Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFlowgroup Regulatory News (FLOW)

  • There is currently no data for FLOW

First DC100 Data Centre Installation goes live

24 Apr 2012 07:00

RNS Number : 9180B
Energetix Group plc
24 April 2012
 



 

Energetix Group plc

("Energetix" or "the Group")

 

First DC100 Data Centre Installation goes live

 

Energetix Group plc, (AIM: EGX), which develops and commercialises alternative and efficient energy products, announces that the three DC100 compressed air batteries supplied to the Co-operative Financial Services ("CFS") by its subsidiary Energetix Pnu Power Limited, have gone live.

 

This 400kVA 300kW (200kW N+1) system now provides backup power to the data processing facility (Call Centre) and data centre in the prestigious Co-operative Bank Pyramid building in Stockport UK and is the prime backup system for the site. As part of the agreement Energetix can use this installation for marketing; providing a high profile demonstration site for the Pnu Power data centre solution which is both highly reliable and reduces energy costs and CO2 emissions. 

The Co-operative Banking Group operates through the brands The Co-operative Bank, The Co-operative Insurance, The Co-operative Investments, The Co-operative Asset Management, Britannia, Platform and smile, the internet bank. CFS was the Regional winner for Europe of the Most Sustainable Bank of the Year award at the FT/IFC sustainable bank awards 2011.

 

DC100's flexible backup time, high efficiency and low maintenance are key benefits of the design. Internal estimates suggest that a typical 2MW Data Centre could save more than £1.75 million of electricity over its 20 year life by installing the Pnu Power DC100 solution rather than a typical rotary system, and also reduce total CO2 emissions by over 90% over that period.

 

To date, the Pnu Power product range has been sold in to the telecommunications and grid switching markets with systems in the 2kW to 20kW range. This installation at the Pyramid Building will increase the product range up to 300 kW and will be the first system deployed in the higher powered data centre market.

 

Adrian Hutchings, Chief Executive Officer of Energetix, stated: "We are delighted that our products are now running live at such a prestigious reference site. We are very pleased that Co-operative Financial Services has agreed that we can use this installation as a demonstration and reference point to the wider data centre market."

 

-ENDS -

 

For further information please contact:

 

Energetix Group plc

www.energetixgroup.com

Adrian Hutchings, Chief Executive Officer

Tel: +44 (0)151 348 2111

 

 

Cenkos Securities plc (NOMAD & Broker)

www.cenkos.com

Stephen Keys / Adrian Hargrave (Corporate Finance / Nomad)

Julian Morse (Sales)

Tel: +44 (0)20 7397 8900

 

 

Walbrook PR Ltd

Tel: +44 (0)20 7933 8780

Paul McManus (Media Relations)

paul.mcmanus@walbrookpr.com

Paul Cornelius (Investor Relations)

paul.cornelius@walbrookpr.com

 

 

About Energetix Group plc

 

Energetix Group plc is a developer of cost-effective products to meet the growing global demand for alternative energy, with particular focus on distributed generation, energy storage, and energy efficiency. Currently Energetix has two subsidiary businesses:

 

Genlec  - distributed energy generation for domestic dwellings.

 

Pnu Power - back-up power for the Telecom, Technology and power transmission markets.

 

In addition, Energetix has a c.27% stake in VPhase plc, an energy efficiency business Energetix created and subsequently spun out of Energetix in 2010. VPhase is now a standalone independently funded commercial venture.

 

With all technology development now completed Energetix is well positioned as both its subsidiaries move into the latter phases of commercialisation with their best-of-breed solutions.

 

Genlec

Genlec has developed a highly efficient, compact and light weight, wall mounted microCHP (Combined Heat and Power) appliance known as the Kingston Boiler. The Kingston boiler is specifically designed to generate 1kW of electrical power to meet the UK's Microgeneration Certification Scheme (MCS) to enable UK owners to receive the Government's 10p/ kWh feed in tariff for approved microCHP devices. The Kingston boiler therefore has an inherent low total cost of ownership (initial outlay plus maintenance) and has already demonstrated industry leading payback cycles which many analysts believe is the key to unlocking this significant market opportunity.

