Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHelium One Regulatory News (HE1)

Share Price Information for Helium One (HE1)

Share Price is delayed by 15 minutes
Get Live Data
0.565    0.055 (10.09%)
Bid:
0.55
Ask:
0.58
Spread: 0.03 (5.455%)
Market Cap: £59.16m
HE1 Live PriceLast checked at - London Stock Exchange

Intraday Helium One Share Chart

Operational update

15 Nov 2023 07:00

RNS Number : 4606T
Helium One Global Ltd
15 November 2023
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as amended by The Market Abuse (Amendment) (EU Exit) Regulations 2019.

 

15 November 2023

 

 

Helium One Global Ltd

("Helium One" or "the Company")

 

Operational update

Helium One Global (AIM: HE1), the primary helium explorer in Tanzania, is pleased to provide the following update on Tai-3 operations.

 

Highlights

· The Company has now successfully pulled the drill string out of hole at Tai-3

· Wireline operations and initial logging underway

· Downhole sampling to commence once logging is complete, with capability for onsite analysis

 

Details

The Company has successfully pulled the drill string out of hole at the Tai-3 well. This was achieved by isolating and repositioning various components of the iron rough neck and, whilst this does not represent a long-term solution to the rig problems, it has enabled the Company to safely retrieve the drill pipe and bottom hole assembly, comprising of the heavy weight drill pipe and drill collars, from the hole.

The hole conditions remain good, and after removal of the drill string, the Company took the opportunity to move directly to wireline operations, as this does not place any reliance on the rig's hydraulics nor the iron rough neck. The logging tools from the initial logging run encountered some washouts and ledges in the Lower Karoo, therefore the tools were only able to reach 1,430m MD and not to TD at 1,448m MD.

Helium One plans to commence a downhole sampling programme shortly, using a Baker Hughes Reservoir Characterisation Instrument that is designed to obtain gas samples from identified zones of interest under reservoir conditions. If the sampling is successful, Helium One have the capability to transfer and evaluate these samples at the wellsite using field pressure-volume-temperature analysis in order to determine the gas composition.

The Company is currently still determining the timelines required for a full rig repair. But the priority at this stage is to complete the wireline logging and acquire downhole samples. The samples will then be evaluated at site so that an informed decision with respect to Helium One's forward operational programme can be made.

The Company will provide further updates on the sampling and the forward operational programme in due course.

 

Lorna Blaisse, Chief Executive Officer, commented:

"The team at site have done an outstanding job working innovatively and proactively to ensure we were able to safely pull the drill string out of the hole. This surpassed all expectations and we're delighted to now be in the position of having commenced wireline operations and planning downhole sampling to fully evaluate the Tai-3 well.

Whilst the setback with the rig is incredibly frustrating, we have overcome a number of operational hurdles and remain focussed and confident that when the rig is back up and running, we will be in a stronger position for future wells."

 

James Smith, Non-Executive Chairman, commented:

"This is an incredibly dynamic situation, and whilst we continue to work towards evaluating the repairs required to the Epiroc Predator 220 drilling rig, and the timeline required to deliver these repairs, we are pleased to provide this update to our shareholders.

Since Friday, we have done all we possibly could to move Tai-3 operations forward, and everyone has worked exceptionally hard to get to this point. Once we have obtained and assessed downhole samples and determined the extent and timing of the necessary rig repairs, we will be able to provide an updated forward operational programme."

 

For further information please visit the Company's website: www.helium-one.com

Contact

Helium One Global Ltd

Lorna Blaisse, CEO

+44 20 7920 3150

 

Liberum Capital Limited (Nominated Adviser and Joint Broker)

Scott Mathieson

Ed Thomas

Nikhil Varghese

+44 20 3100 2000

 

Peterhouse Capital Limited (Joint Broker)

Lucy Williams

+44 20 7220 9792

 

Tavistock (Financial PR)

Nick Elwes

Tara Vivian - Neal

+44 20 7920 3150

 

 

 

 

Notes to Editors

Helium One Global, the AIM-listed Tanzanian explorer, holds prospecting licences totalling more than 2,965km2 across three distinct project areas, with the potential to become a strategic player in resolving a supply-constrained helium market.

The Rukwa, Balangida, and Eyasi projects are located within rift basins on the margin of the Tanzanian Craton in the north and southwest of the country. The assets lie near surface seeps with helium concentrations ranging up to 10.6% He by volume. All Helium One's licences are held on a 100% equity basis and are in close proximity to the required infrastructure.

