Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Syria Operations Update

31 Jan 2012 07:00

RNS Number : 4371W
Gulfsands Petroleum PLC
31 January 2012
 



 

Immediate Release

31st January, 2012

 

 

 

GULFSANDS PETROLEUM PLC

 

Syria Operations Update

 

 

London, 31st January, 2012: Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Iraq, Tunisia, Italy and the U.S.A., is pleased to provide this update on operations in Syria.

 

Syria Operations Update

 

·; Results of Khurbet East 102 Triassic Appraisal Well

 

Drilling, logging and well testing operations have now concluded at the Khurbet East 102 ("KHE-102") well, an appraisal well which has tested the structural elevation, reservoir quality and reservoir fluids present in the Triassic Butmah and Kurrachine Dolomite Formations on the north flank of the field some 2.3 kilometres north of the Khurbet East 101 well ("KHE-101") drilled earlier in 2011. Originally spudded on October 13th 2011, KHE-102 has encountered gas and oil in the Butmah Formation and the results of the well are interpreted to be generally consistent with pre-drill expectations.

 

The hydrocarbon columns and reservoir characteristics interpreted in the KHE 102 well are also seen as broadly confirming the Company's initial estimates of total recoverable hydrocarbon volumes from the Butmah Formation of 19.2 million barrels oil equivalent.

 

KHE-102 encountered the Butmah Formation at a depth of 2847 metres Measured Depth below rotary table ("m MD brt"), 2442 metres True Vertical Depth below mean sea level ("m TVD bmsl"), some 16 metres shallow to prognosis. Three consecutive core sections each of 12 metres length were cut, with hydrocarbons shows from core sections and drill cuttings indicating the presence of both gas and oil within the Formation. An open-hole flow test was conducted over the interval 2847-2895m MD brt (2442-2490 m TVD bmsl). The Butmah Formation flowed wet gas at an average rate of 10.7 million cubic feet of gas per day ("MMcfpd") over a 5 hour period on a 32/64" choke, with an associated hydrocarbon liquid rate of 524 barrels ("bbl") per day of 58 degree API condensate. No formation water was produced. The testing operation was terminated prematurely for safety reasons following the failure of a down-hole packer supporting the well test completion string.

 

Interpretation of results from the flow test, electrical wireline log data and reservoir pressure data recovered over the Butmah Formation, confirms the presence of an oil reservoir with an overlying gas cap as seen in the original oil discovery at KHE-101. The KHE-102 production test initially flowed wet gas with a condensate yield of 49 bbls per MMcf, but as a result of the failure of the packer, it was not possible to subsequently flow oil from the oil leg.

 

The well was subsequently deepened to the Triassic Kurrachine Dolomite Formation, which was encountered 7 metres shallow to prognosis at 3119m MD brt (2714m TVD bmsl). In spite of extensive shows of light oil being present on drill cuttings and a single core section recovered below this depth, the Kurrachine Dolomite failed to flow oil during an open-hole test, even following acidification of the reservoir interval, probably as a result of the absence of natural fractures within the low permeability reservoir interval at this location.

 

·; Operational Highlights of 2011 Production and Exploration Activities

 

Both Khurbet East and Yousefieh oil fields continued to perform extremely well during the year. Four new production wells were drilled raising oil production to a level in excess of 24,000 barrels of oil per day ("bopd") by August, prior to the impact of European Union sanctions. Later in the year, static pressure surveys conducted on shut-in wells further confirmed the presence of a strong aquifer in both fields, with positive implications for reserves bookings.

 

A total of seven exploration wells were drilled in 2011, four of which were oil discoveries, including Yousefieh East, Al Khairat and the Khurbet East Field Butmah Formation in Syria, and Sidi Dhaher in Tunisia. The potential development of oil and gas accumulations in the Khurbet East Field Butmah formations was declared to be commercial in December 2011. The Company's hydrocarbon reserves are currently being evaluated for all fields and results will be released in early April 2012.

 

This release has been approved by Richard Malcolm, Chief Executive of Gulfsands Petroleum Plc who has a Bachelor of Science degree in Geology with 30 years of experience in petroleum exploration and management. Mr. Malcolm has consented to the inclusion of the technical information in this release in the form and context in which it appears.

