Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFlowgroup Regulatory News (FLOW)

  • There is currently no data for FLOW

First DC100 Data Centre Installation goes live

24 Apr 2012 07:00

RNS Number : 9180B
Energetix Group plc
24 April 2012
 



 

Energetix Group plc

("Energetix" or "the Group")

 

First DC100 Data Centre Installation goes live

 

Energetix Group plc, (AIM: EGX), which develops and commercialises alternative and efficient energy products, announces that the three DC100 compressed air batteries supplied to the Co-operative Financial Services ("CFS") by its subsidiary Energetix Pnu Power Limited, have gone live.

 

This 400kVA 300kW (200kW N+1) system now provides backup power to the data processing facility (Call Centre) and data centre in the prestigious Co-operative Bank Pyramid building in Stockport UK and is the prime backup system for the site. As part of the agreement Energetix can use this installation for marketing; providing a high profile demonstration site for the Pnu Power data centre solution which is both highly reliable and reduces energy costs and CO2 emissions. 

The Co-operative Banking Group operates through the brands The Co-operative Bank, The Co-operative Insurance, The Co-operative Investments, The Co-operative Asset Management, Britannia, Platform and smile, the internet bank. CFS was the Regional winner for Europe of the Most Sustainable Bank of the Year award at the FT/IFC sustainable bank awards 2011.

 

DC100's flexible backup time, high efficiency and low maintenance are key benefits of the design. Internal estimates suggest that a typical 2MW Data Centre could save more than £1.75 million of electricity over its 20 year life by installing the Pnu Power DC100 solution rather than a typical rotary system, and also reduce total CO2 emissions by over 90% over that period.

 

To date, the Pnu Power product range has been sold in to the telecommunications and grid switching markets with systems in the 2kW to 20kW range. This installation at the Pyramid Building will increase the product range up to 300 kW and will be the first system deployed in the higher powered data centre market.

 

Adrian Hutchings, Chief Executive Officer of Energetix, stated: "We are delighted that our products are now running live at such a prestigious reference site. We are very pleased that Co-operative Financial Services has agreed that we can use this installation as a demonstration and reference point to the wider data centre market."

 

-ENDS -

 

For further information please contact:

 

Energetix Group plc

www.energetixgroup.com

Adrian Hutchings, Chief Executive Officer

Tel: +44 (0)151 348 2111

 

 

Cenkos Securities plc (NOMAD & Broker)

www.cenkos.com

Stephen Keys / Adrian Hargrave (Corporate Finance / Nomad)

Julian Morse (Sales)

Tel: +44 (0)20 7397 8900

 

 

Walbrook PR Ltd

Tel: +44 (0)20 7933 8780

Paul McManus (Media Relations)

paul.mcmanus@walbrookpr.com

Paul Cornelius (Investor Relations)

paul.cornelius@walbrookpr.com

 

 

About Energetix Group plc

 

Energetix Group plc is a developer of cost-effective products to meet the growing global demand for alternative energy, with particular focus on distributed generation, energy storage, and energy efficiency. Currently Energetix has two subsidiary businesses:

 

Genlec  - distributed energy generation for domestic dwellings.

 

Pnu Power - back-up power for the Telecom, Technology and power transmission markets.

 

In addition, Energetix has a c.27% stake in VPhase plc, an energy efficiency business Energetix created and subsequently spun out of Energetix in 2010. VPhase is now a standalone independently funded commercial venture.

 

With all technology development now completed Energetix is well positioned as both its subsidiaries move into the latter phases of commercialisation with their best-of-breed solutions.

 

Genlec

Genlec has developed a highly efficient, compact and light weight, wall mounted microCHP (Combined Heat and Power) appliance known as the Kingston Boiler. The Kingston boiler is specifically designed to generate 1kW of electrical power to meet the UK's Microgeneration Certification Scheme (MCS) to enable UK owners to receive the Government's 10p/ kWh feed in tariff for approved microCHP devices. The Kingston boiler therefore has an inherent low total cost of ownership (initial outlay plus maintenance) and has already demonstrated industry leading payback cycles which many analysts believe is the key to unlocking this significant market opportunity.

