Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGoldstone Resources Regulatory News (GRL)

  • This share is currently suspended. It was suspended at a price of 2.15

Share Price Information for Goldstone Resources (GRL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.15
GRL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary in-country metallurgical test work

11 Dec 2017 07:00

RNS Number : 8930Y
Goldstone Resources Ltd
11 December 2017
 

11 December 2017

 

GOLDSTONE RESOURCES LIMITED

("GoldStone" or the "Company")

 

 

PRELIMINARY IN-COUNTRY METALLURGICAL TEST WORK

 

GoldStone Resources Limited (AIM: GRL) is pleased to announce the results of preliminary metallurgical test work on the AK01 proposed North and South pits on the Akrokerri licence, which have returned encouraging results and indicate the potential for heap leach processing of the oxide mineralisation. The Company is conducting preliminary metallurgical test work on samples obtained from the recent trenching to establish a range of potential processes for the development of the project.

 

Highlights

• Column tests show the AK01 oxide zone is extremely amenable to both the heap leach and to the CIL gold recovery processes

• Gravity recovered gold of 14.8% and 25.4% in the North and South Pit samples respectively

• Gold extraction from the tailings produced by the gravity tests were 90.2% and 93.5% for the North and South pit samples respectively using bottle roll test work with carbon1

• Column leach testing indicates moderate cement requirements, with 8 kg/tonne ("kg/t") addition rate enhancing the leaching efficiency and yielding acceptable column slump levels2

• Column leach testing over a 30 day period resulted in recoveries of some 82.6% and 84.7% for the North and South pit samples respectively with cement addition of 8 kg/t

Notes:

1. Samples pulverised to all passing 75 microns prior to leaching by sodium-cyanide solution both with and without carbon in bottle roll tests over 24 hour periods.

2. 4.5% & 3.3% column height slump in the North and South pit sample columns respectively utilising 8 kg/t binder material addition.

 

Preliminary Metallurgical Test Work on the AK01 North and South Pits for Oxide Heap Leaching

 

Preliminary metallurgical test work to assess the amenability of the oxide mineralisation to processing by heap leaching has been completed at the University of Mines and Technology (UMaT) in Tarkwa, Ghana under the supervision of Prof. Amankwah, the Dean of the Faculty of Mineral Resource Technology and Ghana's leading expert in the metallurgy of the Ashanti shear system.

 

The test work was undertaken to ascertain the elemental and mineralogical composition of the ore as well as its gravity recoverable gold and cyanide amenability. The test work included: head assays; sulphur and carbon speciation data; mineralogical composition, for 32 elements; gravity recoverable gold, to determine coarse gold presence; best leaching method using bottle rolls with and without carbon; and column leach testing.

 

The test work is regarded as preliminary as the samples were from the deep trenches, completed in September 2017, within the oxide zone of the AK01 North and South proposed pits, taken approximately 5 to 6 metres in depth below surface.

 

The head assays of the composite samples from the AK01 North and South pits averaged 1.74 g/t Au and 1.71 g/t Au respectively, utilising conventional fire assay.

 

 

Column Leach Test Work

 

The samples, 23 kg each, were agglomerated without any size reduction, using cement as a binder at addition rates of 6 kg/t and 8 kg/t prior to column leach testing with a diluted sodium-cyanide (NaCN) solution of 200 ppm, for a duration of 28 days and two additional days washing. The column leach test is an industry-standard method used to provide an indication of leaching performance in a scaled-up heap leach in the field.

 

Figure 1: http://www.rns-pdf.londonstockexchange.com/rns/8930Y_-2017-12-10.pdf

 

The test work indicated that the addition of cement at 8 kg/t yielded very good returns, with gold dissolution results amounting to some 82.6% and 84.7% for the North and South pits respectively, which is very encouraging, particularly when coupled with the rapid leach kinetics which saw an extraction level of greater than 70% achieved within 15 days, see Figure 2.

 

The slump levels achieved during the column leach test work ranged between 4.5% and 3.3% drop in column height from the North and South pit columns respectively, utilizing 8 kg/t cement addition. This would indicate that we have a competent ore that percolates well.

 

Figure 2: http://www.rns-pdf.londonstockexchange.com/rns/8930Y_1-2017-12-10.pdf

 

It is worth noting that following the completion of the column leach test work the calculated head grades were higher than the conventional assayed head grades of the respective pit samples. This might be due to the presence of coarse gold particles in the ore. The calculated head grades of the North and South pits averaged 2.73 g/t Au and 2.86 g/t Au respectively.

 

To confirm the presence of coarse gold and verify the calculated head grades, sub-samples were taken through screen fire assay. The results showed that the grades by screen fire assay were higher than the conventional fire assays and had a good correlation with the calculated head assays. Screen fire assaying results were 2.58 g/t Au and 2.78 g/t Au for the North and South pits respectively.

 

Whilst the potential presence of coarse gold particles is encouraging news, the Company is undertaking further checks by screen fire assaying composite samples taken from the recent RC drill chips at various depths within the oxide zone of the mineralised deposit. The results for which will be reported when available.

