Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGCM Resources Regulatory News (GCM)

Share Price Information for GCM Resources (GCM)

Share Price is delayed by 15 minutes
Get Live Data
4.125    -0.375 (-8.33%)
Bid:
4.05
Ask:
4.20
Spread: 0.15 (3.704%)
Market Cap: £15.19m
GCM Live PriceLast checked at - London Stock Exchange

Intraday GCM Resources Share Chart

Coal Quality Update

12 Jan 2005 10:53

Asia Energy PLC12 January 2005 Asia Energy PLC Tests of Coal Quality at Asia Energy's Phulbari Deposit Indicate Presence of High Quality Export Coal Products 12th January 2005 Asia Energy PLC ("Asia Energy" or "the Company") announces today that coresample analysis from recent drilling at its Phulbari Coal Project ("the Project") in north-west Bangladesh confirms expectations of a bituminous coal with HighVolatiles, Low Ash, and good calorific value. Laboratory testing workindicates that some of Phulbari's coal production may be suitable for sale tothe metallurgical export markets either as a Semi-Soft Coking Coal or as aPulverised Coal Injection ("PCI") coal. Float-sink testing conducted at the ACIRL laboratories in Brisbane, Australia,and review by QCC Resources Pty Ltd ("QCC") indicate that a range of coalproducts suitable for both the export and domestic markets may be extracted fromthe coal by upgrading from a simple crushing and sizing installation to astate-of-the-art Coal Processing Plant, utilising proven dense medium separationtechnology. This will allow the extraction of economic quantities of Semi-SoftCoking Coal (CSN 3 to 4) and/or PCI grade coal (ash 8% air dried), both of whichare used in steel making processes, as well as export quality thermal coal (6800kcal/kg air dried basis). Detailed properties of all potential products are being determined to evaluatethe optimum target markets and project economics. On this basis, additional coresampling of larger diameter drill holes (200 mm) will be necessary to determinethe process equipment requirements, potential product mix and comprehensive coalquality specifications for the planned coal production. Extraction of premium coal products from Phulbari has implications for the CoalHandling and Process Plant designs being built into the on-going DefinitiveFeasibility Study ("DFS"). The engineering studies of Run-of-Mine coal handling,process plant requirements, and product handling at the Project's planned mineand port are being expanded accordingly. The coal processing and engineeringwork is being undertaken in concert by GHD Pty Ltd and QCC, Asia Energy'sconsultants in these fields. Similarly, changes are required to the DFS marketing study to take account ofthe potential to mine these higher value products. AME Mineral Economics, basedin Sydney, Australia, were recently appointed to provide an analysis of existingand future markets for coal products from the Project. "The presence of these premium coal products within the Phulbari coal measuresshould significantly broaden the potential markets for the Company's future coalproduction and enhance the project economics", commented Asia Energy's JointManaging Director Mr David Lenigas. ABOUT ASIA ENERGY PLC Asia Energy PLC is a London-based AIM quoted company whose primary activity isthe development of an open cast coal mine at Phulbari in north-west Bangladeshwhich has been projected to produce 15 million tonnes of high quality coal peryear. The Company is currently carrying out an intensive drilling programme onthe basin as part of the DFS that is due for completion in 2005 with theobjective to start mining at Phulbari in 2007. The DFS will further define thedeposit, which has potential reserves in excess of 400 million tonnes of HighVolatile, Low Sulphur bituminous coal. Asia Energy has agreements in place with the government of Bangladesh for thedevelopment and exploitation of the mine which is