The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

8 Aug 2011 07:00

RNS Number : 8964L
Gulfsands Petroleum PLC
08 August 2011
 



 

Immediate Release

8th August, 2011

 

 

GULFSANDS PETROLEUM PLC

 

 

Syria Operations Update

 

Well KHE-19H Achieves Oil Flow Rate of 5516 bopd Under Production Test

 

Additional Khurbet East Production Facility Sub-station Commissioned

 

Gross Oil Production from Khurbet East and Yousefieh Fields Passes 2011 Year End Exit Production Target of 24,000 bopd

 

 

London, 8th August, 2011: Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Iraq, Tunisia, Italy and the U.S.A., is pleased to provide this update on operations in Syria.

 

 

Flow Testing of Khurbet East 19H ("KHE-19H")

 

The Khurbet East 19H ("KHE-19H") well has achieved a flow rate of 5516 barrels of oil per day ("bopd") on production test with an oil gravity of approximately 26 degrees API, similar in quality to the oil produced in the central portion of the Khurbet East Field. This production rate was obtained during a 2 hour main flow period under a 48/64th inch choke size and with an average wellhead pressure of 132 psi and with no associated production of formation water. The choke size was subsequently reduced to 32/64th inch, after which the well was flowed for a further 3 hours at an average rate of 3828 bopd, at an average wellhead pressure of 210 psi and with no production of water. The test was then terminated due to all available oil storage tank capacity being filled. The 67 metre horizontal productive section of this well is located in a sidetrack drilled in a south-southeasterly direction from the original KHE-19 vertical hole.

 

The oil flow rate of 5516 bopd from KHE-19H is the highest yet measured from any well within the Khurbet East field. This well has demonstrated that excellent reservoir quality exists from the central portion of the field all the way to the northern limit of the field.

 

 

Commissioning of Khurbet East Sub-station Production Facility

 

The oil processing capacity for the Khurbet East Field has been increased by approximately 3000 bopd after the construction and commissioning of a new oil processing sub-station ("EFP 2") with a design capacity of approximately 3000 bopd and located approximately 1.8 kilometres west of the Khurbet East Early Production Facility ("EPF"). At this new facility, gas is separated from the produced oil and the stabilised crude is pumped into storage tanks located within the EPF complex followed by subsequent delivery into the Khurbet East export pipeline. Well KHE-19H has been tied into the new sub-station and is estimated to be producing at a rate of more than 2900 bopd on a restricted choke.

 

As a result of these operational and construction activities, Block 26 oil production facility capacity is now more than 24,000 bopd. The reconciled production rate achieved at the expanded facilities as of 6th August, 2011 was 24,054 bopd, comfortably achieving and exceeding the Company's previously announced year-end 2011 production target of 24,000 bopd.

 

 

Block 26 Drilling Operations

 

Gulfsands drilling operations in Syria Block 26, using the Crosco E-401 and E-501 drilling rigs, are continuing as planned on the Yousefieh East and Safa exploration prospects. The results of these exploration drilling operations will be the subject of a future news release.

 

This release has been approved by Richard Malcolm, Chief Executive of Gulfsands Petroleum Plc who has a Bachelor of Science degree in Geology with 30 years of experience in petroleum exploration and management. Mr. Malcolm has consented to the inclusion of the technical information in this release in the form and context in which it appears.

 

ABOUT GULFSANDS:

 

Gulfsands is listed on the AIM market of the London Stock Exchange.

 

Syria

 

Gulfsands owns a 50% working interest and is operator of Block 26 in North East Syria. The Khurbet East oil field was discovered in June 2007 and commenced commercial production within 13 months of the discovery. This field is producing at an average gross production rate of approximately 21,500 barrels of oil per day through early production facilities. A second field discovery, the Yousefieh field, was brought on-stream in April 2010, and is currently producing approximately 2,500 barrels of oil per day. Block 26 covers approximately 5,414 km2 and encompasses existing fields which currently produce over 100,000 barrels of oil per day, and are operated mainly by the Syrian Petroleum Company. The current exploration license expires in August 2012. Gulfsands' working interest 2P reserves in Syria at 31 December 2010 were 53.6 mmbbls.

 

Tunisia

 

Gulfsands is acquiring working interest positions in two exploration permits in Tunisia (Chorbane and Kerkouane Permits) and one exploration permit in Southern Italy (G.R15.PU) from ADX Energy Ltd the operator of all three permits. The Company's interest in these permits remains subject to the completion of the Company's farm obligations and various approvals from the governments of Tunisia and Italy.

 

Kerkouane Permit - Offshore Tunisia

G.R15.PU Permit (Pantelleria Permit) - Offshore Italy

 

G.R15.PU, is located offshore the island of Pantelleria southwest of Sicily in Italian waters and the Kerkouane Permit is located offshore northeast Tunisia. The two permits are contiguous and comprise a total area of approximately 4,500 km2.

 

The operator has identified multiple leads and targets on these permits. Drilling operations were recently completed at the Lambouka-1 well where gas was encountered in the Abiod Formation. However, as a result of down-hole problems, no fluid samples or gas flow were established. The well was suspended with the intention of re-entering at a later date and drilling and testing the reservoir in a sidetrack hole up-dip of the existing discovery.

 

Gulfsands has completed its earn commitments with respect to the Kerkouane and Pantelleria Permits with the drilling of the Lambouka-1 well. Gulfsands has earned a 30% working interest in both permits by paying approximately 35% of the cost the Lambouka-1 well and reimbursing the operator for a portion of various pre-drill costs that include a recently completed 3D seismic programme.

