Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGunsynd Regulatory News (GUN)

Share Price Information for Gunsynd (GUN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.135
Bid: 0.13
Ask: 0.14
Change: -0.02 (-12.90%)
Spread: 0.01 (7.692%)
Open: 0.155
High: 0.155
Low: 0.135
Prev. Close: 0.155
GUN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

10 Sep 2018 12:30

RNS Number : 2922A
Gunsynd PLC
10 September 2018
 

 

Gunsynd PLC

("Gunsynd" or the "Company")

 

Portland extended well test ("EWT") successfully completed, Kimmeridge EWT to commence

Horse Hill-1 ("HH-1") Portland and Kimmeridge oil discovery, Weald Basin, UK

 

Key Points:

 

· Final HH-1 Portland flow test sequence successfully completed, all Portland operational objectives achieved.

· Successful Portland re-perforation programme targeted 114 feet of oil pay, adding 14 feet of new pay. Following re-perforation, well productivity increased by up to 65%.

· Independent oil consultants Xodus Group's ("Xodus") analysis of flow and pressure data interprets that further HH-1 Portland vertical well optimisation could achieve a forecast sustainable initial 24/7 pumped rate of around 362 barrels of oil per day ("bopd")* when full scale long-term production commences, exceeding original estimates. This analysis is key as it establishes the absolute flow potential of the Portland reservoir for future production wells.

· Given the knowledge of the Portland's true flow potential, plans are now being formulated to drill either the HH-1z sidetrack or HH-2 new drill as a horizontal Portland appraisal well, with a targeted* sustainable daily production rate of 720 to 1,080 bopd, 2 to 3 times the forecast calculated* HH-1 vertical well rate of 362 bopd. All planning permissions, Environment Agency permits and the HH-2 well cellar are in place for a horizontal well. If successful it is envisaged that all future Portland production will be via horizontal wells.

· The Company's economic modelling indicates that HH-1 Portland is robustly commercial at even the lowest observed sustainable daily rate of 140 bopd and at oil prices below $60 per barrel. A formal Horse Hill Developments Ltd ("HHDL") declaration of Portland commerciality is therefore expected shortly following receipt of Xodus' final connected oil volume analysis. A planning application for long term production is planned to be submitted to Surrey County Council shortly, prior to the completion of the forthcoming Kimmeridge EWT programme expected at the end of the year. Full-scale long-term production, targeted for 2019, is subject to co-venturer and regulatory approvals.

· All 36° API Brent quality oil produced during the EWT is "dry", containing only 0.02% water.

· Preparation for the primary EWT objective, to establish the commerciality of the Kimmeridge Limestone 3 ("KL3") and KL4 oil pools underlying the Portland, has now commenced.

· Kimmeridge testing will begin in the uppermost KL4 oil pool immediately following the removal of two suspension plugs and installation of a new completion string straddling the two Kimmeridge oil pools.

Note: * There can be no absolute guarantee that forecast, targeted or calculated rates of production will be achieved.

 

 

Further to the announcements of 20 and 30 August 2018, while Gunsynd has conditionally disposed of its 2% interest in HHDL, the disposal has not yet completed. Once the disposal is completed, Gunsynd will no longer hold a direct interest in HHDL but will retain exposure to the project via share ownership in UK Oil and Gas Plc and Alba Mineral Resources plc.

 

The Company announces that HHDL, the operator of the HH-1 Kimmeridge and Portland oil discovery, located in licence PEDL137, has informed the Company that the final Portland EWT sequence has been successfully completed and that all Portland operational test objectives were achieved.

 

Following a final long duration pressure build up test, preparations for the primary Kimmeridge EWT are now underway. The Kimmeridge EWT's goal is to establish the commerciality of the underlying KL3 and KL4 oil pools, which in 2016 flowed 40° API crude naturally to surface at an aggregate implied stable dry oil rate of 1,365 bopd. Further updates will be provided as the Kimmeridge EWT progresses.

 

Additional EWT Information

 

In order to calculate the Portland oil volume connected to, or "seen by" HH-1, steady state flow conditions were required (i.e. stable; oil rate, gas oil ratio, bottom hole and tubing head pressures). Consequently, post perforation, production was restricted to sustainable 24/7 rates of between 140-160 bopd. It should be noted that these rates do not reflect the Portland's full flow potential that could be achieved either via successful further optimisation of the HH-1 vertical well or a new horizontal production well.

 

During these sustained flow periods, intermittent natural flow was evident, with metered rates at the separator exceeding the nominal pumped volume by up to 50 bopd, with the highest rate recorded of 191 bopd. Gas rates at the test separator and through the enclosed flare remained broadly constant at around 15,000 cubic feet per day.

