Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGem Diamonds Di Regulatory News (GEMD)

Share Price Information for Gem Diamonds Di (GEMD)

Share Price is delayed by 15 minutes
Get Live Data
3.835    0.225 (6.23%)
Bid:
3.61
Ask:
4.06
Spread: 0.45 (12.465%)
Market Cap: £5.05m
GEMD Live PriceLast checked at - London Stock Exchange

Intraday Gem Diamonds Di Share Chart

Q1 2017 Trading Update

23 May 2017 07:00

RNS Number : 8968F
Gem Diamonds Limited
23 May 2017
Β 

23 May 2017

Β 

GEM DIAMONDS LIMITED

Q1 2017 Trading Update

Β 

Gem Diamonds Limited (LSE: GEMD) ("Gem Diamonds" or the "Company" or the "Group") provides the following Trading Update detailing the Group's operational performance for the Period from 1Β January 2017 to 31 March 2017 ("Q1 2017" or the "Period") and sales performance to the date of this report.

Β 

LetΕ‘eng:

Β 

Β· Announcement today of the recovery of a 98.42 carat high quality D-colour Type II diamond which will be sold in June (see www.gemdiamonds.comΒ for photograph).

Β· Sold 39 950 carats for an average price of US$ 1Β 6361 per carat for the first three tenders in 2017 (up 13% from US$ 1Β 444 per carat in the previous period, Q4 2016).

Β· An 8.65 carat pink diamond achieved US$ 164Β 855 per carat, making it the sixth highest price per carat achieved by a LetΕ‘eng rough diamond.

Β· A 114.38 carat Type II diamond was sold into a partnership arrangement, with LetΕ‘eng to share in additional margin on the final polished diamonds.

Β· 11 diamonds sold for more than US$ 1.0 million generating revenue of US$ 20.4 million.

Β· On 3 May, an exceptional 80.58 carat D-colour Type II diamond was recovered which will be sold in June.

Β· Zero Lost Time Injuries for the Period.

1 Refer to section 2.1 "LetΕ‘eng rough diamond sales" for further details

Β 

Financial:

Β 

Β· The Group had US$ 29.2 million cash on hand at the end of the Period of which US$Β 24.4Β million is attributable to Gem Diamonds Limited.

Β· Bank funding for the construction of the LetΕ‘eng mining support services complex valued at M215.0 million (c. US$ 16.0 million) was secured by LetΕ‘eng during the Period.

Β· US$ 40.0 million of available facilities have been drawn down resulting in a net debt position of US$Β 10.8Β million at the end of the Period.

Β· Including the mining support services complex facility, the Group had US$ 29.7 million worth of undrawn and available facilities at the Period end.

Β 

Β 

Gem Diamonds' CEO, Clifford Elphick commented:

Β 

"LetΕ‘eng has recovered larger better quality diamonds during the Period and it is encouraging that during April and May, there was a notable improvement in the size and quality of diamonds recovered at LetΕ‘eng with the US$ per carat achieved trending positively. The market for LetΕ‘eng's high-quality diamonds has remained firm over the Period and this is anticipated to continue into H2 of this year. In addition, the revised life of mine plan was implemented during February with the objective of reducing waste tonnes mined and improve near term cash flows, and we expect to see the benefits emerge during 2017.

Β 

The Company welcomes its new Chairman, Harry Kenyon-Slaney who will assume his position on 6 June and, again, expresses its sincere thanks to our retiring Chairman, Roger Davis, for his many years of excellent service to the Company."

Β 

Β 

1. Diamond MarketΒ 

Β 

The demand for LetΕ‘eng's large high quality white rough diamonds has remained firm.

Β 

2. LetΕ‘eng

Β 

Β 

Q1 2017

Q4 2016

QoQ

% Change

Β 

Q1 2016

YoY

% Change

Β 

Waste stripped (tonnes)

7Β 811 416

7 861 775

-1%

7Β 056 303

11%

Ore treated (tonnes)

1Β 667 000

1 697 070

-2%

1Β 624 964

3%

Carats recovered

25 479

26 438

-4%

28 698

-11%

Grade recovered (cpht)

1.53

1.56

-2%

1.77

-13%

Β 

The revised life of mine plan, designed to reduce waste mined and improve near term cash flows, was implemented during February.

