Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHerencia Resources Regulatory News (HER)

  • There is currently no data for HER

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining Inventory Upgraded for Paguanta Project

7 Oct 2010 09:38

RNS Number : 0115U
Herencia Resources PLC
07 October 2010
 



Herencia Resources plc

("Herencia" or the "Company")

Mining Inventory Upgraded

(Paguanta Project in Northern Chile)

Highlights:

·; Underground mining inventory upgraded for Paguanta Project

·; 1.66 Mt at 6.1% Zinc, 2.0% lead, 154 ppm silver and 0.26 ppm gold

·; Gold grades estimated for the first time

·; Mineralised veins remain open in all directions

·; DMS test work completed

Herencia Resources Plc (AIM: HER) is pleased to announce the updated underground mining inventory for the Paguanta Project in northern Chile. The new 2010 mining inventory estimated by Golder Associates, incorporating the results from the 2010 drilling program, has been significantly increased when compared to that estimated in the 2008 Scoping Study, also prepared by Golder Associates:

Mt

Zn (%)

Pb (%)

Ag (ppm)

Au (ppm)

 2008 Paguanta Underground Mining Inventory

1.24

5.3

1.8

102

n/a

 2010 Paguanta Underground Mining Inventory

1.66

6.1

2.0

154

0.26

 % Increase (to tonnes and grade)

33%

15%

11%

51%

n/a

 Increase to in-situ metal inventory

54%

49%

102%

n/a

Notes:

·; The mining inventory includes an allowance for 15% mining dilution (at 2.55% Zn; 1.24% Pb and 80ppm Ag) and an allowance for 15% mining loss. 

·; The open pit mining inventory of 1.43Mt at 2% zinc, 0.9% lead and 48ppm silver (as announced to the market on 23 December 2008), has not been updated at this time as this was not the objective of the 2010 drill program. An update to the open pit potential will be undertaken as part of the Feasibility Study.

·; Note that a mining inventory is not a Mineral Reserve Estimate as a Feasibility Study has yet to be undertaken on the Project.

As can be seen in the table above, the tonnage has increased by 33% and significantly the in-situ metal inventory has increased by 54% for zinc, 49% for lead and 102% for silver. These increases have been achieved in 2010 with only 5,728m of additional drilling.

The Company also advises that the Dense Media Separation (DMS) test work has now been completed. Overall, all samples responded to density separation for zinc, lead and silver upgrading though the results indicate that additional test-work will be required before a final decision is made on DMS. The Company proposes to include DMS as part of the scope of the Feasibility Study to determine the technical and economic viability of incorporating DMS into the final processing flow-sheet for Paguanta.

Summarising a successful 2010 program at Paguanta, Managing Director Michael Bohm stated:

"It is very pleasing to round out the technical phase of the 2010 program with such a significant upgrade to our underground mining inventory.

To see such a positive uplift in both tonnage and grade, augers well for our goal of achieving an initial stage one mine life of 5 years at an anticipated 400,000 tpa ore throughput.

2010 has been an excellent year for the Company. Added to the numerous milestones achieved in advancing the Paguanta Project toward development, we have also added the high grade 'Doris' copper-silver prospect to our asset base, welcomed global metals group Nyrstar onto the shareholder register and seen commodity prices either consolidate, or in the case of silver, rise significantly.

We will now review all the information on hand with a view to making a decision on both the Feasibility Study and further work programs at Doris, by year end."

 

References in this announcement to exploration results and potential have been approved for release by Mr Michael Bohm (BAppSc Mining Engineering WASM) and Mr Antonio Valverde (Bsc Geology Universidad Complutense de Madrid), both with more than 15 years' relevant experience in the field of activity concerned. Mr Bohm is a Member of the Australasian Institute of Mining and Metallurgy. Both Mr Bohm and Mr Valverde have consented to the inclusion of the material in the form and context in which it appears.

 

Enquiries:

Herencia Resources plc

Michael Bohm

+61 8 9211 0600

WH Ireland Limited

Katy Mitchell

+44 161 832 2174

City Profile

Simon Courtenay

+44 207 448 3244

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFVTIDLDIII
Date   Source Headline
3rd Apr 200810:40 amRNSTarget Identified at Paguanta
25th Mar 20086:03 pmRNSFinal Results
18th Mar 200810:27 amRNSChange of Registered Office
28th Feb 200810:58 amRNSFocus on the Paguanta Project
12th Feb 20081:32 pmRNSDrilling Report
3rd Jan 200812:29 pmRNSDirector/PDMR Shareholding
30th Nov 200711:07 amRNSIssue of Options
30th Nov 200710:08 amRNSTotal Voting Rights
28th Nov 20073:19 pmRNSHolding(s) in Company
6th Nov 20074:56 pmRNSDirector/PDMR Shareholding
1st Nov 20073:05 pmRNSIssue of Equity
31st Oct 20078:15 amRNSTotal Voting Rights
23rd Oct 200710:45 amRNSJoint Venture Agreement
15th Oct 20074:23 pmRNSResult of AGM
12th Oct 20074:21 pmRNSHolding(s) in Company
5th Oct 200710:52 amRNSDrilling Report
27th Sep 20074:03 pmRNSIssue of Equity
19th Sep 200710:28 amRNSDrilling Report
18th Sep 200712:31 pmRNSInterim Results
14th Sep 20073:23 pmRNSNotice of AGM
11th Sep 20077:00 amRNSShareholding in Herencia
4th Sep 200711:01 amRNSDrilling Report
13th Aug 200710:25 amRNSAIM Rule 26
1st Aug 200710:41 amRNSDrilling Report
18th Jul 200710:44 amRNSDrilling Report
22nd Jun 20071:07 pmRNSInterim Results
18th May 20079:12 amRNSDirectorate Change
5th Apr 20074:29 pmRNSNew Accounting Ref Date
5th Apr 200710:03 amRNSIssue of Options
30th Mar 20077:00 amRNSTotal Voting Rights
29th Mar 20077:00 amRNSInterim Results
26th Mar 20075:30 pmRNSHolding(s) in Company
22nd Mar 20079:36 amRNSHolding(s) in Company
13th Mar 20073:15 pmRNSIssue of Equity
21st Feb 20073:57 pmRNSDrilling Report
25th Jan 20078:06 amRNSDrilling Report
28th Dec 20068:00 amRNSTotal Voting Rights
16th Nov 20068:41 amRNSFinal Results
30th Oct 200610:42 amRNSPlacing
25th Oct 20063:26 pmRNSSubscription Agmt & Placing
4th Oct 20062:15 pmRNSAlliance Agreement
13th Sep 200611:26 amRNSDirectorate Change
24th Aug 20064:30 pmRNSProject & Exploration Update
24th Aug 20062:53 pmRNSChange of Adviser
26th Jul 20063:01 pmRNSResult of AGM
10th Jul 20063:49 pmRNSIssue of Equity
19th Jun 20063:54 pmRNSDirectorate Change
13th Jun 20064:19 pmRNSProject update
2nd May 200611:40 amRNSDrilling Report
24th Mar 20067:02 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.