We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.025 (2.22%)
Spread: 0.10 (9.091%)
Open: 1.125
High: 1.175
Low: 1.125
Prev. Close: 1.125
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of drilling at the Luansobe Project

4 Aug 2022 07:00

RNS Number : 9060U
Galileo Resources PLC
04 August 2022
 

For immediate release

 

4 August 2022

Galileo Resources Plc

("Galileo" or "the Company")

 

Commencement of drilling at the Luansobe Copper Project, Zambia

 

Galileo Resources plc ("Galileo "or the "Company") is pleased to provide an update on progress and drill planning at the Luansobe Copper Project (the "Project") on the Zambian Copperbelt where it holds a 75% interest in Small Scale Exploration Licence No. 28340-HQ-SEL (the "Licence").

 

 

Highlights

 

· Contract signed for a programme of approximately 3,000m of core drilling on potentially open pittable copper deposit at Luansobe; drilling to commence imminently

· Hole layout planned with input from Addison Mining Services of the UK, designed to infill gaps in historic drilling and twin selected holes, with a particular focus on shallow up-dip projections of the Luansobe deposit

· The aim will be to complete mineral resource estimates reported in accordance with JORC (2012) which will be used as the basis for potential open pit mine planning

· Re-logging of historic drill core dating from the 1950s and 1960s was completed, with core from five vertical holes being split for assaying of possible copper-bearing zones not previously recognised or considered of interest by earlier operators.

· Selected assay results received are shown in the table below and include:

16m @ 1.20% Cu from 58m in hole L0071

14m @ 0.99% Cu from 70m in hole L0069

· The new data will be added to the drilling database and have the potential to improve open pit economics by extending the intervals of known copper mineralisation

 

 

Colin Bird Chairman & CEO said: "We are very pleased with our overall desktop review of the historic drill data for Luansobe and independent overview by Addison Mining Services. Re-examination of the old drill core found previously unrecognised copper-bearing zones of significant length. The work undertaken adds value to the modelling of a potential open pit and the new drill programme will define the extent and copper content, if any, of pre-strip for such a pit. We will aim to put a development contract out to tender early in Q4, 2022.

 

In essence, we are very pleased that our original prognosis regarding the open pit potential at Luansobe has been more than confirmed to date and our fast-track efforts have been fruitful."

 

 

Historic Core Re-logging/Assaying

Re-logging of core from 30 historic drill holes was carried out for Galileo, comprising:

 

• Pre-cursor core search, retreival and remedial work

• Geotechnical logging

• Core photography

• Summary geological logging

• Noting of key / significant or obvious structural features

• pXRF screening of drill core

• Core cutting and re-sampling of drill core

 

Holes examined included both those within the conceptual open pit area, as well as holes along strike and down-dip which might be of value to an eventual underground mining operation on deeper mineralisation.

 

Based on first pass pXRF analytical measurements, intervals from five shallow holes, totalling 96 samples were selected for assay checking at the SGS Laboratory in Kalulushi on the Zambian Copperbelt. Of particular interest was an intermittently mineralised shale unit overlying the main stratigraphic target at Luansobe which had not been checked during the historic drilling. The more significant assay intervals are tabulated below:

 

Luansobe Historic Core Assaying - Selected Intervals

Hole No.

Depth from (m)

Depth to (m)

Interval (m)

Cu%

L0066

70

84

14

0.99

L0071

58

74

16

1.20

Incl.

61

74

13

1.42

L0040A

124

127

3

0.55

 

The new data highlights the need to test this shallower zone in future holes and a positive outcome could improve the open pit project economics in future modelling.

 

Drill Planning

A programme of approximately 3,000m of core drilling is planned at Luansobe in up to 30 holes within, and marginal to, the conceptual open pit as currently modelled by Addison Mining Services of the UK. Planned holes will cover areas where re-modelling of the deposit shows that shallow copper potential was not adequately tested, where no assay data is available in the historic records or where previous holes appear not to have fully tested the main mineral horizons. Several holes will also be 'twinned' to confirm the historic data. When drilling and assaying is completed, mineral resource estimate will be prepared and reported in accordance with JORC (2012), which will then be utilised in open pit evaluation and planning.

 

Project Background

The Luansobe area is situated some 15km to the northwest of the Mufulira Mine in the Zambian Copperbelt which produced well over 9Mt of copper metal during its operation. It forms part of the northwestern limb of the northwest - southeast trending Mufulira syncline and is essentially a strike continuation of Mufulira, with copper mineralisation hosted in the same stratigraphic horizons. At the Luansobe prospect mineralisation occurs over two contiguous zones, dipping at 20-30 degrees to the northeast, over a strike length of about 3km and to a vertical depth of at least 1,250m.