Β 

Waste mined during the Period was 7Β 811 416 tonnes and the overall stripping ratio was 4.39 for the Period. This is in line with the requirements of the revised mining plan.

Β 

LetΕ‘eng treated a total of 1.4 million tonnes of ore during the Period, 75% of which was sourced from the Main pipe, and 25% from the Satellite pipe. The balance of the ore (0.3 million tonnes) was treated through the Alluvial Ventures contractor plant, which was sourced from the Main pipe and low grade stockpiles.

Β 

During the Period engineering challenges were experienced at both LetΕ‘eng plants that resulted in lower than planned plant availability. As a consequence, tonnes treated in the Period were c.76 000 tonnes lower than planned. The temporary plant availability challenges are being addressed with the contracting partner, and full year guidance remains unaltered. The contribution from the Satellite pipe is expected to meet the original target of 1.8 million tonnes for the full year.

Β 

During the Period, 25 479 carats were recovered at a grade of 1.53 cpht against an expected reserve grade of 1.61 cpht mainly due to the underperformance of the Main Pipe contact material, which resulted in a Mine Call Factor of 95%. Mining activities have moved to the centre of the Main pipe and grades are returning to expected levels. During Q2 mining in the Main pipe is moving into the higher grade K6 portion of the pipe.

Β 

The splitting of the front ends of Plant 1 and Plant 2 was completed at the end of the Period. This has facilitated the treatment of discrete ore samples based on their individual geo-metallurgical characteristics to better understand the performance of the resource.

Bank funding for the construction of the LetΕ‘eng mining support services complex valued at M215.0Β million (c. US$16.0 million) was secured by LetΕ‘eng during the Period. This facility has a tenure of five and a half years with a 13-month availability period. The funding is required to relocate the mining workshops, offices and related services within the mining area to allow the mine to effectively maintain the new and larger fleet of mining equipment as a result of the new waste cutbacks required to extend the life of the open pit in line with the revised mine plan.

2.1. LetΕ‘eng rough diamond sales

Β 

Three tenders have been held in 2017. 39Β 950 carats were sold for US$ 65.4 million, achieving an average price of US$ 1Β 636 per carat (full year 2016 - US$ 1Β 695* per carat). In line with the sales and marketing strategy, the lower-value smaller commercial production is accumulated and carried over for a larger volume sale once every quarter. This production will be sold in the fourth tender to be held in June and has been included at an estimated value in determining the average US$ price per carat for the first three tenders of 2017.

Β 

The current average price achieved is up 13% from the US$ 1Β 444 per carat achieved in the previous period, Q4 2016.

Contributing to the achieved US$ per carat was an 8.65 carat pink diamond which achieved US$ 164Β 855 per carat, making it the sixth highest US$ per carat achieved by a LetΕ‘eng rough diamond, together with the sale of a number of other large high value white diamonds including a 114.38 Type II carat diamond which was sold into a partnership arrangement in May.

* Includes carats extracted at rough value for polishing.

3. GhaghooΒ 

Β 

Care and maintenance status was successfully achieved ahead of plan on 31 March 2017.

Β 

There was no sale of Ghaghoo goods during the Period. The remaining carats on hand (c. 13Β 000 carats) are anticipated to be sold during Q2 2017.

Β 

4. Health, Safety, Social and Environment (HSSE):

Β 

There were no Lost Time Injuries (LTI) during the Period, resulting in a Group-wide Lost Time Injury Frequency Rate (LTIFR) of 0.00 for the Period. The Group-wide All Injury Frequency Rate (AIFR) for the Period was 2.3.

Β 

No significant community or environmental incidents have occurred across the Group during the Period.

Β 

Β 

FOR FURTHER INFORMATION:

Β 

Gem Diamonds Limited

Susan Wallace, Company Secretarial department

ir@gemdiamonds.com

Celicourt Communications

Joanna Boon / Mark Antelme

Tel: +44 (0) 207 520 9261Β 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

Β 

The Gem Diamonds Limited LEI number is 213800RC2PGGMZQG8L67.

