focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Updated Resource and Reserve Estimates for MNV

5 May 2017 07:00

RNS Number : 2244E
Highland Gold Mining Limited
05 May 2017
 

HIGHLAND GOLD MINING LIMITED

 

05 May 2017

 

Updated Resource and Reserve Estimates for MNV

 

 

Highland Gold Mining Limited ("Highland Gold" or the "Company", AIM: HGM) is pleased to announce the results of updated JORC-compliant Mineral Resource and Ore Reserve estimates for its Mnogovershinnoye (MNV) mine, conducted by Micon International Co Limited.

 

The Mineral Resource and Ore Reserve estimates take into account data from the extensive near-mine exploration programme conducted at MNV in 2016, which included over 14,000 metres of diamond drilling. The data supports the extension of MNV's life of mine to 2022, as announced earlier this year.

 

Total Ore Reserves increased to 500,400 oz, compared to 245,618 oz previously estimated to remain from the last reserve audit conducted in 2012 and reported in the Company's 2016 Annual Report.

 

Mineral Resources of the Mnogovershinnoye Gold Deposit

in accordance with the JORC Code (2012) as of 01 January 2017

 

Tonnage

(kt)

Average Grade

(g/t Au)

Gold

(kg)

Gold

(oz)

Indicated

2,339

7.3

17,091

549,400

Inferred

341

7.5

2,560

82,320

Total (Indicated + Inferred)

2,680

7.3

19,651

631,720

 

 

Ore Reserves of the Mnogovershinnoye Gold Deposit

in accordance with the guidelines of the JORC Code (2012) as of 01 January 2017

 

Ore

(kt)

Grade

(g/t Au)

Gold

(kg)

Gold

(oz)

Probable

Open Pit

113

5.7

647

20,800

Underground

2,871

5.2

14,916

479,600

Total

2,984

5.2

15,563

500,400

 

Mineral Resources and Ore Reserves are diluted and based upon a gold price of US$1,200 per ounce. The cut-off grade for open pit mining is 1 g/t Au and for underground mining is 2 g/t.

 

Mineral Resources were reduced to 631,720 oz, compared to the 1.6 million oz reported in the 2016 Annual Report, as a result of employing a different approach to modelling and a higher cut-off grade. This was done with the goal of optimising resources under both Russian and international standards, and therefore omits resources with grades of lower than 2 g/t for underground mining.

 

Due to the geological complexity of mineralisation, Micon has exercised further caution by assigning Mineral Resources to the Indicated and Inferred categories, and Ore Reserves to the Probable category.

 

The Company is carrying out additional surface and underground exploration at several of the ore bodies at MNV in 2017 with a view toward further increase reserves and extending the life of mine beyond 2022. In addition, 4,300 m of drilling is planned at the satellite Bear ore zone to the north this year. This exploration programme has the potential to upgrade the current MNV Mineral Resources and Reserves.

 

The resource estimate does not include MNV's historic rock waste dumps, which the Company has been evaluating separately on an ongoing basis. Since the beginning of 2016, the Company has taken about 400k tonnes of ore from the rock dumps, with an average grade of ~1.1 g/t, for processing at the MNV mill.

 

Information contained in this release has been taken from the "Independent Expert's Report on the Resources and Reserves of the Mnogovershinnoye Gold Deposit, Khabarovsk Region, Russian Federation", prepared in compliance to the JORC Code 2012 by a panel of qualified industry experts of Micon International Co Limited. The report has been signed off by Mr Stanley Bartlett, who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration to qualify as Competent Persons as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves".

 

 

FOR FURTHER INFORMATION PLEASE CONTACT:

Highland Gold

John Mann, Head of Communications+ 7 495 424 95 21Duncan Baxter, Non-Executive Director+ 44 (0) 1534 814 202

Numis Securities Limited(Nominated Adviser and Broker)

John Prior, James Black

Paul Gillam

+44 (0) 207 260 1000

 

Peat & Co(Joint Broker)

Charlie Peat+44 (0) 207 104 2334

 

 

***

 

 

Glossary

 

JORC - Widely accepted standard for reporting mineral resources and ore reserves established by the Australasian Joint Ore Reserves Committee.