 

 

Technical Sign-Off

Technical information in this announcement has been reviewed by Edward (Ed) Slowey, BSc, PGeo, Technical Director of Galileo. Mr Slowey is a geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved this announcement.

 

You can also follow Galileo on Twitter: @GalileoResource

 

For further information, please contact: Galileo Resources PLC

 

Colin Bird, Chairman

Tel +44 (0) 20 7581 4477

Beaumont Cornish Limited - Nomad

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

Novum Securities Limited - Joint Broker

Colin Rowbury /Jon Belliss

+44 (0) 20 7399 9400

Shard Capital Partners LLP - Joint Broker

Damon Heath

Tel +44 (0) 20 7186 9952

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCEZLBBLVLEBBB
Date   Source Headline
23rd Apr 20245:04 pmRNSDirector's Dealings
19th Mar 20247:00 amRNSKamativi Lithium-Tin Project – Drill Assay Results
29th Feb 20247:00 amRNSUpdate on 51% interest in Lithium & Gold Projects
1st Feb 20247:00 amRNSNew Targets Defined on PL039/2018 and PL040/2018
30th Jan 20247:00 amRNSThree Copper Targets Discovered on PL253/2018
28th Dec 20233:18 pmRNSHalf-year Report
8th Nov 20233:29 pmRNSResult of AGM
7th Nov 20237:00 amRNSAppointments to Galileo Technical Team
7th Nov 20237:00 amRNSZambia Drilling Cuts Wide Mineralised Breccia Zone
17th Oct 20237:00 amRNSKamativi Project Update
11th Oct 20237:00 amRNSExploration and Projects Update
4th Oct 202311:02 amRNSTotal Voting Rights
29th Sep 202310:38 amRNSFinal Results
20th Sep 20237:00 amRNSExploration Update at Shinganda, Zambia
5th Sep 20231:46 pmRNSZambian Exploration Licence joint venture
21st Aug 20234:43 pmRNSUpdate on Lithium Discovery - Kamativi Project
10th Aug 20237:00 amRNSNew lithium discovery in Kamativi initial drilling
24th Jul 20237:00 amRNSWide Pegmatite Intercepts at Kamativi Project
20th Jul 20237:00 amRNSChange of auditor
29th Jun 20237:00 amRNSDelineation of Gold Targets at Bulawayo Project
27th Jun 20237:00 amRNSJoint Venture Option exercised at Shinganda
23rd Jun 20237:00 amRNSUpdate on Afrimat Option to acquire Glenover
15th Jun 20237:00 amRNSDrill Programme over Kamativi Lithium Project
15th May 20237:00 amRNSExploration Developments over KCB Licences
29th Mar 20237:00 amRNSKalahari Copper Belt - Exploration Update
23rd Mar 20237:00 amRNSKamativi Lithium Project – New Discoveries
22nd Mar 20237:00 amRNSUpdate on Glenover sale and Bulawayo Gold Project
9th Feb 20237:00 amRNSJORC 2012 Inferred MRE for the Luansobe Project
2nd Feb 20237:00 amRNSExploration Results from wider area at Shinganda
18th Jan 20237:00 amRNSFurther Drilling Extends Shinganda Project
30th Dec 202211:46 amRNSInterim Results
30th Dec 202210:00 amRNSInterim Results
8th Dec 20227:00 amRNSKamativi Lithium Project - Exploration Update
30th Nov 20227:00 amRNSDelineation of Gold and Nickel Targets at Bulawayo
28th Nov 20229:54 amRNSIssuance of share options
23rd Nov 202210:00 amRNSCompletion of Drilling at Luansobe Project
1st Nov 20227:00 amRNSUpdate on Fieldwork on Targets at Bulawayo Project
25th Oct 20221:46 pmRNSHolding(s) in Company
20th Oct 20227:00 amRNSUpdate on Afrimat Option regarding Glenover
13th Oct 20222:30 pmRNSResult of AGM
3rd Oct 20222:53 pmRNSAcquisition of 29% shareholding in BCV
21st Sep 202212:00 pmRNSFinal Results
26th Aug 20229:12 amRNSDiscovery of Nickel Targets at Bulawayo Project
16th Aug 202212:46 pmRNSBulawayo Gold - surveys and target selection
10th Aug 202212:45 pmRNSAgreement to acquire further interest in BCV
8th Aug 20222:05 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20227:00 amRNSCommencement of drilling at the Luansobe Project
28th Jul 202210:35 amRNSIssue of Options
20th Jul 20227:00 amRNSPreliminary Drill Results at Shinganda Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.