Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFlowgroup Regulatory News (FLOW)

  • There is currently no data for FLOW

First DC100 Data Centre Installation goes live

24 Apr 2012 07:00

RNS Number : 9180B
Energetix Group plc
24 April 2012
 



 

Energetix Group plc

("Energetix" or "the Group")

 

First DC100 Data Centre Installation goes live

 

Energetix Group plc, (AIM: EGX), which develops and commercialises alternative and efficient energy products, announces that the three DC100 compressed air batteries supplied to the Co-operative Financial Services ("CFS") by its subsidiary Energetix Pnu Power Limited, have gone live.

 

This 400kVA 300kW (200kW N+1) system now provides backup power to the data processing facility (Call Centre) and data centre in the prestigious Co-operative Bank Pyramid building in Stockport UK and is the prime backup system for the site. As part of the agreement Energetix can use this installation for marketing; providing a high profile demonstration site for the Pnu Power data centre solution which is both highly reliable and reduces energy costs and CO2 emissions. 

The Co-operative Banking Group operates through the brands The Co-operative Bank, The Co-operative Insurance, The Co-operative Investments, The Co-operative Asset Management, Britannia, Platform and smile, the internet bank. CFS was the Regional winner for Europe of the Most Sustainable Bank of the Year award at the FT/IFC sustainable bank awards 2011.

 

DC100's flexible backup time, high efficiency and low maintenance are key benefits of the design. Internal estimates suggest that a typical 2MW Data Centre could save more than £1.75 million of electricity over its 20 year life by installing the Pnu Power DC100 solution rather than a typical rotary system, and also reduce total CO2 emissions by over 90% over that period.

 

To date, the Pnu Power product range has been sold in to the telecommunications and grid switching markets with systems in the 2kW to 20kW range. This installation at the Pyramid Building will increase the product range up to 300 kW and will be the first system deployed in the higher powered data centre market.

 

Adrian Hutchings, Chief Executive Officer of Energetix, stated: "We are delighted that our products are now running live at such a prestigious reference site. We are very pleased that Co-operative Financial Services has agreed that we can use this installation as a demonstration and reference point to the wider data centre market."

 

-ENDS -

 

For further information please contact:

 

Energetix Group plc

www.energetixgroup.com

Adrian Hutchings, Chief Executive Officer

Tel: +44 (0)151 348 2111

 

 

Cenkos Securities plc (NOMAD & Broker)

www.cenkos.com

Stephen Keys / Adrian Hargrave (Corporate Finance / Nomad)

Julian Morse (Sales)

Tel: +44 (0)20 7397 8900

 

 

Walbrook PR Ltd

Tel: +44 (0)20 7933 8780

Paul McManus (Media Relations)

paul.mcmanus@walbrookpr.com

Paul Cornelius (Investor Relations)

paul.cornelius@walbrookpr.com

 

 

About Energetix Group plc

 

Energetix Group plc is a developer of cost-effective products to meet the growing global demand for alternative energy, with particular focus on distributed generation, energy storage, and energy efficiency. Currently Energetix has two subsidiary businesses:

 

Genlec  - distributed energy generation for domestic dwellings.

 

Pnu Power - back-up power for the Telecom, Technology and power transmission markets.

 

In addition, Energetix has a c.27% stake in VPhase plc, an energy efficiency business Energetix created and subsequently spun out of Energetix in 2010. VPhase is now a standalone independently funded commercial venture.

 

With all technology development now completed Energetix is well positioned as both its subsidiaries move into the latter phases of commercialisation with their best-of-breed solutions.

 

Genlec

Genlec has developed a highly efficient, compact and light weight, wall mounted microCHP (Combined Heat and Power) appliance known as the Kingston Boiler. The Kingston boiler is specifically designed to generate 1kW of electrical power to meet the UK's Microgeneration Certification Scheme (MCS) to enable UK owners to receive the Government's 10p/ kWh feed in tariff for approved microCHP devices. The Kingston boiler therefore has an inherent low total cost of ownership (initial outlay plus maintenance) and has already demonstrated industry leading payback cycles which many analysts believe is the key to unlocking this significant market opportunity.