 

Chorbane Permit - Onshore Tunisia

 

The Chorbane permit is located in central Tunisia and covers an area of 2,428 km2. The permit is surrounded by several producing oil fields and extensive oil & gas infrastructure. Gulfsands' forward work commitment for the Chorbane permit includes the drilling of one exploration well in the first quarter of 2011 for which Gulfsands will pay 80% of the first $5 million in drilling costs, and 40% of the drilling costs in excess of $5 million, so as to earn a 40% interest in the permit.

 

A number of prospects and leads have been indentified within the permit, the most prospective being a large tilted horst block ("Sidi Daher") where the operator has identified multiple potential targets estimated to hold recoverable mean un-risked prospective resources of 175 billion cubic feet of gas ("bcfg") and 44 million barrels of oil from Tertiary and Cretaceous aged reservoirs.

 

Iraq

 

Gulfsands signed a Memorandum of Understanding in January 2005 with the Ministry of Oil in Iraq for the Maysan Gas Project in Southern Iraq, following completion of a feasibility study on the project, and is negotiating details of a definitive contract for this regionally important development. The project will gather, process and transmit natural gas that is currently a waste by-product of oil production and as a result of the present practice of gas flaring, contributes to significant environmental damage in the region. The Company is actively engaged in discussions with respect to financing and potential equity partners. Gulfsands has no reserves in Iraq.

 

Gulf of Mexico, USA

 

The Company owns interests in 30 leases offshore Texas and Louisiana, which include 20 producing oil and gas fields with proved and probable working interest reserves at 31 December 2010 of 3.2 mmboe (figures adjusted for the disposal of non-core properties in December 2010).

 

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

More information can be found on the Company's website www.gulfsands.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBUGDIUBGBGBR
Date   Source Headline
20th Apr 20181:06 pmRNSSecondary Trading Facility
19th Apr 20182:05 pmRNSSecond Price Monitoring Extn
19th Apr 20182:00 pmRNSPrice Monitoring Extension
10th Apr 20181:22 pmRNSResults of General Meeting
21st Mar 20187:00 amRNSFinancing and Delisting
21st Mar 20187:00 amRNSOperational Update
17th Jan 20187:00 amRNSFinancing Update
28th Nov 20175:20 pmRNSMoulay Bouchta Petroleum Agreement Update
10th Nov 20177:00 amRNSMorocco Country Exit Initiated
9th Nov 20171:35 pmRNSDirector's Disclosure
11th Oct 20177:00 amRNSColombia Update -Reset of Putumayo 14 Contract
29th Sep 20177:00 amRNSHalf-year Report
13th Jul 20178:54 amRNSTunisia Update
28th Jun 20172:12 pmRNSResult of AGM
21st Jun 20177:00 amRNSMoulay Bouchta Contract Update
2nd Jun 20171:43 pmRNSPosting of Annual Report and Notice of AGM
30th May 20177:00 amRNSANNUAL AUDITED RESULTS YEAR ENDED 31 DECEMBER 2016
24th May 20177:18 amRNSColombia Update
10th May 20177:00 amRNSLlanos-50 Contract 18 Month Extension Confirmed
27th Apr 20177:00 amRNSFinance Update
16th Feb 20177:00 amRNSSecured Term Financing Facility
15th Feb 20177:00 amRNSMoulay Bouchta Extension Confirmed
3rd Jan 20178:11 amRNSDirectorate Change
29th Dec 20162:05 pmRNSSecond Price Monitoring Extn
29th Dec 20162:00 pmRNSPrice Monitoring Extension
14th Nov 20167:00 amRNSGrant of Options to Directors
8th Nov 20164:35 pmRNSLicence Update
19th Oct 201610:05 amRNSColombia Farmout Agreement Signed
10th Oct 20167:00 amRNSBoard Appointments
16th Aug 20167:00 amRNSHalf-year Report
10th Aug 20161:24 pmRNSPlacing to raise approximately £1.5 million
22nd Jul 20167:00 amRNSBoard and Management Changes
28th Jun 20167:00 amRNSClaim by Al Mashrek Group in Syria
5th May 20164:15 pmRNSResult of AGM
22nd Mar 20164:40 pmRNSSecond Price Monitoring Extn
22nd Mar 20164:35 pmRNSPrice Monitoring Extension
22nd Mar 201610:35 amRNSStmnt re Share Price Movement
18th Mar 20167:00 amRNSAnnual Financial Results 31 December 2015
11th Mar 20168:39 amRNSStatement re: Share Price Movement
4th Mar 20163:43 pmRNSHolding(s) in Company
4th Mar 20161:36 pmRNSHolding(s) in Company
18th Jan 20168:43 amRNSHolding(s) in Company
13th Jan 20164:03 pmRNSResult of Open Offer
7th Jan 201612:19 pmRNSPublication of Supplementary Prospectus
5th Jan 201610:56 amRNSExtension of Open Offer Closing Date
4th Jan 201612:46 pmRNSExtension Granted for Chorbane Permit
16th Dec 201512:36 pmRNSPublication of Prospectus
30th Nov 20153:49 pmRNSUpdate for the Rharb Petroleum Agreement
16th Oct 20157:00 amRNSUpdate for the Fes Petroleum Agreement
24th Sep 20157:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.