 

In February Energetix announced its intention to create a unique dual fuel energy company to provide free Kingston microCHP boilers to its customers in return for a commitment to purchase gas and electricity for a fixed period. In March Genlec received Unit Verification for the first of its Kingston microCHP Delta production engineered units and in April it acquired an electricity supply licence.

 

Pnu Power

Pnu Power focuses on the provision of compressed air back-up power which can ensure an uninterruptible power supply for critical systems, particularly for the telecoms, data centre and power transmission markets. Pnu Power range has been extended to include the DC100 product that can now meet the demand of the rapidly growing Green Data Centre market, providing a low carbon alternative to flywheels. Pnu Power has been successful in achieving repeat trial sales and is now poised to move out of the trial sales phase and into full volume commercial sales.

 

Energetix Group joined AIM in August 2006. The Group and its subsidiaries and associates are all based near Chester, NW England

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEZLBLLZFXBBF
Date   Source Headline
19th Jun 20177:00 amRNSUpdate on Fundraising
15th Jun 20175:40 pmRNSHolding(s) in Company
15th Jun 20174:48 pmRNSHolding(s) in Company
15th Jun 20174:28 pmRNSHolding(s) in Company
14th Jun 20173:30 pmRNSCompletion of Transaction
14th Jun 20173:30 pmRNSDirector/PDMR Shareholding
14th Jun 20172:49 pmRNSHolding(s) in Company
14th Jun 20179:22 amRNSHolding(s) in Company
13th Jun 201711:53 amRNSHolding(s) in Company
12th Jun 201711:33 amRNSResult of General Meeting & Issue of Equity
9th Jun 20172:25 pmRNSResult of Open Offer
1st Jun 20175:03 pmRNSHolding(s) in Company
30th May 20174:12 pmRNSHolding(s) in Company
25th May 20172:54 pmRNSPosting of Circular
25th May 20178:00 amRNSResult of PrimaryBid Offer
24th May 20175:12 pmRNSPrimaryBid Offer
24th May 20175:00 pmRNSFundraising of up to £29 million
11th May 20177:00 amRNSResponse re. press speculation
24th Mar 201710:00 amRNSUpdate re Jabil
21st Mar 20177:00 amRNSFlow Energy update
9th Feb 20177:00 amRNSMicroCHP Feed-in Tariff (FIT) update
8th Feb 20177:00 amRNSUpdate
13th Jan 20174:15 pmRNSHolding(s) in Company
5th Dec 20167:00 amRNSReiteration of hedging strategy for energy prices
16th Nov 20167:00 amRNSUpdate
5th Sep 20167:00 amRNSHalf-year Report
23rd Aug 20163:26 pmRNSNotice of Results
27th Jun 20169:09 amRNSFlowgroup welcomes CMA's energy competition report
23rd Jun 201611:14 amRNSResult of AGM
23rd Jun 20167:00 amRNSAGM Statement
27th May 20162:57 pmRNSDECC FiT consultation & Flow Energy growth update
19th May 20164:47 pmRNSPosting of Annual Report & Notice of AGM
29th Apr 20167:01 amRNSFinal Results
29th Apr 20167:00 amRNSAgreements with Daikin Europe NV
25th Apr 20167:00 amRNSTrial of Flow boiler in Italian market
15th Apr 20164:53 pmRNSAdoption of Financial Reporting Standard FRS102
14th Apr 20163:18 pmRNSFirst commercial Flow boiler installs complete
8th Apr 20162:46 pmRNSEU Commission publishes VAT action plan
4th Apr 20167:00 amRNSAward of MCS accreditation and commercial update
10th Mar 201612:55 pmRNSFlowgroup welcomes CMA findings
1st Mar 20167:00 amRNSLaunch of new connected home product range
29th Feb 20167:00 amRNSNotice of Results
18th Jan 20167:00 amRNSFlow Energy: Which? Recommended Provider Status
6th Jan 20167:00 amRNSFlow Energy update
24th Dec 20157:00 amRNSContract with Shell now unconditional
15th Dec 20157:00 amRNSManagement Options
14th Dec 20157:00 amRNSRelaunch of Flow boiler & new boiler energy tariff
9th Dec 20157:01 amRNSDirectorate Change
9th Dec 20157:00 amRNSFive year contract with Shell
4th Nov 201512:07 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.