 

In February Energetix announced its intention to create a unique dual fuel energy company to provide free Kingston microCHP boilers to its customers in return for a commitment to purchase gas and electricity for a fixed period. In March Genlec received Unit Verification for the first of its Kingston microCHP Delta production engineered units and in April it acquired an electricity supply licence.

 

Pnu Power

Pnu Power focuses on the provision of compressed air back-up power which can ensure an uninterruptible power supply for critical systems, particularly for the telecoms, data centre and power transmission markets. Pnu Power range has been extended to include the DC100 product that can now meet the demand of the rapidly growing Green Data Centre market, providing a low carbon alternative to flywheels. Pnu Power has been successful in achieving repeat trial sales and is now poised to move out of the trial sales phase and into full volume commercial sales.

 

Energetix Group joined AIM in August 2006. The Group and its subsidiaries and associates are all based near Chester, NW England

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEZLBLLZFXBBF
Date   Source Headline
22nd Dec 20097:00 amRNSPre-Close Trading Update
18th Dec 20097:00 amRNSContract Win
3rd Dec 20091:00 pmRNSDirector/PDMR Shareholding
26th Nov 20092:50 pmRNSScottish & Southern Energy trial of VPhase units
24th Nov 20094:50 pmRNSDirector/PDMR Shareholding
15th Sep 20097:00 amRNSInterim Results
15th Sep 20097:00 amRNSInterim Results
28th Aug 200912:00 pmRNSTotal Voting Rights
19th Aug 20097:00 amRNSContract Win from National Grid UK
14th Aug 20097:00 amRNSNotice of Interim Results
14th Aug 20097:00 amRNSNotice of Interim Results
6th Aug 20097:00 amRNSIssue of Equity
6th Jul 200912:30 pmRNSAppointment of new Nominated Adviser and Broker
6th Jul 200912:30 pmRNSAppointment of new Nominated Adviser and Broker
15th Jun 20097:00 amRNSSubsidiary VPhase achieves CE Certification
15th Jun 20097:00 amRNSVPhase achieves CE Certification
4th Jun 200912:25 pmRNSIssue of Equity
1st Jun 200911:10 amRNSHolding(s) in Company
20th May 20092:22 pmRNSResult of General Meeting
20th May 20091:19 pmRNSResult of General Meeting
23rd Apr 20097:00 amRNSPnu Power order
23rd Mar 20097:00 amRNSPreliminary Results
23rd Mar 20097:00 amRNSPreliminary Results
6th Mar 20098:32 amRNSHolding(s) in Company
6th Mar 20097:00 amRNSNotice of Results
6th Mar 20097:00 amRNSNotice of Results
11th Feb 20097:01 amRNSEnergetix Pnu Power awarded CE certification
11th Feb 20097:00 amRNSEnergetix Pnu Power order from Telecom Italia
28th Jan 20097:00 amRNSOfgem approves SSE trials of VPhase VX1 product
26th Jan 20097:00 amRNSCombiVolt Boiler Product Agreement with Daalderop
22nd Jan 20093:30 pmRNSBoard Changes and Issue of Share Options
15th Dec 20087:00 amRNSFurther collaboration with E.ON
10th Dec 20087:00 amRNSContract for Pnu Power Units
11th Nov 20087:00 amRNSLaunch of Genlec micro-CHP by Energy Minister
23rd Oct 20087:00 amRNSAgreement with Stiebel Eltron GmbH
13th Oct 20087:00 amRNSMoU with British Gas Services
8th Oct 20087:00 amRNSIssue of Equity
1st Oct 20087:00 amRNSChinese patent granted for Pnu Power
30th Sep 20081:36 pmRNSHolding(s) in Company
16th Sep 20087:01 amRNSInterim Results
3rd Sep 20087:00 amRNSNotice of Interim Results
3rd Sep 20087:00 amRNSNotice of Interim Results
14th Aug 200811:58 amRNSIssue of Equity
7th Jul 200811:59 amRNSHolding(s) in Company
7th Jul 200811:58 amRNSHolding(s) in Company
26th Jun 20088:15 amRNSMinisterial tour and televisi
18th Jun 20083:51 pmRNSAIM Rule 20
18th Jun 20087:00 amRNSGenlec agreement with further
9th Jun 20087:00 amRNSIssue of Equity
23rd May 200811:45 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.