For more information please contact: 

Gulfsands Petroleum (London)
+44 (0)20 7434 6060
Richard Malcolm, Chief Executive Officer
Andrew Rose, Chief Financial Officer
Kenneth Judge, Director: Corporate Development & Communications
 
Buchanan (London)
+44 (0)20 7466 5000
Bobby Morse
Ben Romney
 
 
RBC Capital Markets (London)
+44 (0)20 7653 4000
Josh Critchley
Tim Chapman
Matthew Coakes

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

More information can be found on the Company's website www.gulfsands.com

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBKKDPBBKBADN
Date   Source Headline
20th Apr 20181:06 pmRNSSecondary Trading Facility
19th Apr 20182:05 pmRNSSecond Price Monitoring Extn
19th Apr 20182:00 pmRNSPrice Monitoring Extension
10th Apr 20181:22 pmRNSResults of General Meeting
21st Mar 20187:00 amRNSFinancing and Delisting
21st Mar 20187:00 amRNSOperational Update
17th Jan 20187:00 amRNSFinancing Update
28th Nov 20175:20 pmRNSMoulay Bouchta Petroleum Agreement Update
10th Nov 20177:00 amRNSMorocco Country Exit Initiated
9th Nov 20171:35 pmRNSDirector's Disclosure
11th Oct 20177:00 amRNSColombia Update -Reset of Putumayo 14 Contract
29th Sep 20177:00 amRNSHalf-year Report
13th Jul 20178:54 amRNSTunisia Update
28th Jun 20172:12 pmRNSResult of AGM
21st Jun 20177:00 amRNSMoulay Bouchta Contract Update
2nd Jun 20171:43 pmRNSPosting of Annual Report and Notice of AGM
30th May 20177:00 amRNSANNUAL AUDITED RESULTS YEAR ENDED 31 DECEMBER 2016
24th May 20177:18 amRNSColombia Update
10th May 20177:00 amRNSLlanos-50 Contract 18 Month Extension Confirmed
27th Apr 20177:00 amRNSFinance Update
16th Feb 20177:00 amRNSSecured Term Financing Facility
15th Feb 20177:00 amRNSMoulay Bouchta Extension Confirmed
3rd Jan 20178:11 amRNSDirectorate Change
29th Dec 20162:05 pmRNSSecond Price Monitoring Extn
29th Dec 20162:00 pmRNSPrice Monitoring Extension
14th Nov 20167:00 amRNSGrant of Options to Directors
8th Nov 20164:35 pmRNSLicence Update
19th Oct 201610:05 amRNSColombia Farmout Agreement Signed
10th Oct 20167:00 amRNSBoard Appointments
16th Aug 20167:00 amRNSHalf-year Report
10th Aug 20161:24 pmRNSPlacing to raise approximately £1.5 million
22nd Jul 20167:00 amRNSBoard and Management Changes
28th Jun 20167:00 amRNSClaim by Al Mashrek Group in Syria
5th May 20164:15 pmRNSResult of AGM
22nd Mar 20164:40 pmRNSSecond Price Monitoring Extn
22nd Mar 20164:35 pmRNSPrice Monitoring Extension
22nd Mar 201610:35 amRNSStmnt re Share Price Movement
18th Mar 20167:00 amRNSAnnual Financial Results 31 December 2015
11th Mar 20168:39 amRNSStatement re: Share Price Movement
4th Mar 20163:43 pmRNSHolding(s) in Company
4th Mar 20161:36 pmRNSHolding(s) in Company
18th Jan 20168:43 amRNSHolding(s) in Company
13th Jan 20164:03 pmRNSResult of Open Offer
7th Jan 201612:19 pmRNSPublication of Supplementary Prospectus
5th Jan 201610:56 amRNSExtension of Open Offer Closing Date
4th Jan 201612:46 pmRNSExtension Granted for Chorbane Permit
16th Dec 201512:36 pmRNSPublication of Prospectus
30th Nov 20153:49 pmRNSUpdate for the Rharb Petroleum Agreement
16th Oct 20157:00 amRNSUpdate for the Fes Petroleum Agreement
24th Sep 20157:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.