 

Goldstone's CEO, Emma Priestley commented:

"This preliminary test work on samples from the proposed pits is encouraging, showing that almost 90% of the recoverable gold via the heap leach method is achieved within the first 15 days of leaching. This indicates that a scale up to mine operation would be very successful. Whilst we are currently maintaining a bias towards oxide material, we are also maintaining focus to exploit the development of the higher grade sulphide zone."

 

Information in this announcement has been reviewed by Malcolm Crowe, an independent consultant with 45 years' experience in mining, minerals and mineral processing, of which some 15 years were spent at the Obuasi Gold Mine, now owned by AngloGold Ashanti. Malcolm is a Fellow of the Institute of Materials Minerals and Mining and a Chartered Engineer and accordingly, is a qualified person as required under the AIM Rules.

 

For further information, please contact:

 

GoldStone Resources Limited

 

Bill Trew / Emma Priestley

Tel: +44 (0)20 7830 9650

 

 

Strand Hanson Limited

 

Richard Tulloch / James Bellman

Tel: +44 (0)20 7409 3494

 

 

SI Capital Limited

 

Nick Emerson

Tel: +44 (0)1483 413 500

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR").

 

- END -

 

About GoldStone Resources Limited

 

GoldStone Resources Limited (AIM: GRL) is an AIM quoted exploration company with projects in Ghana, Senegal, and Gabon that range from grassroots to advanced exploration.

 

The Company is focused on developing the Homase-Akrokerri project in south-western Ghana, which hosts an existing 602,000 oz gold JORC Code compliant resource at an average grade of 1.77g/t, along strike from the Obuasi Gold Mine, one of the World's major gold mines with a total historical and current resource in excess of 70 million ounces of gold. It is the Company's intention to build a portfolio of high-quality gold projects in Ghana, with a particular focus on the highly prospective Ashanti Gold Belt.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCVBLFFDLFEFBX
Date   Source Headline
22nd Feb 20101:54 pmRNSProgress Report
22nd Jan 20107:00 amRNSDirectorate Change
10th Dec 20092:30 pmRNSHolding(s) in Company
30th Nov 20097:00 amRNSHalf Yearly Report
23rd Nov 20097:00 amRNSManso Amenfi Joint Venture
9th Nov 20093:55 pmRNSHolding(s) in Company
6th Nov 200912:48 pmRNSSenegal Exploration License Granted
2nd Nov 20097:00 amRNSChange of Registered Office
19th Oct 20097:00 amRNSGhanaian Joint Venture
12th Oct 20091:58 pmRNSHolding(s) in Company
7th Oct 200910:24 amRNSStmnt re Share Price Movement
24th Aug 200911:35 amRNSFinal Results
17th Aug 20093:41 pmRNSHolding(s) in Company
20th May 200910:08 amRNSDirectorate Change
17th Apr 20093:40 pmRNSUranium Project and Listing Update
2nd Mar 20093:59 pmRNSDirectorate Change
27th Feb 200912:18 pmRNSUranium Update
27th Nov 200812:07 pmRNSInterim Results
6th Oct 20085:21 pmRNSHolding(s) in Company
2nd Oct 200810:41 amRNSUranium Update
18th Sep 200810:25 amRNSHolding(s) in Company
16th Sep 200812:04 pmRNSHolding(s) in Company
15th Sep 20084:41 pmRNSHolding(s) in Company
4th Sep 20084:17 pmRNSHolding(s) in Company
15th Aug 200812:25 pmRNSGrant of Options
25th Jul 200812:08 pmRNSFinal Results - Correction
25th Jul 20087:00 amRNSFinal Results
8th Jul 20087:00 amRNSApplication for Indian Reconn
20th Jun 200811:17 amRNSUranium Project
16th Jun 20085:03 pmRNSHolding(s) in Company
12th Jun 20081:55 pmRNSHolding(s) in Company
10th Jun 20085:33 pmRNSHolding(s) in Company
6th Jun 20083:54 pmRNSHolding(s) in Company
5th Jun 20087:00 amRNSGrant of Exploration Permits
29th May 20083:49 pmRNSHolding(s) in Company
13th May 20081:38 pmRNSHolding(s) in Company
13th May 200810:08 amRNSApplication for Exploration P
29th Apr 200811:15 amRNSHolding(s) in Company
24th Apr 200812:47 pmRNSHolding(s) in Company
16th Apr 200812:47 pmRNSProgress Report
9th Apr 20084:48 pmRNSHolding(s) in Company
3rd Apr 20084:12 pmRNSHolding(s) in Company
2nd Apr 20084:43 pmRNSDirectorate Change
14th Mar 200810:16 amRNSHolding(s) in Company
7th Mar 20082:15 pmRNSProgress Report
28th Feb 20083:58 pmRNSHolding(s) in Company
20th Feb 200812:00 pmRNSProgress Report
29th Nov 20074:47 pmRNSInterim Results - Correction
29th Nov 200712:02 pmRNSInterim Results
1st Nov 20079:17 amRNSProgress Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.