 

Mineral Resource - concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

 

Inferred Mineral Resource- that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

 

Indicated Mineral Resource - that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

 

Measured Mineral Resource- that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

 

Ore Reserve - the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mined.

 

Probable Ore Reserve - the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

 

Proven Ore Reserve - is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBXGDUCGGBGRS
Date   Source Headline
24th May 20182:28 pmRNSResult of Annual General Meeting
4th May 20187:00 amRNSMailing of 2017 Annual Report and Notice of AGM
30th Apr 20187:00 amRNSQ1 2018 Operating Results
26th Apr 20187:00 amRNSAgreement to Purchase Gold Assets in Chukotka
17th Apr 20187:00 amRNS2017 Final Results
11th Apr 20187:38 amRNSFull Year Results Announcement Date
22nd Feb 20188:47 amRNSResources and Reserves Update as at 31 Dec 2017
7th Feb 20187:00 amRNSBelaya Gora/Blagodatnoye PFS and Resource Update
6th Feb 20187:00 amRNSKekura Feasibility Study and Resource Update
5th Feb 20187:00 amRNSBlock listing Interim Review
18th Jan 20187:00 amRNSQ4 2017 Operating Results
13th Dec 20177:00 amRNSBoard of Directors Adopts Dividend Policy
30th Nov 20174:33 pmRNSHolding(s) in Company
20th Nov 20177:00 amRNSUpdated Resource and Reserve Estimates for Novo
9th Nov 201710:17 amRNSAppointment of Chief Operating Officer
11th Oct 20177:00 amRNSQ3 2017 Operating Results
9th Oct 20178:56 amRNSAppointment of Joint Corporate Broker
18th Sep 20173:42 pmRNSHolding(s) in Company
4th Sep 20177:00 amRNSInterim Results Announcement for H1 2017
30th Aug 20177:00 amRNSInterim Results Announcement Date
3rd Aug 20177:00 amRNSBlock listing Interim Review
24th Jul 20177:00 amRNSQ2 2017 Operating Results
5th Jun 20177:00 amRNSCompany Cleared to Proceed with Kekura Development
22nd May 20177:00 amRNSNew Exploration Licences Adjacent to MNV
17th May 20171:11 pmRNSResult of AGM
5th May 20177:00 amRNSDirector/PDMR Shareholding
5th May 20177:00 amRNSUpdated Resource and Reserve Estimates for MNV
28th Apr 201710:32 amRNSMailing of 2016 Annual Report and Notice of AGM
27th Apr 20177:01 amRNSQ1 2017 Operating Results
10th Apr 20177:00 amRNS2016 Final Results
4th Apr 20177:00 amRNSNotice of Results
20th Mar 20177:04 amRNSUnkurtash Scoping Study
1st Mar 20171:25 pmRNSDirector/PDMR Shareholding
21st Feb 20174:06 pmRNSHolding(s) in Company
3rd Feb 20177:00 amRNSBlock listing Interim Review
26th Jan 20179:03 amRNSQ4 2016 Operating Results
9th Nov 20167:00 amRNSDirector/PDMR Shareholding
3rd Nov 20167:00 amRNSQ3 2016 Operating Results
26th Sep 20167:00 amRNSInterim Results Announcement for H1 2016
23rd Sep 20162:54 pmRNSInterim Results Announcement Date
5th Sep 20167:00 amRNSAgreements Signed for State Support of Kekura
9th Aug 20168:30 amRNSQ2 2016 Operating Results (Replacement)
9th Aug 20167:00 amRNSQ2 2016 Operating Results
3rd Aug 20167:00 amRNSBlock listing Interim Review
25th May 201612:00 pmRNSResult of AGM
23rd May 20167:00 amRNSQ1 2016 Operating Results
19th May 20167:00 amRNSKekura Project Update
20th Apr 20167:00 amRNS2015 Final Results
15th Apr 20162:18 pmRNSNotice of Results
3rd Feb 20167:00 amRNSBlocklisting Interim Review

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.