federation", prepared in compliance to the JORC Code 2012 by a panel of qualified industry experts of Micon International Co Limited. The report has been signed off by Mr Stanley Bartlett, who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration to qualify as Competent Persons as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves".

 

 

FOR FURTHER INFORMATION PLEASE CONTACT:

Highland Gold

John Mann, Head of Communications+ 7 495 424 95 21Duncan Baxter, Non-Executive Director+ 44 (0) 1534 814 202

Numis Securities Limited(Nominated Adviser and Broker)

John Prior, James Black

Paul Gillam

+44 (0) 207 260 1000

 

Peat & Co(Joint Broker)

Charlie Peat+44 (0) 207 104 2334

 

 

***

 

 

Glossary

 

JORC - Widely accepted standard for reporting mineral resources and ore reserves established by the Australasian Joint Ore Reserves Committee.

 

Mineral Resource - concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

 

Inferred Mineral Resource- that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

 

Indicated Mineral Resource - that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

 

Measured Mineral Resource- that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

 

Ore Reserve - the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mined.

 

Probable Ore Reserve - the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

 

Proven Ore Reserve - is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBXGDUCGGBGRS
Date   Source Headline
14th Feb 20117:00 amRNSSignificant shareholding
11th Feb 20114:45 pmRNSBlocklisting 6 monthly return
26th Jan 20117:00 amRNSTrading Statement
21st Dec 20107:00 amRNSDrilling Report
9th Nov 20107:00 amRNSProject Start Up
4th Oct 20107:00 amRNSHolding(s) in Company
1st Oct 20107:00 amRNSChange of Adviser
17th Sep 20104:35 pmRNSPrice Monitoring Extension
17th Sep 20107:00 amRNSDirectorate Change
13th Aug 201012:27 pmRNSBlocklisting Interim Review
12th Aug 20107:00 amRNSTrading Statement August 2010
2nd Aug 20107:00 amRNSKyrgyzstan Exploration Activities
19th Jul 20107:00 amRNSAcquisition of Exploration and Production Rights
6th Jul 20107:00 amRNSJoint Broker Appointment
22nd Jun 20107:00 amRNSSale of shares
18th Jun 20107:00 amRNSAGM Statement
30th Apr 20107:00 amRNSAnnual Results 2009
3rd Mar 20107:00 amRNSNovo Update March 2010
2nd Mar 201011:03 amRNSChange of Advisor
22nd Feb 201012:00 pmRNSNew Acquisition
3rd Feb 201012:19 pmRNSBlocklisting Interim Review
3rd Feb 20107:00 amRNSTrading Statement
10th Dec 20097:00 amRNSDirectorate Change
9th Nov 200910:37 amRNSCorrection to earlier announcement
3rd Nov 20097:00 amRNSSignificant Results
1st Oct 200910:42 amRNSCommissioning of Novoshirokinskoye Mine
22nd Sep 20097:00 amRNSInterim Results September, 2009
1st Sep 20097:00 amRNSDirectorate Change
10th Aug 20093:51 pmRNSBlocklisting Interim Review
6th Aug 20097:00 amRNSTrading Statement
28th Jul 20094:40 pmRNSSecond Price Monitoring Extn
28th Jul 20094:35 pmRNSPrice Monitoring Extension
10th Jul 20094:40 pmRNSSecond Price Monitoring Extn
10th Jul 20094:35 pmRNSPrice Monitoring Extension
18th Jun 200912:12 pmRNSAGM Statement
6th May 20094:40 pmRNSSecond Price Monitoring Extn
6th May 20094:35 pmRNSPrice Monitoring Extension
30th Apr 20094:40 pmRNSSecond Price Monitoring Extn
30th Apr 20094:35 pmRNSPrice Monitoring Extension
30th Apr 20097:00 amRNSAnnual Financial Report
29th Apr 20097:00 amRNSDisposal
29th Apr 20097:00 amRNSAcquisition of Mayskoye deposit
31st Mar 20099:55 amRNSNew Appointments
5th Feb 20097:00 amRNSTrading Update February, 2009
3rd Feb 20093:41 pmRNSBlocklisting Interim Review
26th Jan 20094:40 pmRNSSecond Price Monitoring Extn
26th Jan 20094:35 pmRNSPrice Monitoring Extension
14th Jan 20094:40 pmRNSSecond Price Monitoring Extn
14th Jan 20094:35 pmRNSPrice Monitoring Extension
13th Jan 20093:00 pmRNSSignificant Shareholding January, 2009

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.