The Company's flagship Rukwa Project is located within the Rukwa Rift Basin covering 1,900km2 in south-west Tanzania. The project is considered to be an advanced exploration project with leads and prospects defined by a subsurface database including multispectral satellite spectroscopy, airborne gravity gradiometry, 2D seismic data, and QEMSCAN analysis. The Rukwa Project has been de-risked by the 2021 drilling campaign, which identified reservoir and seal with multiple prospective intervals from basin to near surface within a working helium system.

Helium One is listed on the AIM market of the London Stock Exchange with the ticker of HE1 and on the OTCQB in the United States with the ticker HLOGF.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGPGWAGUPWPUC
Date   Source Headline
22nd Apr 20257:00 amRNSHelium and CO2 Plant Construction Permit Approved
16th Apr 20257:00 amRNSJackson-27 Spud at Galactica Project
10th Apr 20257:00 amRNSJackson-29 Well Drilled to TD & Free Gas Confirmed
4th Apr 20258:33 amRNSJackson-29 Operational Update
1st Apr 20257:00 amRNSJackson-4 Flow Testing and Gas Sampling Analysis
31st Mar 20257:00 amRNSJackson-29 Spud at Galactica Project
31st Mar 20257:00 amRNSSouthern Rukwa Mining Licence – Formal Acceptance
24th Mar 202510:39 amRNSBlocklisting Six Monthly Return
24th Mar 20257:00 amRNSJackson-4 Well Drilled to TD & Free Gas Confirmed
21st Mar 20257:00 amRNSUnaudited Interim Results
18th Mar 20257:00 amRNSJackson-4 Intermediate Section Drilling Complete
14th Mar 20257:00 amRNSJackson-31 Flow Testing and Gas Sampling Analysis
6th Mar 20257:00 amRNSState-16 Well, Galactica Project Update
5th Mar 20257:00 amRNSJackson-4 Spud at Galactica Project
3rd Mar 20257:00 amRNSCompany Receives Offer of Mining Licence
3rd Mar 20257:00 amRNSJackson-31 Well Drilled to TD & Free Gas Confirmed
26th Feb 20257:00 amRNSJackson-31 Intermediate Section Drilled
19th Feb 20257:00 amRNSJackson-31 Spud at Galactica Project
12th Feb 20257:00 amRNSJackson-31 Drilling Update Galactica Project
29th Jan 20257:00 amRNSJackson-31 Drilling Update Galactica Project
23rd Jan 202511:04 amRNSChange of Registered Office
15th Jan 20257:00 amRNSGalactica Project Drilling Update
23rd Dec 20247:00 amRNSDevelopment Drilling Update: Galactica Project
16th Dec 20241:17 pmRNSResults of AGM
13th Dec 20247:00 amRNSDevelopment Drilling Update Galactica Project
11th Dec 202411:01 amRNSIssue of Equity - Replacement
10th Dec 20247:00 amRNSIssue of Equity
20th Nov 20247:02 amRNSNotice of Annual General Meeting
20th Nov 20247:00 amRNSAudited Results for the year ended 30 June 2024
15th Nov 20247:00 amRNSGalactica-Pegasus Project Update
4th Nov 20247:01 amRNSDirectorate Change
4th Nov 20247:00 amRNSCompletion of Farm-In
17th Oct 20247:00 amRNSCompany Update
23rd Sep 20244:38 pmRNSBlocklisting Six Monthly Return
17th Sep 20247:00 amRNSCompany Update
4th Sep 20247:00 amRNSSustained helium flow at ITW-1
27th Aug 20247:01 amRNSAcquisition of He & CO2 project, and fundraise
27th Aug 20247:00 amRNSSuccessful EWT at ITW-1 flows up to 7.6% He
6th Aug 20247:00 amRNSSuccessful deepening of Itumbula West-1 well
29th Jul 20247:00 amRNSItumbula West-1 Commencement of Operations
17th Jul 20241:14 pmRNSDirectors Dealings
8th Jul 20243:16 pmRNS-RInvestor Presentation via Investor Meet Company
8th Jul 20247:00 amRNS-RNotice of focusIR Investor Webinar
1st Jul 20247:00 amRNSNominated Adviser and Joint Broker
1st Jul 20247:00 amRNSOperational Update
11th Jun 20247:00 amRNSResult of Placing and Subscription
10th Jun 20245:56 pmRNSProposed Placing of a minimum of £8.0 million
16th May 20247:00 amRNS-RAfrica Energies Summit
10th Apr 20247:00 amRNSRukwa Project update
22nd Mar 20247:00 amRNSBlocklisting Six Monthly Return

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.