Β 

Β 

ABOUT GEM DIAMONDS:

Β 

Gem Diamonds is a leading global diamond producer of high value diamonds. The Company owns 70% of the LetΕ‘eng mine in Lesotho and 100% of the Ghaghoo mine in Botswana. The LetΕ‘eng mine is famous for the production of large, top colour, exceptional white diamonds, making it the highest dollar per carat kimberlite diamond mine in the world. Since Gem Diamonds' acquisition of LetΕ‘eng in 2006, the mine has produced four of the 20 largest white gem quality diamonds ever recorded. The Ghaghoo mine in Botswana has been placed on care and maintenance until market conditions allow for recommencement of production. www.gemdiamonds.com

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
TSTOKBDBOBKDNPB
Date   Source Headline
28th Mar 20175:39 pmRNSBlock listing application
15th Mar 20177:00 amRNSFull Year 2016 Results
3rd Mar 20177:00 amRNSNotice of Results
16th Feb 20178:16 amRNSUpdate on the future of the Ghaghoo mine
6th Feb 20177:00 amRNSQ4 2016 Trading Update
30th Jan 20177:00 amRNSNotification of Q4 2016 Trading Update
12th Dec 20169:19 amRNSChange of External Directorship
30th Nov 201610:30 amRNSTotal Voting Rights
10th Nov 20167:00 amRNSQ3 2016 Trading Update
3rd Nov 20167:00 amRNSNotification of Q3 2016 Trading Update
19th Oct 20167:00 amRNSBlock Listing Six Monthly Return
30th Sep 20165:10 pmRNSTotal Voting Rights
27th Sep 20167:00 amRNSHolding(s) in Company
5th Sep 20162:50 pmRNSPDMR - Sale of Shares
31st Aug 20168:36 amRNSExercise of Options
17th Aug 20167:00 amRNSHalf-Year 2016 Results
10th Aug 20167:00 amRNSLetseng Operational Update
19th Jul 20167:00 amRNSH1 2016 Trading Update
12th Jul 20167:00 amRNSNotification of 2016 Half Year Trading Update
30th Jun 20169:10 amRNSTotal Voting Rights
7th Jun 20163:37 pmRNSResult of AGM
3rd Jun 20164:24 pmRNSSale of Shares
17th May 20167:00 amRNSTrading update for Q1 2016
4th May 20164:19 pmRNSPDMR - Sale of Shares
26th Apr 20167:00 amRNSNotice of 2016 Annual General Meeting
19th Apr 20168:15 amRNSBLOCK LISTING SIX MONTHLY RETURN
18th Apr 201611:00 amRNSBlock Listing Application
16th Mar 20164:48 pmRNSShare Options
15th Mar 20161:58 pmRNSDividend Declaration
15th Mar 20167:00 amRNSFull Year 2015 Results
8th Mar 20162:45 pmRNSNotice of Results
3rd Feb 20167:00 amRNSTrading update for Q4 2015
29th Jan 201611:00 amRNSNotification of Q4 2015 Trading Update
17th Dec 20157:00 amRNSNon-Executive Director Appointment
7th Dec 20157:00 amRNSAppointment of Joint Broker
11th Nov 20157:00 amRNSTrading update for Q3 2015
9th Nov 20157:00 amRNSNotification of Q3 2015 Trading Update
5th Nov 20153:15 pmRNSHolding(s) in Company
26th Oct 201510:59 amRNSBLOCK LISTING SIX MONTHLY RETURN
21st Sep 20154:19 pmRNSHolding(s) in Company
14th Sep 20157:00 amRNSSale of the 357ct Letseng diamond
19th Aug 20157:00 amRNSHalf Year Report
30th Jul 20157:00 amRNSH1 2015 Trading Update
24th Jul 201511:40 amRNSNotification of H1 Trading Update
3rd Jun 201511:49 amRNSResult of AGM
29th May 20157:00 amRNSVoting Rights and Issued Share Capital
21st May 20157:00 amRNSSales and Operational Update
15th May 201510:48 amRNSNotification of Trading Update
5th May 20157:01 amRNSExercise of Options
30th Apr 201511:02 amRNSVoting Rights and Issued Share Capital

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.