 

In February Energetix announced its intention to create a unique dual fuel energy company to provide free Kingston microCHP boilers to its customers in return for a commitment to purchase gas and electricity for a fixed period. In March Genlec received Unit Verification for the first of its Kingston microCHP Delta production engineered units and in April it acquired an electricity supply licence.

 

Pnu Power

Pnu Power focuses on the provision of compressed air back-up power which can ensure an uninterruptible power supply for critical systems, particularly for the telecoms, data centre and power transmission markets. Pnu Power range has been extended to include the DC100 product that can now meet the demand of the rapidly growing Green Data Centre market, providing a low carbon alternative to flywheels. Pnu Power has been successful in achieving repeat trial sales and is now poised to move out of the trial sales phase and into full volume commercial sales.

 

Energetix Group joined AIM in August 2006. The Group and its subsidiaries and associates are all based near Chester, NW England

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEZLBLLZFXBBF
Date   Source Headline
7th Oct 20157:00 amRNSChange of Adviser
29th Sep 20157:25 amRNSDirector/PDMR Shareholding
28th Sep 20157:00 amRNSHalf Yearly Report
15th Sep 20157:00 amRNSNotice of Results
22nd Jul 201511:58 amRNSDirector/PDMR Shareholding
30th Jun 201512:10 pmRNSResult of AGM
30th Jun 20157:00 amRNSAGM Statement
18th Jun 20157:00 amRNSDirector/PDMR Shareholding
17th Jun 201511:13 amRNSDirector/PDMR Shareholding
16th Jun 20157:00 amRNSReduction of boiler installations for 2015
4th Jun 201511:05 amRNSPosting of Annual Report & Notice of AGM
26th May 20157:01 amRNSFinal Results
22nd May 20159:20 amRNSHolding(s) in Company
20th May 20155:15 pmRNSHolding(s) in Company
18th May 20152:24 pmRNSResult of Open Offer and Result of General Meeting
18th May 20157:00 amRNSResult of Open Offer
30th Apr 20157:00 amRNSFirm Placing & Open Offer
9th Apr 20157:00 amRNSCE Type Approval and Sales Update
31st Mar 20157:00 amRNSGrowth of energy business
10th Mar 20157:03 amRNSPre-close statement
10th Feb 20157:00 amRNSMOU agreement with entu
9th Feb 20157:00 amRNSLaunch of boiler marketing campaigns
2nd Feb 201512:01 pmRNSInnovators & Investors Forum
28th Jan 201511:56 amRNSStmnt re Share Price Movement
26th Jan 201510:39 amRNSLaunch of Flow boiler & Shareholder newsletter
22nd Jan 20152:09 pmRNSDirector/PDMR Shareholding
22nd Jan 201510:47 amRNSCompany presentation
9th Jan 20153:17 pmRNSOfficial launch date confirmed for Flow boiler
29th Dec 201410:20 amRNSHolding(s) in Company
10th Dec 20143:51 pmRNSGrant of Share Options
1st Dec 20147:00 amRNSDeal with Finance Provider
25th Nov 20147:00 amRNSAppointment of Chief Financial Officer
24th Nov 20147:00 amRNSExpansion of Jabil manufacturing deal
20th Nov 20147:00 amRNSPublication of Shareholder Newsletter
18th Nov 20147:00 amRNSInitiation of Flow boiler production
14th Nov 20146:27 pmRNSHolding(s) in Company
30th Oct 20147:00 amRNSDirector/PDMR Shareholding
23rd Oct 20147:00 amRNSDirector/PDMR Shareholding
20th Oct 20142:16 pmRNSHolding(s) in Company
7th Oct 20143:33 pmRNSDirector Dealing
3rd Oct 20142:22 pmRNSHolding(s) in Company
30th Sep 20147:00 amRNSInterim Results
25th Sep 20141:28 pmRNSSite Visit
24th Sep 20147:00 amRNSTesting agreement with major energy company
17th Sep 20147:00 amRNSNotice of Results
16th Sep 20147:00 amRNSMoU with NRG Energy, Inc.
5th Sep 201410:34 amRNSPresentation at the Stock Market Show
22nd Aug 20142:23 pmRNSHolding(s) in Company
13th Aug 20147:00 amRNSHeads of Terms signed with Mears
28th Jul 20147:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.