 

Throughout testing, sustained pumped oil rates were recorded with stable bottom hole pressures of around 200 psi below the initial reservoir pressure of around 915 psi. Following shut-in periods, bottom hole pressures recovered rapidly back to initial reservoir pressure, indicating good connectivity within the Portland oil pool. The observed pressure response during the EWT is interpreted to have positive implications for oil recovery efficiency during planned future long-term production.

 

About Xodus

 

Xodus are an international, globally recognised consultancy group providing engineering and advisory services to clients in the oil & gas, LNG, renewables and utilities industries worldwide. They are certified as Competent Persons for the purposes of oil and gas resource and reserve assessments. More details can be found at www.xodusgroup.com

 

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

The directors of Gunsynd accept responsibility for this announcement.

 

For further information, please contact:

 

Gunsynd plc

Hamish Harris

 

+44 20 7440 0640

Cairn Financial Advisers LLP

James Caithie / Liam Murray

 

+44 20 7213 0880

Peterhouse Corporate Finance

Lucy Williams

 

+44 20 7469 0930

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCGGUMUBUPRGGU
Date   Source Headline
9th Apr 20157:00 amRNSSignificant upgrade to the Horse Hill discovery
2nd Apr 20154:26 pmRNSGrant of Options
1st Apr 20153:08 pmRNSInterim Results
20th Mar 201512:15 pmRNSHolding(s) in Company
19th Mar 20157:00 amRNSInvestments and Implementation of Investing Policy
12th Feb 20157:00 amRNSUpdate - Tungsten Mining Operations, Brazil
22nd Jan 20157:00 amRNSUpdate - Tungsten Mining Operations, Brazil
21st Jan 201511:08 amRNSPosting of Report and Accounts
20th Jan 20154:57 pmRNSFinal Results
19th Jan 20152:38 pmRNSHolding(s) in Company
18th Dec 20147:00 amRNSInvestment in Producing Tungsten Mining Operation
8th Dec 20147:00 amRNSIssue of Equity
1st Oct 20143:53 pmRNSDirectorate Change
12th Sep 20141:04 pmRNSResult of General Meeting
28th Aug 20144:00 pmRNSNotice of General Meeting
30th Apr 20147:00 amRNSInterim Results
20th Mar 20147:00 amRNSChange of Registered Office
19th Mar 20148:00 amRNSUpdate on disposal
18th Mar 20142:46 pmRNSUpdate on the Acquisition of Evocutis plc
13th Mar 20141:00 pmRNSUpdate of Evocutis plc acquisition
13th Mar 20141:00 pmRNSResult of AGM and General Meeting
26th Feb 20147:00 amRNSAcquisition of the trading assets of Evocutis PLC
26th Feb 20147:00 amRNSCirc re. Disposal and Notice of GM
18th Feb 20147:00 amRNSChange of Adviser
28th Jan 20147:00 amRNSFinal Results
3rd Dec 20133:56 pmRNSUpdate on Strategic Review
28th Oct 20132:40 pmRNSUpdate on Strategic Review
2nd Oct 20137:00 amRNSNotice of General Meeting and Strategic Review
30th Sep 201310:08 amRNSForm 8.5 (EPT/NON-RI)
24th Sep 20139:48 amRNSForm 8.5 (EPT/NON-RI)
23rd Sep 201311:05 amRNSForm 8.5 (EPT/NON-RI)
19th Sep 20139:42 amRNSForm 8.5 (EPT/NON-RI)
12th Sep 201311:24 amRNSForm 8.5 (EPT/NON-RI)
9th Sep 20138:31 amRNSForm 8.5 (EPT/NON-RI)
5th Sep 20132:29 pmRNSForm 8.5 (EPT/NON-RI) - Amendment
5th Sep 20131:35 pmRNSForm 8.5 (EPT/NON-RI)
2nd Sep 201310:33 amRNSForm 8.5 (EPT/NON-RI)
30th Aug 20138:42 amRNSForm 8.5 (EPT/NON-RI)
29th Aug 20138:29 amRNSForm 8.5 (EPT/NON-RI)
28th Aug 201310:26 amRNSForm 8.5 (EPT/NON-RI)
27th Aug 20134:33 pmRNSForm 8.5 (EPT/NON-RI)
21st Aug 20139:10 amRNSForm 8.5 (EPT/NON-RI)
20th Aug 20139:29 amRNSForm 8.5 (EPT/NON-RI)
19th Aug 20138:38 amRNSForm 8.5 (EPT/NON-RI)
16th Aug 20139:52 amRNSForm 8.5 (EPT/NON-RI)
13th Aug 201310:07 amRNSForm 8.5 (EPT/NON-RI)
12th Aug 20139:13 amRNSForm 8.5 (EPT/NON-RI)
9th Aug 20138:39 amRNSForm 8.5 (EPT/NON-RI)
2nd Aug 20139:00 amRNSForm 8.5 (EPT/NON-RI)
1st Aug 20139:13 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.