located 30 metres above sealevel, a distance from the country's flood-prone deltas. The company iscommitted to developing the mine in an environmentally and socially responsiblemanner in accordance with the highest international standards, and to this aimis conducting an Environmental Impact Assessment and Social Impact Assessment. The Phulbari mine will export coal to neighbouring India and to Asia's majorseaborne markets, and in addition to tax and royalty revenues will also providea vital new long-term source of sustainable energy to Bangladesh. As part of thedevelopment project, Asia Energy will also conduct a separate feasibility studyfor a mine-mouth power station. ENQUIRIES: Michael Frayne, Joint Managing Director Justine Howarth, Cathy Malins michael.frayne@asia-energy.com Parkgreen CommunicationsDavid Lenigas, Joint Managing Director Tel: +44 (0) 20 7493 3713 david.lenigas@asia-energy.com Justine.howarth@parkgreenmedia.comAsia Energy PLC cathy.malins@parkgreenmedia.comTel: +44 (0) 20 7409 0890, Fax: +44 (0) 20 7409 2750info@asia-energy.com; www.asia-energy.com Laith Reynolds, Executive Director (CEO- Bangladesh)Bangladesh: +8801733011445 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Mar 20234:44 pmRNSShare issue – Consultants & Director
22nd Mar 20237:00 amRNSInterim Results 6 months ended 31 December 2022
20th Mar 20237:00 amRNSAdvisor Update
18th Jan 202311:37 amRNSResults of AGM
9th Jan 20232:05 pmRNSSecond Price Monitoring Extn
9th Jan 20232:00 pmRNSPrice Monitoring Extension
9th Jan 20237:00 amRNSProposed Solar Project - JDA
19th Dec 20221:59 pmRNSFinal Results and Notice of AGM
12th Dec 20227:00 amRNSMOU Extension – Phulbari Coal Mine Development
4th Nov 202211:05 amRNSSecond Price Monitoring Extn
4th Nov 202211:00 amRNSPrice Monitoring Extension
4th Nov 20229:05 amRNSSecond Price Monitoring Extn
4th Nov 20229:00 amRNSPrice Monitoring Extension
9th Sep 20222:05 pmRNSSecond Price Monitoring Extn
9th Sep 20222:00 pmRNSPrice Monitoring Extension
8th Sep 20222:05 pmRNSSecond Price Monitoring Extn
8th Sep 20222:00 pmRNSPrice Monitoring Extension
22nd Aug 20224:40 pmRNSSecond Price Monitoring Extn
22nd Aug 20224:35 pmRNSPrice Monitoring Extension
22nd Aug 20221:21 pmRNSProject Update and Extended Consultancy Agreement
8th Aug 20224:40 pmRNSSecond Price Monitoring Extn
8th Aug 20224:35 pmRNSPrice Monitoring Extension
7th Apr 20225:25 pmRNSShare issue – Consultants & Director
25th Mar 20227:00 amRNSInterim Results 6 months ended 31 December 2021
18th Mar 20223:33 pmRNSHolding(s) in Company
18th Mar 20223:30 pmRNSHolding(s) in Company
17th Mar 20221:35 pmRNSHolding(s) in Company
15th Mar 20221:38 pmRNSHolding(s) in Company
15th Mar 20221:34 pmRNSHolding(s) in Company
15th Mar 20221:28 pmRNSHolding(s) in Company
11th Mar 20223:00 pmRNSExtension of PowerChina Joint Venture Agreements
3rd Mar 20228:51 amRNSREPLACEMENT Placing & Subscription to raise £2.13m
2nd Mar 20224:41 pmRNSSecond Price Monitoring Extn
2nd Mar 20224:36 pmRNSPrice Monitoring Extension
2nd Mar 20224:13 pmRNSPlacing and Subscription to raise £2,130,000
31st Jan 20224:42 pmRNSSecond Price Monitoring Extn
31st Jan 20224:37 pmRNSPrice Monitoring Extension
31st Jan 20222:58 pmRNSFinancing Update
31st Jan 20222:06 pmRNSSecond Price Monitoring Extn
31st Jan 20222:01 pmRNSPrice Monitoring Extension
21st Jan 20224:40 pmRNSSecond Price Monitoring Extn
21st Jan 20224:35 pmRNSPrice Monitoring Extension
20th Jan 20222:28 pmRNSResult of AGM
5th Jan 20229:05 amRNSSecond Price Monitoring Extn
5th Jan 20229:00 amRNSPrice Monitoring Extension
22nd Dec 20217:00 amRNSFinal Results for the year ended 30 June 2021
23rd Nov 20213:40 pmRNSMOU Extension – Phulbari Coal Mine Development
1st Nov 20217:00 amRNSResignation of Director
19th Oct 20212:06 pmRNSSecond Price Monitoring Extn
19th Oct 20212:01 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.